Interior Decoration Agreement 1 Party A:
Party B:
According to the indoor air quality standards stipulated by the Labor Price Quality Supervision, Inspection and Quarantine Bureau, the State Environmental Protection Administration and the Ministry of Health on March 1 20xx, and the Code for Indoor Pollution Control of Civil Construction Projects promulgated by People's Republic of China (PRC) and the Ministry of Construction, Party A and Party B have reached the following agreement on the decoration environment detection:
Rights of both parties:
I. Rights of Party A:
1. Party A has the right to apply to the national authoritative indoor environment testing agency for a comprehensive indoor air quality standard test after the decoration project has passed the quality acceptance, and may request the unit designated by Party B to conduct free indoor formaldehyde test for Party A. ..
2. Party A has the right to require Party B to meet the requirements of indoor air quality standards after the quality acceptance of decoration works.
3. If it still does not meet the above standards after being tested by the authoritative national indoor environment testing organization, Party A has the right to require Party B to make rectification, and the rectification period is one month. Over the project period, postponed. If it is still unqualified after rectification, Party A has the right to ask Party B to refund the decoration money in full.
Two. Rights of Party B
1. After the acceptance of decoration quality, if Party A requires air quality testing, the testing institution shall have at least CMA (Metrology Certification issued by Provincial Bureau of Technical Supervision) qualification. Party B carries out single formaldehyde test for Party A, and the testing institutions have the same qualifications.
2. If Party A requires comprehensive air quality testing and individual formaldehyde testing after the decoration quality acceptance, Party B has the right to request to participate in the selection of testing institutions and the whole testing process. The formaldehyde detection organization sent by Party B to Party A shall be designated by Party B and confirmed by Party A. ..
3. If Party A requires a single formaldehyde test, the testing organization shall be designated by Party B and confirmed by Party A. Indoor natural ventilation shall be conducted for at least 7 days (the daily ventilation interval shall not be less than 10 hour), and then it shall be closed for 10 to 12 hours before the test (the floor drain and sewer pipes must be completely closed), and the second stage shall not be regarded as project delay.
4. If Party A requires a comprehensive air quality test and a single formaldehyde test after the decoration quality acceptance, Party B has the right to require that the furniture, floor, stone and decorations purchased by Party A before the test are not allowed to enter the site.
5. If there is environmental pollution in the area where the decoration project is located, Party B has the right to refuse the test, and Party B will not bear any responsibility for the test results of Party A. ..
Obligations of both parties:
I. Obligations of Party A
1. Party A promises that all inspection items are Party B's construction items. If the inspection is unqualified due to the existence of non-Party B's construction items or engineering changes, additions and deletions without Party B's written consent, Party A shall bear the responsibilities.
2. Party A promises that the testing must be carried out in the presence of full-time personnel of Party A and Party B and personnel of testing institutions, otherwise the testing data will be invalid. If the inspection is delayed due to Party A's failure to be present in time, Party A shall bear corresponding responsibilities.
3. After the decoration quality is qualified, if Party A proposes a comprehensive inspection, the expenses other than in addition to formaldehyde inspection shall be paid by Party A in advance; Those who pass the inspection shall be paid by Party A; If the inspection is unqualified, it shall be borne by Party B, and it shall be rectified according to Articles 1 and 3 of the rights of both parties.
Two. Obligations of Party B
1. Party B promises that the testing must be carried out in the presence of Party A, Party B's full-time staff and testing agency personnel, otherwise the testing data will be invalid. If the inspection is delayed due to Party B's failure to arrive in time, Party B shall bear corresponding responsibilities.
2. Party B promises that if the comprehensive air quality test is unqualified after the decoration quality acceptance, the test cost will be borne by Party B, and Party A will do the formaldehyde single box test, but Party A will not bear this cost.
3. After the decoration quality is qualified, if the air quality comprehensive test and formaldehyde single test are unqualified, Party B promises to rectify the relevant projects, and the rectification period is one month. Over the project construction period, postponed. If it is still unqualified after rectification, Party B promises to refund the decoration money in full, and the contract between both parties is terminated.
As an annex to the construction contract, this agreement must be signed at the same time to be valid. Other matters not covered shall be settled by both parties through friendly negotiation. If no agreement can be reached, they can be settled through legal procedures.
This agreement is made in duplicate, one for each party, and shall come into effect as of the date of signature (seal) by both parties.
Party A:
Party B:
Representative of Party A:
Representative of Party B:
Date, year and month
Date, year and month
Interior Decoration Agreement 2 Party A (property management unit): _ _ _ _ _ Tel: _ _ _ _ _ Party B (decoration worker): _ _ _ _ _ Tel: _ _ _ _ _ _ _ _ Party C (decoration construction unit): _ _ _ ...
