1. Fill in the "Commencement Report" review comments: the construction preparation is completed, and the commencement is agreed.
2. Fill in the "List of Main Managers of Engineering Project Construction Enterprises" review comments: agree to the qualification review.
3. Fill in the "Approval Form for Construction Organization Design (Construction Scheme)" according to the review opinions of the supervision unit: after review, the construction organization design meets the requirements of relevant codes, standards, drawings and contracts, and it is agreed to implement it according to this construction organization design.
4. Fill in the "Construction Technical Disclosure Record" and the inspection conclusion of the supervision unit: it meets the requirements.
5. Fill in the "Application Approval Form for New Materials, New Processes, New Technologies and New Equipment" and review comments: Agree.
6. Fill in the acceptance conclusion of the supervision unit in the "Acceptance Record of Concealed Works": agree to conceal and proceed to the next process.
7. Fill in the "Engineering Inspection Sheet" and the supervision unit's opinion: it meets the design requirements and specifications and is qualified after acceptance.
8. Fill in the supervision unit's opinion of "Inspection Sheet for Project Completion Acceptance": After pre-acceptance, the project conforms to the current laws, regulations, design documents, relevant quality acceptance specifications, standards and construction contract requirements in China. The pre-acceptance of this project is qualified.
9. Fill in the "Unpacking Inspection Record of Main Equipment" and verify the conclusion: agree with the inspection result of the construction unit.
10. Fill in the conclusion that "sub-projects and sub-projects (sub-projects) pass the counter-sign form of the acceptance party": all sub-projects meet the requirements of the construction quality acceptance specification; Quality control materials and safety and functional inspection (test) reports are complete and qualified; Good visual quality.
1 1. Fill in the "evaluation of project quality by all parties involved in the completion acceptance of the unit (sub-unit) project" conclusion: the unit project has passed the completion acceptance.
12. Fill in the verification conclusion of "Inspection Record of Engineering Perception Quality": agree and accept the inspection results of the construction unit.
13. Fill in the verification conclusion of "Inspection Record of Construction Site Quality Management": After verification, the above items meet the requirements.
14. Fill in the column of acceptance conclusion "×××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××××
15. Fill in the acceptance opinion in the subsection project name column of the "subsection project quality acceptance record": the subsection project is qualified; Fill in the quality control information column and fill in the acceptance comments: the quality control information of each sub-division is complete; Fill in the safety and function inspection report column: agree with the evaluation of the construction unit; Fill in the visual quality acceptance column: agree with the evaluation by the construction unit; Fill in the column of supervision unit: all sub-projects meet the requirements of specifications, quality control materials and safety and function inspection (testing) reports are complete and qualified, and the visual quality is good. Agree and accept the evaluation results of the construction unit.
16. The acceptance conclusion of "Completion Acceptance Record of Project Quality of Unit (Sub-unit)" should be filled in the column of divisional works: after the divisional works of various disciplines are accepted, the project quality reaches the acceptance standard; Fill in the quality control data column: the quality control data items meet the requirements of relevant specifications after inspection; Fill in the column of safety and main use functions and spot check results: X safety and main use functions meet the requirements, and X use items meet the requirements by spot check; Fill in the column of visual quality acceptance: visual quality acceptance is good; Fill in the comprehensive acceptance column: after the comprehensive acceptance of this project, all sub-projects meet the design requirements, the construction quality meets the requirements of relevant quality acceptance specifications and standards, and the unit project is qualified for completion acceptance.
17. Fill in the conclusion column of "Verification record of project quality control data of the unit (sub-unit)": Through the verification of project quality control data, the project data is complete and effective, and all construction tests and system debugging records conform to relevant specifications, and the completion acceptance is agreed.
18. Fill in the random inspection record of "data inspection and scheme random inspection of unit (sub-unit) engineering safety and function", and the result is qualified; Fill in the conclusion column: the safety and functional data inspection of this project basically meets the requirements, and the main functions of the unit project are sampled. The inspection results are qualified and meet the use function, and the completion acceptance is agreed.
19, the quality evaluation column of "Inspection Record of Perception Quality of Unit (Sub-unit) Project" should be ticked in the box of "Good" or "General"; The comprehensive evaluation of visual quality is good; Conclusion The comprehensive evaluation of visual quality of filling engineering is good and qualified.
Second, the engineering quality control data sheet
1. Fill in the "Steel Structure ×× Engineering Quality Control Data Checklist" inspection conclusion: the engineering data are complete and effective, and various construction tests and records meet the requirements of the specification.
2. Fill in the "Summary of Inspection and Acceptance Records of Raw Materials, Steel Components and Accessories" with the conclusion of supervision and verification: qualified; Fill in the inspection conclusion of the supervision unit: the records are complete and meet the requirements.
3. Fill in the "original inspection and acceptance record of this material, steel members and accessories" and the acceptance result is qualified; Fill in the verification conclusion of the supervision unit: it meets the design requirements and the provisions of Code for Acceptance of Construction Quality of Steel Structure Engineering (GB50205).
