The completion stamp shall be signed and confirmed by the construction unit, the preparation personnel and the technical director, and shall be audited by the supervision unit and signed and approved by the chief supervision engineer.
The basic requirements are as follows:
Technical person in charge: chief engineer of the project; Technical person in charge of the company; Project technical director; Minister of Engineering Department and Chief Engineer (Deputy Chief Engineer).
Staffing personnel: the specific personnel, who will prepare it, can be the company information officer or the engineering and technical personnel; Professional engineer of the company; Project quality controller; A builder.
Auditor: technical director; Technical supervisor; Professional engineer; Project manager; Chief engineer of the company
Project completion drawing measurement:
Purpose and task:
(1) In a new or expanded project, in order to check the correctness of the design and clarify the final results of the project completion, as the technical data after completion, it is necessary to submit the as-built drawings.
(2) When the old project is expanded or rebuilt, it is necessary to obtain the plane and elevation positions of the actual buildings (structures) in the original project, so as to provide a basis for the design.
(3) In order to meet the needs of production management and deformation observation after the new project is completed and put into operation, the project completion drawing must also be provided.
The characteristics of project completion drawing: the measurement accuracy of completion drawing is calculated on the basis of analytical data, so the accuracy is determined by the measurement error of detail coordinate points; The mapping content is complex; Take different technical measures according to different uses.
Extended data:
Relevant regulations:
1. The contents of the completion stamp shall include the words "as-built drawing", the construction unit, the preparer, the auditor, the technical director, the preparation date, the supervision unit, the site supervisor and the chief supervisor.
2. Size of completion stamp: 50mm× 80mm
3. The completion stamp shall be made of indelible red inkpad and covered in the blank space above the icon bar.
4. As-built drawings drawn with construction drawings must indicate the basis for changes and modifications; When the construction drawing has major changes in structure, technology and layout, or the changed part exceeds 1/3 of the drawing, the as-built drawing shall be redrawn.
5. Compiler: Cartographer; Checker: Project Manager; Technical person in charge: technical person in charge of the project; Compilation date: drawing date.
Use:
When using the construction drawing to draw the as-built drawing, the modification basis must be marked; When the construction drawing has major changes in structure, technology and layout, or the changed part exceeds 1/3 of the drawing, the as-built drawing shall be redrawn and stamped with the as-built stamp before it is qualified.
Baidu Encyclopedia: Completed Seal