Party A (property management unit): _ _ _ _ Tel: _ _ _ _ _ _ _
Party B (Decorator): _ _ _ _ _ Tel: _ _ _ _ _ _ _
Party C (decoration construction unit): _ _ _ _ _ Tel: _ _ _ _ _ _ _
In order to standardize the activities and management behavior of residential interior decoration (hereinafter referred to as decoration) and maintain the normal order and public interests of residential areas, a fee agreement is reached on the decoration management service of _ _ _ _ _ _ _ _.
A, decoration engineering or scheme (can be attached)
1、_________;
2、_________;
3、_________;
4、_________。
Second, the decoration period
The renovation period is _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. In case of overdue renovation, Party B shall renew the Residential Interior Decoration Management Agreement with Party A. ..
Third, it is forbidden to decorate.
1. Destroy or change the main building and load-bearing structure without authorization;
2. Increase the floor load without authorization;
3. Punch holes in the load-bearing wall or expand the original size of doors and windows on the load-bearing wall, and remove the wall connecting the balcony;
4. Change the hall, room and balcony into toilets and kitchens, and use rainwater pipes to discharge domestic sewage;
5. Destroy the waterproof layer of bathroom and kitchen;
6, illegal construction of buildings and structures;
7. Destroy or change the appearance of the house without authorization, and open doors and windows on the non-bearing wall without authorization;
8. Altering or connecting gas pipeline facilities and public pipelines without authorization;
9. Occupy, damage or arbitrarily change the parts and facilities of the property;
10, other behaviors that affect the building structure and use safety.
Four, decoration management regulations
1. Decoration construction personnel shall wear a decoration pass when entering the residential area, and shall be inspected by Party A's personnel. Party B applied to Party A on _ _ _ _ _ _ _ _ _.
2. Decoration workers are generally not allowed to stay in the renovated residential room. If it is necessary to send someone to guard the construction site, Party B shall report and register with Party A..
3. Decoration construction shall comply with fire prevention regulations, and the job site shall be equipped with at least 2 fire extinguishers.
4. The construction time is 8:00- 12:00, 14:00- 18:00 every day, and construction is prohibited at other times.
5. During the decoration construction, Party C shall take protective measures for all kinds of pipeline openings to avoid the blockage caused by sundries entering the pipeline.
6. Party A has the right to take the following measures when performing management duties, and Party B and Party C shall not refuse or hinder them:
(1) Ask Party B or Party C to provide relevant information;
(2) Enter the decoration site for inspection;
(3) Stop the illegal decoration, and ask for suspension or rectification;
(4) report to the relevant government departments;
(5) Take _ _ _ _ _ measures;
(6)_________;
(7)_________。
Five, outdoor facilities and security doors, windows ` installation regulations
1, outdoor facilities such as air conditioners and solar water heaters. , should be installed in the predetermined position of architectural design, and the size should not exceed the design requirements. If there is no predetermined position in the original design, it shall be installed reasonably according to the unified position specification specified by Party A. Condensed water of air conditioner shall be connected to the pipeline without dripping.
2, outdoor safety doors and windows should be installed in accordance with the provisions, shall not violate the relevant laws and regulations.
3、_________。
Six, decoration materials and decoration garbage storage, removal and treatment
1. Decoration materials shall be stored inside the renovated house, and shall not be stacked in public places or places. Temporary stacking due to loading and unloading shall be cleaned up as soon as possible; If Party B or Party C fails to make proper arrangements after being notified by Party A, Party A has the right to dispose of it, and the disposal fee can be deducted from Party B's decoration deposit.
2, decoration garbage pickup in the following _ _ _ _ _ _ _ _ ways:
(1) Self-cleaning. Party B or Party C must clean up the decoration garbage piled up in the designated place before 18:00 every day; If the vehicle is not cleared on time, Party A will clear the vehicle on its behalf, and the clearing fee will be deducted from the decoration deposit, amounting to RMB _ _ _ _ _ _ _ _.
(2) Entrust Party A to clear and transport. Party B or Party C shall notify Party A one day before the garbage needs to be removed, and load or pack the decoration garbage and put it at the designated place. Party B or Party C shall pay Party A the renovation garbage cleaning fee of RMB _ _ _ _ _ _ _ _.
3、_________。
Seven, decoration deposit and management service fee
1. After this agreement is signed, Party B shall pay Party A the decoration deposit according to the following standards:
The residential property is _ _ _ _ _ _ _ yuan per household;
Non-residential property is _ _ _ _ _ _ _ yuan per household.
2. After the renovation project is completed, if it is confirmed by Party A that there is no illegal renovation and no behavior that harms the interests of the public and other owners, Party A will refund the renovation deposit to Party B within _ _ _ _ _ _ _ _ _ _.
3. Party B shall pay Party A the renovation service fee of RMB _ _ _ _ _ _ _ _ as agreed.
4、_________。
Eight. Other agreements
1. Party B shall immediately repair the damaged parts, facilities, equipment, pipeline blockage and leakage caused by renovation; Where economic losses are caused, Party B shall negotiate with the damaged person for reasonable compensation. If negotiation fails, you can apply for arbitration or bring a lawsuit. If it is the responsibility of Party C, Party B may claim compensation from Party C. ..