4. Fill in the "Summary of Certificates of Raw Materials, Steel Components and Accessories". Inspection conclusion: ×× Certificate is complete and qualified.
5. "Summary of inspection report, reinspection and reinspection report" shall fill in the inspection conclusion of the supervision company: the quality inspection report of the inspection summary is complete and the reinspection result is qualified.
6. Fill in the Inspection Record of Safety and Function Inspection and Witness Test Items of Steel Structure Division (Sub-division) with the inspection conclusion of the supervision company: the safety and function inspection and witness test items are complete.
7. Fill in the inspection conclusion of "Baking Record of Welding Materials (covered electrode, Welding Wire and Flux)": It meets the requirements.
8. Inspection conclusion of "Records of Other Parts before (after) heat treatment" filled in by the supervision unit: it meets the requirements.
Three, building and structural engineering safety and function inspection or spot check records.
1. Fill in the "Roof Water Storage Test Record". Supervision conclusion: It meets the design and specification requirements.
2. Fill in the "basement waterproof effect inspection record" supervision conclusion: it meets the design and specification requirements.
3. Fill in the "Water-splashing Test Records of Toilets, Kitchen, Balcony and Other Floors with Waterproofing Requirements". The supervision conclusion is that it meets the design and specification requirements.
4. Fill in the "Inspection Record of Suction (Air) Duct" conclusion: It meets the design and specification requirements.
5. Fill in the test report conclusion in the "Summary Table of Air-tightness, Water-tightness and Wind Pressure Resistance Test Report of Curtain Wall and External Window": the test result is qualified.
6. Fill in the settlement observation record from commencement to completion. Conclusion: It meets the requirements.
7. Fill in the test report conclusion in the Summary of Indoor Environment Test Report of Civil Building Engineering: the indoor environment quality of the project is qualified.
Four, subdivisional work inspection batch quality acceptance record
1. The quality acceptance record of the inspection lot of subdivisional work is in conformity: if it is qualified, fill in the acceptance comments column of the supervision company; Fill in the acceptance conclusion of the supervision company: it meets the design and specification requirements after inspection, and it is qualified after acceptance.
2. When the quality acceptance record of the inspection lot of subdivisional work meets the design and specification requirements after inspection, fill in the acceptance record column of the supervision unit; Fill in the acceptance conclusion column of the supervision unit: agree with the evaluation result of the construction unit and pass the acceptance.
Basic requirements of verb (abbreviation of verb) compliance review
1, where the project table should be unified using provincial table or municipal table, shall not be mixed; When the provincial and municipal tables are not enough, the self-made tables should be reported to the provincial and municipal stations for the record.
2. The full name of the project should be filled in the project name column in the header, which is consistent with the project name in the contract or bidding documents.
3. Project name: the full name of each responsible unit should be written, which is the same as the unit name on the contract signature. The column of person in charge of the project should be filled in: the signatory on the contract or the representative entrusted by the signatory in writing is consistent.
4. Check whether all kinds of materials, data and acceptance signatures are true, complete and standardized.
5. When there is no item content in the table, slash it; Qualitative items should be checked when they meet the specification requirements, and crossed when they do not.
6. The engineering data shall be printed on A4 format paper, and the signature column shall not be printed, which shall be signed by all signatories respectively, and shall not be replaced by librarians. The signature must be legible.
7, engineering data writing signature should be written in durable carbon ink, blue and black ink, shall not use easy to fade red, pure blue ink, ballpoint pen, pencil, etc. 2/3 Home Page Previous Page 123 Next Page Last Page
8, all unqualified data supervision personnel should be returned in time, requiring the inspected unit to rectify within a time limit.
9, adhere to the principle of engineering data and the progress of synchronization.
10. Matters not covered in this contract shall be implemented according to the existing relevant regulations promulgated by the construction administrative department or authorized unit. The master control project and general project have passed the acceptance. The strength of concrete and mortar specimens will be judged after the test report comes out, and the rest items have all passed the acceptance. Indicate "Agree to acceptance and proceed to the next process" or "Accepted". Signature of professional technical director of professional supervision engineer construction unit. Three points should be paid attention to in the acceptance of sub-projects: first, check whether the inspection lot covers the whole project; Second, check whether the strength requirements of concrete and mortar of the inspection lot after the same period can meet the specification requirements; The third is to unify the inspection lot data and register them in turn for easy management. The professional supervision engineer of the supervision unit (the professional person in charge of the construction unit) shall review one by one, fill in "qualified or in line with the requirements" for the agreed projects, and the projects that are not filled in for the time being will be accepted after treatment, but they should be marked well. Opinions indicating acceptance and rejection. If you agree to the acceptance and sign for confirmation, if you don't agree to the acceptance, please point out the existing problems and clarify the treatment opinions and completion time.