Current location - Quotes Website - Team slogan - What are the compilation requirements for bidding construction organization design?
What are the compilation requirements for bidding construction organization design?
What are the compilation requirements for bidding construction organization design? The following Zhong Da consults the bidding teacher to answer your questions for your reference.

1. Legality

"Bidding construction organization design" is a legally binding "commitment letter" issued by the tendering unit to the tendering unit. Therefore, the bidder is required to build official seal and sign by the legal representative, and submit it to the bidding unit or agency in a sealed manner.

2. Technical

"Bidding Construction Organization Design" is a technical document that is discussed, compiled and reviewed by various professional engineers of the bidding enterprise and finally approved by the chief engineer. Therefore, it should be signed by the preparer, reviewer and approver. Otherwise, it can only prove that the enterprise is out of control in construction technology.

Targeted

Each project has its own functional characteristics, structural types, geological conditions and environmental and social factors. Construction organization design should grasp its characteristics, pay attention to description, and deal with future construction with foresight. Where there are difficulties, there is no guarantee. We should put forward our own solutions to specific problems, which can reflect the level of enterprises.

Step 4 be consistent

The tender documents put forward some specific requirements for the construction unit to bid. We should read the tender documents carefully and give the other party a satisfactory answer. Never leave the tender documents.

5. dynamic

"Bidding construction organization design" is a process of continuous revision and improvement according to actual changes in the implementation process. Therefore, in the bidding stage, the construction organization design generally only puts forward an overall strategy. It will be further refined after winning the bid. Don't rush to solve all the problems in the future at once, it's also impossible.

Step 6 connect

Since "bidding construction organization design" is the mutual cooperation of various professions, it is necessary to handle the procedures and relations between various professions. For example, the installation and removal of formwork, in the scheme design, not only the installation but also how to remove it should be considered.

7. Machinability

Construction organization design is a process in which enterprise technicians process materials from all sides through their own mental work, rather than copying them according to textbooks and norms. Empty slogans and promises should be used as little as possible, and the key is to put forward measures to ensure them. Clarify what standards and norms, and how to approach, reach or even exceed this standard.

8. Avoid copying.

Some bidders will not make a draft or save trouble, but will copy several construction organization designs of other projects to bid. The result of plagiarism or plagiarism can only be contradictions and jokes, and the bid evaluation personnel will see through them at a glance, so bidding is better than not voting.

9. be serious

The text should be concise, the chart should be neat, the content should be complete, and the binding should be exquisite. Show that the bidder respects the tenderer.

For more information about project/service/procurement bidding, and to improve the winning rate, please click on the bottom of official website Customer Service for free consultation:/#/? source=bdzd