2、_________。
3、_________。
4、_________。
Party A (seal): _ _ _ _ _ Party B: _ _ _ _ _ _ _
Person in charge (signature): _ _ _ _ _ Decorator (signature): _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Party C (seal): _ _ _ _ _ _
Person in charge (signature): _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Article 3 of the Interior Decoration Agreement Party A:
Party B:
According to the indoor air quality standards promulgated by the State Administration of Labor Price, Quality Supervision, Inspection and Quarantine, the State Environmental Protection Administration and the Ministry of Health on, and the Code for Indoor Pollution Control of Civil Construction Projects promulgated by People's Republic of China (PRC) and the Ministry of Construction, Party A and Party B have reached the following agreement on the detection of decoration environment:
Rights of both parties:
I. Rights of Party A:
1. Party A has the right to apply to the national authoritative indoor environment testing agency for a comprehensive indoor air quality standard test after the decoration project has passed the quality acceptance, and may request the unit designated by Party B to conduct free indoor formaldehyde test for Party A. ..
2. Party A has the right to require Party B to meet the requirements of indoor air quality standards after the quality acceptance of decoration works.
3. If it still does not meet the above standards after being tested by the authoritative national indoor environment testing organization, Party A has the right to require Party B to make rectification, and the rectification period is one month. Over the project period, postponed. If it is still unqualified after rectification, Party A has the right to ask Party B to refund the decoration money in full.
Two. Rights of Party B
1. After the acceptance of decoration quality, if Party A requires air quality testing, the testing institution shall have at least CMA (Metrology Certification issued by Provincial Bureau of Technical Supervision) qualification. Party B carries out single formaldehyde test for Party A, and the testing institutions have the same qualifications.
2. If Party A requires comprehensive air quality testing and individual formaldehyde testing after the decoration quality acceptance, Party B has the right to request to participate in the selection of testing institutions and the whole testing process. The formaldehyde detection organization sent by Party B to Party A shall be designated by Party B and confirmed by Party A. ..
3. If Party A requires a single formaldehyde test, the testing organization shall be designated by Party B and confirmed by Party A. Indoor natural ventilation shall be conducted for at least 7 days (the daily ventilation interval shall not be less than 10 hour), and then it shall be closed for 10 to 12 hours before the test (the floor drain and sewer pipes must be completely closed), and the second stage shall not be regarded as project delay.
4. If Party A requires a comprehensive air quality test and a single formaldehyde test after the decoration quality acceptance, Party B has the right to require that the furniture, floor, stone and decorations purchased by Party A before the test are not allowed to enter the site.
5. If there is environmental pollution in the area where the decoration project is located, Party B has the right to refuse the test, and Party B will not bear any responsibility for the test results of Party A. ..
Obligations of both parties:
I. Obligations of Party A
1. Party A promises that all inspection items are Party B's construction items. If the inspection is unqualified due to the existence of non-Party B's construction items or engineering changes, additions and deletions without Party B's written consent, Party A shall bear the responsibilities.
2. Party A promises that the testing must be carried out in the presence of full-time personnel of Party A and Party B and personnel of testing institutions, otherwise the testing data will be invalid. If the inspection is delayed due to Party A's failure to be present in time, Party A shall bear corresponding responsibilities.
3. After the decoration quality is qualified, if Party A proposes a comprehensive inspection, the expenses other than in addition to formaldehyde inspection shall be paid by Party A in advance; Those who pass the inspection shall be paid by Party A; If the inspection is unqualified, it shall be borne by Party B, and it shall be rectified according to Articles 1 and 3 of the rights of both parties.
Two. Obligations of Party B
1. Party B promises that the testing must be carried out in the presence of Party A, Party B's full-time staff and testing agency personnel, otherwise the testing data will be invalid. If the inspection is delayed due to Party B's failure to arrive in time, Party B shall bear corresponding responsibilities.
2. Party B promises that if the comprehensive air quality test is unqualified after the decoration quality acceptance, the test cost will be borne by Party B, and Party A will do the formaldehyde single box test, but Party A will not bear this cost.
3. After the decoration quality is qualified, if the air quality comprehensive test and formaldehyde single test are unqualified, Party B promises to rectify the relevant projects, and the rectification period is one month. Over the project construction period, postponed. If it is still unqualified after rectification, Party B promises to refund the decoration money in full, and the contract between both parties is terminated.
As an annex to the construction contract, this agreement must be signed at the same time to be valid. Other matters not covered shall be settled by both parties through friendly negotiation. If no agreement can be reached, they can be settled through legal procedures.
This agreement is made in duplicate, one for each party, and shall come into effect as of the date of signature (seal) by both parties.
Party A: Party B:
Representative of Party A: Representative of Party B: