Current location - Quotes Website - Signature design - Sporadic engineering maintenance contract
Sporadic engineering maintenance contract

Sporadic Project Maintenance Contract (1)

Party A (full name):

Party B (full name):

In accordance with the "People's Republic of China "Contract Law of the People's Republic of China", "Construction Law of the People's Republic of China" and their relevant laws and administrative regulations, following the principles of equality, voluntariness, fairness and good faith, both parties reached consensus on the construction matters of this construction project. Enter into this contract.

1. Project Overview

Project Name:

Project Content:

Project Contracting Content: The above-mentioned project content shall be contracted and contracted. Materials and safety are guaranteed, and all expenses are guaranteed.

2. Total project contracting amount: RMB yuan (yuan)

3. Contract duration

Start date: year, month, day, completion date: year, month Daily contract duration: days

4. Quality standards

Project quality standards: The quality level is "qualified" project.

5. Safety

Strictly implement construction specifications, safe operating procedures, fire safety regulations, and environmental protection regulations. Safety accidents are strictly prohibited. Party B must take safety precautions during construction. Party B shall be responsible for all economic and legal liabilities caused by work-related injuries.

6. This contract is made in two copies, with Party A and Party B each holding one copy, and it will take effect from the date of signature.

Party A: (Seal) Party B: (Signature)

Year, month and day: Sporadic Project Maintenance Contract (2)

Party A: (hereinafter referred to as Party A)

Party B (hereinafter referred to as Party B):

This is because Party A needs to carry out daily sporadic maintenance work. Party B is required to be responsible for sporadic maintenance work. This sporadic maintenance project is a labor and material contract, and all materials are provided by Party B. The following agreement has been made through negotiation between the two parties:

1. Project content: Project requirements:

1. When repairs are carried out during working hours, the normal school order must not be affected, and at the same time, it must be done effectively Take safety precautions and do not affect other facilities during construction. If there is any damage, Party B will be responsible for compensation and repairs;

2. When working, you must construct in accordance with relevant specifications, abide by laws and regulations, and comply with Party A's relevant rules and regulations. ;

3. Party B must strictly take corresponding technical measures during the construction process;

4. Party B must be conscientious and responsible during the construction process and must not endanger the original facilities. If there is any damage, , all responsibilities shall be borne by Party B and responsible for repairs, and Party A reserves the right to further pursue legal liability against Party B;

5. When performing high-altitude operations, Party B shall independently take safety precautions and do its own Personal safety and all safety responsibilities shall be borne by Party B, and Party A shall not be held responsible.

2. Project cost: The actual settlement cost is (lowercase: yuan) (see the acceptance list for specific costs).

3. Payment method: Payment shall be made within one month after the project is accepted and accepted.

4. Shelf life: One year from the date of completion acceptance. (This maintenance project has been completed on the day of the year and has passed the acceptance inspection.)

5. Party B must take safety precautions for on-site construction in accordance with relevant national and local norms and regulations, and strictly abide by the safety operating procedures. Party B is responsible for any accidents that occur during the construction period, and Party A does not bear any responsibility. All construction tools shall be taken care of by Party B.

6. This contract is made in two copies, with each party holding one copy. It will take effect after being signed and sealed by both parties.

Party A: (Signature) Party B:

Representative of Party A: ID number: Account number:

Year, month and day: Sporadic project maintenance contract (three )

Party A:

Party B:

After negotiation, both parties have reached the following agreement on sporadic project maintenance and construction matters:

1 , Project Overview

1. Contract scope: various sporadic projects designated by Party A.

2. Contracting method: contracting work and materials

2. Obligations of both parties

(1) Party A

1. Do a good job in construction Preparatory work must be carried out to ensure that Party B can enter the construction site on time.

2. Ensure Party B’s construction water, electricity and other conditions.

3. Assist Party B to maintain order on site and handle various problems in a timely manner.

4. During the construction process, if there are any changes to the construction, Party B shall be notified at a reasonable time in advance to make corresponding preparations, and shall be responsible for checking and supervising the progress and quality of the work at any time.

(2) Party B

1. Party A should be notified before starting construction so that Party A can send personnel for supervision.

2. Party B must clean up and dispose of the garbage generated during the construction in a timely manner to ensure that the construction site is tidy and clean.

3. The person in charge of Party B must ensure the safety of construction workers such as fire prevention, theft prevention, and accident prevention. If relevant damage occurs, Party B shall be solely responsible.

3. Project acceptance

After the construction is completed, Party A will conduct quality acceptance, and Party B shall cooperate.

4. Project price and settlement method

1. Total project quantity: calculated based on actual project quantity.

2. Project pricing: The project list shall prevail.

5. Warranty

When quality problems occur, Party B shall perform maintenance obligations promptly, effectively and fully.

6. Matters not covered in this contract shall be resolved through negotiation between Party A and Party B.

7. This agreement is made in two copies. Party A and Party B each hold one copy. It will take effect after being signed and sealed by Party A and Party B.

Party A: (seal) Party B: (seal)

Client: Client:

Year, month, day, year, month, day sporadic project maintenance contract (4)

Party A:

Party B:

In accordance with the "Economic Contract Law of the People's Republic of China" and the Ministry of Construction, Provincial and Municipal Construction Committees Regarding the relevant provisions of the decoration project, the contract signed by both parties after negotiation is as follows:

1. Project

1. Project name:

2. Project location:

3. Project contracting method: labor and materials

2. Project decoration content

3. Project cost

The project cost is based on A Based on the party's usage requirements and design requirements;

The project cost is: RMB yuan.

4. Project Period

Project Start Date:

Project Completion Date: Year, Month, Day

5. Quality Requirements

According to the national Ministry of Construction industry standard JGJ73-91 "Construction Acceptance Specifications for Building Decoration Projects" and the standards stipulated by the provincial and municipal construction committees and fire departments, the project quality reaches the municipal level. If quality problems occur after the completion of the project (except for quality problems caused by human factors when used by Party A after completion), which are the responsibility of Party B, Party B will provide free warranty with a one-year warranty period and lifelong maintenance.

6. Payment method

1. After the contract is signed.

2. When the project is halfway through, Party A will pay Party B the total project cost.

3. After the project is completed and accepted, Party A will pay Party B all the project money.

7. Responsibilities of both parties

1. Party A: Responsible for providing the use and design requirements of the entire project; providing the location of water and electricity for on-site use; providing material transportation channels and necessary materials The design drawings of the storage site and the original building; the location of the power distribution system, pipeline system, and water supply and drainage main valves involved in the decoration project should be specified; the construction site must be level.

2. Party B: Provide Party A with engineering decoration construction design drawings and project quotations.

8. Other Matters

The following agreement has been reached by Party A and Party B:

1. If the project cannot be constructed due to special circumstances or force majeure, the construction period may be extended. Postponed; in the event of a breach of contract, all losses caused by the breach of contract shall be borne by the breaching party.

2. When there are changes in the materials and processes of projects or projects other than those quoted in this project, Party A needs to determine the comprehensive unit price and sign it in the form of an "on-site visa" signed by the on-site person in charge of Party A. And included in the completion settlement addition. (If work beyond the quotation of this project has already occurred or the materials and processes of the project have changed, and Party A has approved it, but Party A does not have a visa, the expenses incurred are also valid.)

 3. If Party A or Party B breaches the contract and fails to perform in accordance with the contract, they may appeal to the superior authority or arbitration institution.

4. Other matters not covered shall be resolved through negotiation between the two parties.

5. The contract is made in two copies, signed by both parties and effective, each holding one copy, and has the same legal effect.

Party A (seal): ____________________ Party B: _________________________

Representative (signature): ______________ ID number: ____________________

_______year________ Month_______day_________year_______month_______day