Current location - Quotes Website - Team slogan - What is the acceptance standard for decoration?
What is the acceptance standard for decoration?
After the house is taken over, the decoration company has nothing to do with the new house. Therefore, it is very important to understand the acceptance criteria of home decoration. It is necessary to find the problems left over from the decoration in time and discuss with the decoration company to avoid losses.

After the renovation is completed, it will enter the acceptance stage. Whether the decoration project is qualified or not, you can check the decoration quality at the acceptance stage. After the acceptance, the decoration company has nothing to do with the new house. Here are eight home decoration acceptance criteria for you, hoping to provide suggestions in place in this important link.

Acceptance standard for home decoration 1: pipes and fittings meet the current quality standards. Valves should be installed correctly, switches should be flexible, and all pipes, valves and joints should be free of water seepage and leakage after water pressure test.

Home improvement acceptance standard 2: how to accept electrical engineering depends on good electrical testing, lamp testing and lamp control performance; The HES, sockets and junction boxes of switches and other equipment are in good appearance, and the insulation devices are free from cracks. Solid, straight, installation method in accordance with the provisions; The installation deviation of switch and socket junction box side by side, and the gap between blank switch, socket and junction box panel and box edge meets the requirements; Weak current system C. It is fully functional and meets the use requirements, and the equipment has been installed. Firm and upright.

Acceptance criteria for home improvement: mortar works can be accepted after drying; Wallpaper and wall covering must be firmly bonded, with the same surface color, without bubbles, hollows, cracks and wrinkles. And there is no stain when squinting; Smooth surface, no ripple, wallpaper, wall cloth, mirror lines, corner lines, decorative panels, skirts, beads, curtain hanging frames, on the side of 1.5m, no obvious gaps are found by visual inspection; The splicing hall shall be horizontal and vertical, with consistent splicing patterns, and shall not be separated or overlapped; Yin and Yang angles should be vertical and angular, and the Yin angles should be spliced smoothly. Light, and the joints of the external corners should be seamless. The edges of wallpaper and wall cloth shall be straight and tidy, and there shall be no paper wool or flying thorns, and there shall be no leakage, subsidy or layering.

Home improvement acceptance standard 4: it is acceptable to finish the floral decoration project; Flower decoration engineering should check whether the varieties, specifications and flower decoration patterns meet the design requirements; The ornamental design should be installed firmly, and its quality requirements and allowable deviation should meet the following requirements: the horizontal and vertical allowable deviation of strip ornamental design should not exceed 3 mm in total length; The allowable deviation of a single flower decoration position shall not exceed 65438±00mm;; The decorative surface of the flower should be SM. Flowers should be smooth, patterns should be clear, seams should be important, and there should be no defects such as cracks, warping, missing corners and falling corners.

Acceptance standard 5 for home decoration: The types, specifications, colors, basic structure and fixing methods of materials used for ceiling construction shall comply with the relevant provisions of this design. Cover plate and keel should be closely connected, and the surface should be smooth, free from pollution, cracking, corner missing and hammer injury. Defects and joints should be uniform, the fixed cover plate should not be layered, and plywood should not have shavings; The engine hood shall be free from leakage, penetration and warping.

After the home decoration is completed, the owner will be in high spirits because of the brand-new house, but at this moment, we must keep a clear head and successfully complete the handover with the decoration company according to the above standards, otherwise we will regret it.