According to the Energy Conservation Law of People's Republic of China (PRC) and the Decision of the State Council on Strengthening Energy Conservation, in order to strengthen the energy conservation management of fixed assets investment projects, and in accordance with the requirements of the Interim Measures for Energy Conservation Assessment and Review of Fixed Assets Investment Projects (No.6 Order of the National Development and Reform Commission No.20 10), we are entrusted by your bureau, 10 XXXX10.30.
According to the nature of the project, I will organize five engineering and technical experts to form a review team, and select * * * as the team leader.
The evaluation experts listened to the introduction of the project by the construction unit and the explanation of the preparation of the energy-saving evaluation report by the preparation unit, reviewed the energy-saving evaluation report, compared the relevant information and reviewed the relevant calculation process, and formed the following evaluation opinions:
1. This project is a newly-built project with a total investment of 376,227,900 yuan. The construction address is located in area X, XXX Avenue, Dongcheng Street, XXXX. The total land area of this project is 41913.93m2, and the total construction area is132779.55m2.. Among them, the supporting construction area of commercial and public buildings is 62,096.32 ㎡; The building area of the apartment is 37,877.27m2; The basement construction area is 32,805.96 ㎡. The plot ratio of the project is 2.32, the building density is 39. 1%, and the green space ratio is 15%. After the project is completed, the main energy consumption is electricity, natural gas and fresh water. The annual electricity consumption is 7.524 million kWh, which is equivalent to 924.70 tce/a of standard coal; The annual consumption of natural gas is 105700 m? , the standard coal is128.35tce/a; The annual water consumption of the project is 152800 m? The total annual energy consumption of this project is1053.06t/year.
Two. The content of the energy-saving assessment report is basically comprehensive, and the depth basically meets the requirements of the Interim Measures for Energy-saving Assessment and Review of Fixed Assets Investment Projects (Order No.6 of the National Development and Reform Commission). The contents of the energy-saving assessment report comply with the existing relevant laws.
Regulations, industry access conditions, industrial policies and related standards.
Three. The energy-saving evaluation report analyzes the energy-saving measures in the equipment, lighting, water supply and drainage, management and other aspects involved in the project, and the evaluation opinions are reasonable.
Four. According to the energy consumption of the project, the energy-saving assessment report analyzes and compares the energy supply conditions of the project location, and the project location can ensure the energy supply of the project.
V. After accounting, what is the new energy consumption of the project in XXX? Twelfth Five-Year Plan? Incremental energy consumption? ****? . This project has a * * * impact on the completion of local energy-saving objectives and tasks.
The expert group made the following suggestions on the contents of the energy-saving assessment report: 1, 2, 3,
After comprehensive evaluation and analysis, the expert group agreed that the energy-saving evaluation report passed the review, and suggested that it be revised and reported according to the opinions of experts.
Signature of expert group leader:
XXXX Energy Conservation and Circular Economy Association
65438 +001October 30th.
Signature of evaluation expert
Article 4 of the Expert Review Opinion Model
I. Overall evaluation opinions
The main contents of this project are-
The project meets the requirements of application conditions, and the necessary supporting documents such as special projects, environmental assessment, planning and land are basically complete.
The process route adopted in this project is mature and reliable; The main raw and auxiliary materials can be solved locally or nearby; The potential market capacity of the project product is large, and it has a certain competitive advantage compared with similar products. The implementation of this project is expected to achieve better economic and social benefits.
The main contents of the project fund application report are basically in line with
The expert group believes that the content of the application report is relatively complete and passed the expert review. It is suggested that the compiling unit modify and supplement the deficiencies and problems existing in the application report.
Second, the existing shortcomings and suggestions
1\ - 。
2. The product positioning of-should be modified.
3. In the general plan and buildings and structures, it is best to explain the length, width, height and height of each floor of the building.
4. Supplementary explanation of the structural forms of main buildings (structures).
5. Supplement local wind load, snow load and seismic fortification intensity.
6. Investment estimation should supplement the summary table of investment estimation of individual projects and other engineering construction cost calculation tables, and refine the calculation of construction engineering cost, equipment purchase cost, installation engineering cost and other engineering construction cost.
7, the total investment of the project should increase liquidity.
8. It is suggested to supplement the energy consumption status, energy consumption indicators, energy-saving measures and energy-saving effect analysis of the project.
9. It should be clearly stated that the project will absorb local employment.
10 Verify the validity of the project reporting time.
panel
September 24(th), 2008
Guess you like:
1. Comments of the expert group
2. How to write the review opinions of papers?
3. Statement by the Chairman of the Review Conference
4. Recalling the statement made by the moderator.
5. Review opinions on village planning