Current location - Quotes Website - Signature design - Sample of farmer’s house construction contract
Sample of farmer’s house construction contract

Sample contract for rural housing construction project:

Party A:

Party B:

Party A builds a house in? The building has two floors, the first floor is about ? square meters, and the second floor is about ? square meters. The construction is contracted by Party B. Based on the principles of equality, mutual benefit, and good faith, both parties ensure that the project is safe, high-quality, efficient, and low-cost. After negotiation, both parties agree to sign this contract with the hope of mutually abiding by:

1. Contracting method

Contracting shall be done by contracting work but not materials.

Party A provides the materials needed for building the house, including: red bricks, river sand, gravel, lime, cement, steel, water pipes, sewer pipes, nails, wire, water and electricity, etc. Material.

Party B provides labor services, construction technology, construction tools, and all tools for production and living.

2. Construction Project

Party B shall undertake the construction in accordance with the design drawings or the requirements put forward by Party A. The construction of the main project of Party A's house, including walls, beams, columns, stairs, floors, formwork installation, removal of formwork, reinforcement, cast-in-place concrete and ground, concrete cushion for front steps; decorative interior rough painting, front and exterior Install ceramic tiles on the walls, flour-cement mortar on the rear exterior wall, ceramic tiles on the bathroom floor and walls, install porcelain basins, sewer pipes, and downpipes; grout and polish the top layer, and perform anti-penetration treatment at the same time.

3. Contracting price

RMB per square meter is capitalized: xx yuan, and the building area is calculated based on the exterior wall of each floor. The construction scope includes all walls that require cement mortar plastering.

4. Payment method

After the contract is signed, the tools arrive at the site, and the personnel are in place, 30% is paid in advance, and 50% is paid after the first layer of bricks is completed and the floor is finished. After completing the second floor and the roof, 75% of the payment will be 8,000 yuan. The project will be completed and 90% will be paid upon completion of inspection. 10% will be reserved as a quality deposit. If there are no quality problems within one year of completion, the balance will be paid.

5. Responsibilities of both parties

Party A is responsible for the supply of water and electricity, the timely arrival of raw materials, and daily lunch.

Party B must ensure the quality and progress of the project, construct the project in accordance with the design drawings and Party A’s requirements, save materials, and keep the materials well and not lose them.

6. Quality Requirements

Party B shall organize the construction in accordance with the national house quality standards and requirements. If the house is not up to standard, Party B will be responsible for rework, and the rework fee will be borne by Party B or Party A will pay for it at Party B’s expense. Deducted from the project payment.

7. Pay attention to safety

Labor protection measures, construction protection measures are in place, and construction is safe. If Party B's construction workers suffer work-related injuries due to their own reasons or Party B's inadequate safety protection measures, or if other accidents cause injuries to others due to construction, Party B will be responsible for everything, and Party A will not bear any responsibility or expense. Civilized construction, pay attention to professional ethics, and pay attention to cleanliness and hygiene.

8. Construction period requirements

The construction period of the main project is 75 (calendar days), calculated from the day after signing the contract. Party B must complete the main project before ?year?month? In case of postponement due to weather reasons, Party B cannot delay the completion of Party A's house construction for various reasons. If Party B needs materials, a plan should be proposed to Party A in advance for timely preparation.

9. Later Maintenance

Party B shall be responsible for the maintenance costs incurred due to Party B’s quality problems, and shall bear the relevant compensation and liability resulting therefrom

10. Others

Other matters not covered shall be resolved through negotiation between the two parties and shall be strictly implemented in accordance with national and local standards.

This contract is made in duplicate, with Party A and Party B each holding one copy, and it will take effect from the date of signature.

Party A’s signature (seal):

Party B’s signature (seal):

Extended information:

How to apply for a residence permit for rural residents Base and house building procedures

(1) Conditions for rural residents to apply for homestead land

Rural residents must meet the following conditions when applying for homestead land:

First, rural residents The age must be 18 years or above and meet the conditions for household separation;

Second, the construction of houses for rural residents must comply with the overall land use plan, annual land use plan and village and town construction plan;

Three It is the limit standard for rural residents to build houses.

The area standard for homesteads is: if cultivated land is used, the maximum is no more than 120 square meters; if other land is used, the maximum is no more than 140 square meters. In mountainous areas, wasteland can be used conditionally. , on barren slopes, the maximum area shall not exceed 160 square meters. Fourth, rural residents must build houses on a "one household, one foundation" basis; fifth, rural villagers who are renting out their original homesteads and then applying for homesteads after selling their original homesteads will not be approved; sixthly, non-farmers and other persons are strictly prohibited from purchasing homesteads in the village.

(2) Principles that farmers should follow when building houses

Rural residents should use the original homestead and vacant land in the village to build houses. Those who can use bad land must not occupy good land. Those who can occupy wasteland are not allowed to occupy cultivated land, and those who use state-owned land must go through transfer procedures.

(3) New approval procedures for farmers to apply for homestead land for building houses

1. To build a house, rural villagers must first apply to the collective economic organization or the urban management department;

2. The village collective economic organization will publish a list of households applying for building houses in a conspicuous place (more than 15 working days);

3. The Land and Resources Management Office and the town social affairs office will go to the site Conduct a preliminary review of whether the applicant meets the conditions and whether the proposed land conforms to the planning;

4. After the announcement period expires and there is no objection, the land users who meet the "one household, one base" condition will be reported to the township people's government in accordance with regulations After review, it will be reported to the county people's government for approval (those occupying agricultural land shall be reported to the municipal government for approval procedures for agricultural land conversion according to regulations).

5. After the homestead is approved, the Land and Resources Office and the town social affairs office will go to the site to approve the homestead, and issue a site selection opinion letter, planning permit, and construction permit ("one book and two certificates" ).

6. After the villagers’ houses are completed, the Land and Resources Office will go to the site to check whether the land is used according to the approved area and requirements, and issue collective land use certificates to the households that meet the requirements.

7. Villagers shall apply for a house ownership certificate based on the land use certificate and planning permit.

Baidu Encyclopedia-Self-built House