5 river management construction contracts (2022)

Contracts or agreements are generally just different names and names. As long as it does not violate laws and moral customs, the parties can arbitrarily agree on the name, content, and form of the contract or agreement, and it will be valid. Let me share with you some information about river management construction contracts. For more river management construction contracts, click "Contract Template" to view.

River Management Construction Contract 1

Party A:

Party B:

1. Project Name:

2. Project location:

3. Project content: (Including the main earthwork construction of the river and ancillary work to complete the main earthwork, including dam construction, demolition, and drainage Combined with filling flood control embankments, enclosures, etc.).

4. Engineering standards: 1. River course standards: bottom width meters, bottom elevation meters, slope ratio. According to the river construction specifications, the center line error is about ±20 cm, the river bottom elevation error is not greater than 3.0cm---20cm, and the average value is not higher than the design elevation; the bottom width is ±30 cm, and the average value is not less than the design bottom width; The local slope ratio is 1:n (1±5), the overall slope is not steeper than the design value (1:n), and other standards are implemented in accordance with relevant technical specifications. 2. Other requirements:

5. Civilized construction and project safety: Party B should conscientiously carry out civilized construction and do a good job in safety work. During the construction process, any economic compensation and safety liability accidents that are indeed caused by Party B’s responsibility will be caused by Party B is responsible.

6. Construction time: This project will be completed from month, year, to month, year, with a construction period of days.

7. Contract price and payment method: The total amount of earthwork to be constructed is tentatively m3, the comprehensive unit price is yuan/m3, and the tentative total contract price is yuan (lowercase yuan). The installment payment method is . The final settlement of the project shall be based on the project quantity approved by the supervisor.

8. Responsibilities of both parties:

Party A’s responsibilities:

1. Before starting work, Party A shall clarify the tasks related to project construction in accordance with relevant documents and specifications. and requirements. 2. After Party A receives the construction commencement application or construction commencement report submitted by Party B, it shall organize review and approval in a timely manner. 3. Party A shall provide Party B with the relevant conditions for organizing the construction according to the content of the bidding documents or the consensus reached through consultation. 4. Party A shall pay on time according to the payment method specified in this contract. 5. Party A should promptly coordinate conflicts during the construction process. Party B's responsibilities: 1. Party B guarantees to complete the project tasks on time and with high quality according to the contents of the contract (including bidding documents and written documents agreed upon by both parties). If the project is completed overdue, liquidated damages of RMB/day will be deducted. 2. Party B must complete all construction-related procedures in accordance with regulations before starting construction, including: paying a recurring deposit of RMB before signing the contract; providing Party A with a construction plan; starting report, etc. Otherwise, Party B shall not start construction. If Party B fails to complete the above procedures within three days, Party A will cancel Party B's qualification to win the bid. 3. During the construction period, if Party B terminates the construction of the project without justifiable reasons, Party A will not settle the cost of the construction part and will deduct the performance bond. Party B is responsible for the consequences arising therefrom. 4. Party B should actively coordinate and handle conflicts.

9. Others:

10. Contents not covered by this contract shall be resolved through negotiation between the two parties.

11. This contract will take effect after being signed by the legal representatives or authorized agents of both parties and stamped with the official seal of the unit.

12. This contract is made in six copies, including two originals and four copies. Each party holds one original and two copies.

Party A (official seal): Party B (official seal):

Legal representative (signature): (or authorized agent)

Legal representative (signature) ): (or entrust an agent)

River Management Construction Contract 2

Party A: Party B:

1. Project Name

Village River Cofferdam Dredging Project

2. Project Period

Month to Year

3. Project Scope

(Based on actual Measurement shall prevail, see design drawings for details).

4. Project Cost

Through competitive bidding, the specific project quantity will be determined based on actual measurements; policy processing fees will be calculated separately.

