Current location - Quotes Website - Team slogan - Has Longquan Metro s 13 passed the examination and approval?
Has Longquan Metro s 13 passed the examination and approval?
Longquan subway s 13 has been approved.

According to the work report of Chengdu Municipal Government, we strive to start construction of Longquan-Tianfu Airport Line (S 13 Line) this year, and it has been determined to start construction in 2023.

Longquan-Tianfu Airport Line is a regional (suburban) rail transit line, which is included in the multi-level rail transit planning of the Shuangcheng Economic Circle in Chengdu-Chongqing area.

According to the "14th Five-Year Plan" of Chengdu, the line leads from Long 'an Station of Metro 13, and passes through Longquanyi, Jianzhou New Town and Airport New Town to Tianfu International Airport. The total length of the line is about 5 1km, with * * stations 12, and the construction period is 5 years.

This line will be the third rail transit line to Chengdu Tianfu International Airport, and the other two lines are 18 line and 19 line phase II.

Chengdu rail transit line S 13 lines and stations;

The whole line is set up with 12 station S 13, starting from Qing taishan station and ending at T3T4 terminal of Tianfu International Airport, with a total length of 50.8km Among them, there are 3 stations in Longquan section, 3 stations in Jianzhou New Town section, 2 stations in Jianyang section and 4 stations in Airport New Town section (9 stations in Quanjianyang section and 7 stations in East New District section).

1, 3 stops in Longquan section: Qingtaishan, Tangjiafang and Dongshan International Station.

2. Three stops of Jianzhou New Town: Huanshan Avenue, geely university and Jianzhou high-speed railway station.

3. Jianyang Section 2 stops: Sining Street and Niuwang Street Station.

4. Airport New Town Station 4: Maojiakou, Airport North, T 1T2, T3T4.