Technical measures for spring inspection of electric power
(a) before construction, the construction unit must be familiar with the scope and content of work in advance. And to the scene to explore the working environment and equipment, according to the scene, clear the work tasks undertaken by this unit, and formulate three major measures for team work.

(2) Strengthen defect management. Find and eliminate important defects of equipment in time, so as to keep the health of equipment at the first-class level. The owner of equipment operation and maintenance shall be responsible for equipment defects and implement a closed-loop defect management system. The operation department should strengthen the inspection and monitoring of the equipment and report the defects to the competent leader, biotechnology department and maintenance department in time. The maintenance department shall ensure the integrity of tools and spare parts needed for emergency maintenance. For the main equipment defects found in the inspection, it is necessary to work out a feasible treatment plan and incorporate it into the monthly production plan in advance. Equipment maintenance should pay attention to process quality requirements, eliminate defects, ensure a thorough treatment, and prevent repeated power outages. Take various measures to comprehensively manage the equipment. All units should comprehensively manage the power transmission and transformation equipment in combination with the spring inspection work to ensure that the equipment meets the requirements of "five noes" after power failure and improve the health level of the equipment.

(3) Strictly implement the maintenance procedures. Implement the whole process management of maintenance work and strictly implement the process standards; Seriously implement the maintenance work standards and process management system; Strict construction procedures and quality acceptance procedures during construction; Strict whole-process management of all overhaul and technical transformation work; After the maintenance is completed, the three-level acceptance shall be carried out in strict accordance with the equipment acceptance standards, and the acceptance signing procedures shall be performed seriously. After the equipment maintenance and acceptance is put into operation, if the inspection fails to reach the first-class standard, the inspection personnel shall be assessed.

(4) Strengthen technical supervision. In the spring inspection, we should make full use of the existing technical supervision and monitoring means to test the equipment. It is necessary to make full use of infrared measurement, chromatographic analysis and other detection methods, strengthen the monitoring of defective equipment, find out the location and nature of equipment defects, and improve the pertinence of equipment power outage maintenance. Regular testing, testing and calibration of the equipment must be completed to ensure the safe operation of the equipment.

(five) strict implementation of scheduling, on-site operation procedures. Dispatching and substation operators should make technical preparations in advance for the special operation mode caused by equipment maintenance, and it is strictly forbidden to send electricity backwards to the maintenance substation; For the weak points of the power grid, remind the operation and maintenance department to strengthen inspections at least one day in advance, and take corresponding preventive measures for existing problems to prevent equipment accidents.

(six) to further strengthen the management of basic data. Every year, the engineering technical management data should be perfectly sorted according to the first-class standards, and all kinds of operation records, maintenance records, wall charts and drawings should be standardized. When the equipment is changed, the equipment change procedures shall be performed, so that the equipment, accounting and drawings are consistent and accurate, and the basic data are unified.

(7) When working indoors in 35 kV switchgear, 10 kV switchgear and 10 kV capacitor, when there are both operating equipment and construction equipment, practical and reliable measures must be taken, and a special person should be appointed for supervision to prevent people from accidentally touching the operating equipment.