5. Engineering Requirements

(1) The cofferdam is controlled at 300-500 meters, and a 0.5-1 meter foot protection platform is left on both sides of the embankment to prevent the embankment from Collapse;

(2). River dredging requires that all silt in the river be removed. Earthwork must be piled up in a centralized manner. It is strictly prohibited to discard it at will and prevent secondary siltation;

(3). Siltation requires the removal of garbage in the river and river bank garbage, the removal of unlicensed fishing gear such as nets and traps, the trimming of river bank slopes, and the trimming of river bank trees and weeds;

(4) River channels Greening work must be done on both sides of the strait;

(5) If the bottom of the pond is too large, such as construction waste, excavators must be used to clean it;

6. Acceptance method

(1) After the dredging of each section of the river is completed, before the water is released, each administrative village shall conduct a preliminary inspection on its own and report to the relevant town department to organize a preliminary acceptance. The water can be released only after passing the town's acceptance;

(2) After the dredging of the entire river section is completed, the county water conservancy bureau and other departments will carry out acceptance inspection, and the inspection and acceptance documents must be complete.

7. Payment method

After the completion of the project, it is accepted by the relevant units of the town and village, and after passing the acceptance by the county-level unit, the project payment will be paid in full.

8. Unfinished matters shall be resolved through negotiation between the two parties.

9. This agreement is made in duplicate and will take effect after being signed and sealed by both parties. Party A and Party B each hold one copy.

Party A (representative): Party B (representative):

Seal: Seal:

Year, month and day:

River course Treatment Construction Contract 3

Party A:

Party B:

In order to carry out the dredging work of a group of Yejiatang in Beigang Agricultural Branch, after negotiation between the two parties, Following the principles of equality, voluntariness, fairness, honesty and trustworthiness, this contract is entered into and all parties will abide by it.

1. Project name: _X Village Committee Group 1 Yejiatang dredging project.

2. Project funds: The total investment of the Ye dredging project is 75,000 yuan.

3. Project construction scope and requirements:

1. The dense silty soil at the bottom of the pond shall be excavated;

2. It is required to clean up the silt in the pond. Debris and weeds and debris around the pond, and some straightening;

3. Stonework protection around the pond (calculated based on the actual slope);

4. Engineering construction Time limit

The construction of this project started on September 5, 20_ and was completed on November 5, 20_, with a total working day of 60 days.

5. Project payment

After the project is completed and accepted, the project payment will be paid in one lump sum after the project settlement is approved.

6. If there are any unfinished matters in this contract, they will be negotiated separately.

7. This contract is made in two copies, with Party A and Party B each holding one copy. It will take effect from the date of signature.

Party A (seal):

Party B (signature):

Year, month and day

River management construction contract 4

p>

Party A: (Contractor)

Party B: (Contractor)

The rainy season is coming, and the blocked drainage points of pipe ditches should be dredged immediately to meet the needs of Park enterprises and road drainage safety requirements to avoid losses. Based on the actual situation of this project and after friendly negotiation between the two parties, Party A has contracted the dredging and dredging of the sewage pipe trenches on Zhuguan Road and Weiba Road and the replacement of damaged covers to Party B for construction. In order to clarify the responsibilities, rights and obligations of both parties, this contract is specially formulated and *** shall abide by it:

1. Project Overview:

1. Project name and quantity: Zhuguan Road (104 950 meters to the pipe ditch at Weijiu Road) and Weiba Road (920 meters from Zhuguan Road to the north wall of the sewage treatment plant) dredging and cover replacement project

2. Project location: Zhuguan Road, Weiba Road

3. Project contracting content:

Cleaning and dredging of sewage pipe trenches along the line, inspection wells and replacement of cover plates.

4. Project contracting form: lump sum contracting

2. Project duration:

The project duration is 30 days. When the construction site meets the construction conditions, Party A Notify Party B three days in advance. Party B must enter the site on the second day after receiving the notice (that is, the construction period of the project will be calculated from then on) and complete the project within the specified period and hand it over to Party A for use.

3. Total project cost and payment method:

1. The project is contracted to Party B in the form of a one-time contract for labor and materials, and the cost including tax is _______ yuan per meter

2. After the contract is signed, Party A pays Party B 30% of the project payment. After the project is completed and passes Party A’s acceptance, Party A pays the remaining 70% of the project payment to Party B within three days.

3. Party A pays for the project by bank transfer, and Party B must issue a formal invoice for the equal amount to Party A when receiving payment.

IV. Responsibilities, rights and obligations of both parties:

1. Party A shall provide Party B with necessary construction conditions and supervise and inspect the quality, safety and construction period of this project. If the requirements are stipulated, Party A has the right to require Party B to make rectifications immediately;

2. Party A shall pay Party B for the project in accordance with Article 3 of the contract;

3. Party B must comply with the design requirements Construction will be carried out in accordance with relevant standards and specifications, and the repair and maintenance of the pipeline network will be undertaken;

4. Party B will be responsible for any technical liability accidents or safety accidents during the construction process;

5. When the project meets the conditions for acceptance, Party B shall notify Party A three days in advance for acceptance.

