Current location - Quotes Website - Signature design - What information does the decoration company need to report the fire?
What information does the decoration company need to report the fire?
1. Construction application report (provided by the fire company and stamped with the official seal of the applicant)

2. Apply for a power of attorney for construction (provided by the fire company, providing a copy of the corporate ID card and a copy of the company's business license with official seal, and the applicant's official seal is required).

3. Copy of the house purchase contract or lease contract (the lease contract shall be filed with the Housing Authority and sealed by the reporting unit).

4. Fire protection design audit declaration form (provided by the fire protection company, with the official seals of the reporting unit and the decoration design unit)

5. The decoration company shall provide a set of decoration blueprints with dimensions above A3 (the first floor evacuation plan, the whole floor layout plan and the location of the reporting unit, cover, title page, floor layout plan, potential diagram "including socket diagram, lamp board diagram", power distribution system diagram, ceiling diagram, floor plan, drawing catalogue and decoration design description, and the drawings shall be stamped with the official seals of the reporting unit, design unit and construction unit).

note:

The exit should be marked with double door or single door, and the door opening direction should be outward.

In addition to the power distribution system diagram, the above drawings should also indicate the building axis. The floor plan should indicate the position and size of the openable window, the declared area of the unit and the windowable area, and draw a compass.

Please sign for each corresponding person in the picture frame (sign on wax paper).

6. The decoration company shall provide a copy of the qualification certificate and business license of the design unit and the construction unit 1 copy. (official seal required)

7. Fire blueprint (provided by the fire company and stamped with the official seal of the reporting unit)

8. Design documents (decoration design documents and fire protection design documents are stamped with the official seals of the decoration company and the fire protection company respectively, and the official seal of the reporting unit.