5. Liability for breach of contract:

Disputes arising from the performance of this contract shall be resolved through negotiation between both parties.

6. Supplementary Provisions:

1. This contract will come into effect after being signed and sealed by both parties, and will serve as the basis for both parties to perform the contract and final accounts of the project.

2. This contract is made in four copies, with Party A and Party B each holding two copies.

Party A: Party B:

Legal representative: Legal representative: Company seal: Company seal: Account opening bank:

Account number:

Time: Account opening bank: Account number: Time:

River management construction contract 5

Party A: Party B:

In order to do a good job in Shantou Shalong Village III After negotiation between the two parties, Party B is now entrusted with Yinhao Pipeline Dredging to fully undertake the dredging project of the third group of drainage ditches in Shalong Village. Following the principles of equality, voluntariness, fairness and honesty and trustworthiness, Party A and Party B have reached an agreement on the contracting of the third group of large pond dredging projects in Shalong Village and entered into this contract, and both parties agree to abide by it.

1. Project name: Group 3 pond dredging project in Shimengou Village.

2. Project funds: The total investment of the third group of large pond dredging projects in Shimengou Village is: yuan.

3. Project construction scope and requirements:

1. The actual contents of the three groups of large ponds in Shimengou Village that need to be dredged shall prevail.

2. For the three groups of large ponds in Shimengou Village that are being dredged, it is required to clean up the silt and debris in the ponds and the weeds and debris around the ponds, and straighten and tidy up the parts around the ponds.

3. The average dredging depth is expected to be 1 meter and 2,700 cubic meters of silt will be discharged.

4. Other matters not covered will be agreed upon separately.

4. Project fund payment method:

Party B will invest and start construction first. After the project is completed and passed the inspection and acceptance by Party A and the water conservancy department, the project fee of RMB 40 will be paid, and the remaining balance will be The funds will be disbursed within one year.

5. Project construction period:

This project will start construction on May 7, 2020 and be completed before July 25, 2020. If the construction cannot be carried out due to weather and other natural phenomena, , the construction period is postponed, but no later than August 30, _ year.

6. Responsibilities of Party A and Party B:

1. Party A shall provide technical guidance and assistance to Party B in its construction, and Party B shall complete the construction tasks within the prescribed time limit with high quality and quantity.

2. Party A has the right to supervise Party B's construction. If Party B is found to be cutting corners, cheating, etc., it has the right to require Party B to rework until the project quality and Party A's requirements are met.

3. Party A shall pay Party B’s project payment within the specified time and shall not default on payment without reason.

4. Party B should focus on production safety and strictly prevent all possible safety accidents. If various accidents occur, Party B will bear all the responsibilities and Party A will not be held responsible.

5. Party B provides the original project invoice or tax declaration.

6. Party B completes the work within the specified construction period and submits an acceptance application to Party A. If Party A fails to pass the acceptance inspection, Party B will bear all responsibilities and losses and must make corrections within Party A's time limit until the acceptance is passed.

7. Matters not covered in this contract can be resolved through separate negotiation between the two parties, and a supplementary agreement can be signed (the supplementary agreement is valid when used simultaneously with this contract!).

8. This contract will come into effect after being signed or sealed by Party A and Party B and shall have legal effect.

9. This contract is made in triplicate, with Party A and Party B each holding one copy and keeping one copy.

Party A (seal): Shantou Shalong Village Committee Party B (seal):

Signing time: _year_month_day

River management 5 construction contracts (2022) related articles:

★ River dredging contract agreement template 2022 (5 articles)

★ Selected work report on comprehensively promoting rural revitalization in 2022

★ 2022 rural work summary for the first half of the year and five sample essays for the second half of the year

★ Five unit-level rural revitalization learning experiences

★ Personal year-end summary of administrative law enforcement

p>

★ 50 year-end summaries for 2022

★ Five patriotic health work summaries in 2022

★ Five learning experiences on rural revitalization planning

★ Five sample essays on learning experience of rural revitalization planning

★ 2022 rural revitalization work summary report (10 articles)