Chapter I: General Provisions
Article 1 These Measures are formulated to implement the policy of "safety first, prevention first", completely eliminate the phenomenon of "illegal command, illegal operation and violation of labor discipline" and ensure the realization of the overall goal of safe production this year.
Article 2: Main objectives of safe production
1, no major accidents;
2, no rural power workers (including temporary workers) seriously injured production accidents;
3. There are no personal electric shock casualties in rural areas;
4, put an end to power transmission and transformation accidents;
5. Power distribution accidents (pole inversion, broken distribution transformer burning, failure to restore power transmission within 24 hours of export failure) do not meet the indicators issued by the supermarket bureau;
6, no fire accidents, traffic accidents and boiler pressure explosion accidents;
Article 3: Division of accident liability
1, accident responsibility, accident unit leaders and relevant personnel;
2, the occurrence of major safety accidents, rural power workers seriously injured production accidents and rural electric shock casualties, shall be investigated for the responsibility of the party, government, industry leaders and safety production committee;
3, power transmission, substation and 10KV line equipment accidents, biotechnology section chief overall responsibility, in charge of the director has a certain responsibility;
4, low-voltage power grid accident, copy class monitor, power supply, in charge of the person in charge of a certain responsibility;
5. If accidents are caused to users of industrial enterprises due to poor management, the director of power supply station, the director of marketing department and relevant personnel shall be held responsible, and the director in charge shall bear certain responsibilities;
6, unit safety personnel work does not reach the designated position accident, shall be investigated for the responsibility of safety personnel;
7. Accidents caused by man-made illegal operation:
(1) If strict training and assessment are not carried out as required, the responsible director and relevant departments shall be investigated for responsibility;
(2) Without pre-job safety technical training, the personnel will be assigned to the post of rural power production or changed, and whoever arranges will be responsible, and whoever receives will be responsible;
(3) Electricians working on the equipment in the system network of Harqin County Rural Power Bureau did not participate in the annual "Safety Regulation" assessment of the safety supervision department, and the responsibility of the department head, safety supervision personnel and in charge of the director was investigated;
8, unit fire accidents and theft accidents, shall be investigated for the responsibility of security personnel and competent leadership;
9, the responsibility of traffic accidents, shall be investigated for the responsibility of the driver, the person in charge of the unit and the competent leadership;
10. In case of a general assessment accident, the safety record shall be terminated, and the responsible person shall be held accountable, as well as the competent department and competent leader;
Article 4: Division of responsibilities within the jurisdiction of electrical equipment
1 and 66KV transmission lines are routed by Daxing Company;
2, substation equipment biotechnology department is responsible for;
3. 10KV distribution line, 0.4/0.2KV low-voltage line and distribution transformer are managed by each power supply station;
Chapter II: Penalties for violations of discipline and discipline.
Article 5: Division of responsibilities for violation of regulations.
1, those who violate the rules and regulations must be held accountable;
2. Investigate the responsibility of the unit according to its severity;
3. Safety supervisors are not in place, lax and meticulous, and they are not serious about handling violations of rules and regulations, and they should be held accountable;
Article 6 The person in charge of a unit that can't effectively control the illegal behavior shall be demoted.
Article 7: Anyone who commits any of the following violations shall be given administrative sanctions, and the person in charge of the unit and relevant personnel shall be given economic punishment by 300 yuan, and the annual safety award of the unit shall be deducted.
Welcome to visit, welcome to visit,
1, illegal command;
2, with ground wire closing;
3. On-load broach brake;
4. Open the switch by mistake;
5. Mischarging interval;
6, live grounding wire;
7. Incorrect boarding of live equipment;
8. Make an appointment to stop sending electricity;
9, command error, command error;
10, working on electrical equipment and lines does not perform work permit procedures;
1 1, power outage operation, a line is under construction in many places and there are live lines nearby, the line names and pole numbers of all operating points have not been carefully checked in advance, the person in charge of the work has not been arranged, and the construction starts if the safety measures are not complete;
Article 8: Anyone who commits one of the following habitual violations shall be given financial punishment by 200 yuan, the violator and related personnel.
1, hearing the power failure of the superior line or system, working without a working ticket;
2. Use steel tape measure and metal ruler to measure or draw live equipment;
3. Before all personnel leave the work site, dismantle the grounding wire in advance;
4, no working ticket to open the branch switch power operation;
5, without the permission of the working ticket, the staff will enter the construction site pole or do other preparatory work;
6, before boarding, don't check the line name and pole number, blindly boarding;
7. The person in charge of the work has gone through the formalities of ending the work, but the members of the working class have not completely evacuated from the work site or are still working;
8. Without asking, the equipment that does not meet the specified requirements or has serious defects is put into operation;
9, electricity inspection is not serious, blind operation without electricity and induced electricity are not carefully analyzed;
10, without the permission of the dispatcher, the attendant resumed power transmission without authorization;
1 1, expanding the working scope of the working ticket without authorization;
12. After the working ticket is completed, the working ticket issuer will issue it without reviewing the work tasks and safety measures in detail;
13, the person in charge of the work, the work guardian and the safety supervisor acquiesce or fail to stop the illegal operation and unsafe behavior on site;
14, driving without a license or use the car at will-driving, drunk driving;
Article 9: In case of any of the following habitual violations, the relevant personnel shall be given economic punishment 150 yuan/time.
1, drinking or doing homework after drinking during work;
2, aerial work does not use seat belts;
3, aerial work does not use transfer rope, throwing items or tools at will;
4, the job site does not strictly implement the safety measures listed in the working ticket, such as only the grounding wire should be hung for corresponding short circuit, and there is no grounding wire and electroscope;
5, the work has been licensed, but the person in charge of the work did not carry the working ticket and commanded at the scene;
6, in the same pole set up lines, parallel live lines, should be designated persons monitoring without setting;
7, aerial work, cutting down trees should be monitored by designated personnel without setting;
8, work every other day to return to work, do not check whether the safety measures are in good condition;
9. There is no unified password or unified command for large-scale operations such as vertical pole, tight line and pay-off;
10, after the completion of pole erection, before the backfill soil is compacted in layers, dismantle the vertical pole equipment and temporary stay wires, and erect the pole;
1 1, people withdraw from the pole by suddenly cutting the wire;
12, crossing the live line, and no safety measures are taken for the pay-off and tight line;
13, the indication of analog board is inconsistent with the wiring mode of field operation;
14, do not carefully simulate the operation before operation, and do not carefully check the equipment name and number;
15, the operator made a hasty handover and the connection was unclear. Transferring or even changing shifts without the consent of the director or leader;
16, the automatic relay protection device is out of operation without permission;
17, the personnel on duty in dispatching and substation are empty and absent without leave; Welcome to visit, welcome to visit,
18 when all the maintenance work is over, the personnel on duty will remove the safety measures and resume power transmission without inspection and acceptance;
19. All maintenance is completed, the site is not counted, and tools and articles are left on the equipment;
20, equipment cleaning, brake operation should be monitored by designated personnel without setting;
2 1. Conduct electrical maintenance test without supervision;
22. There are no fences, signs and unattended at the high-voltage test site;
Article 10: In case of any of the following habitual violations, the party concerned and relevant personnel shall be given economic punishment 100 yuan/time.
1, do not fill in the working ticket before operation, and fill in the working ticket after operation;
2. The person in charge of the work left the scene and did not temporarily appoint a capable comrade to undertake the work, or although the person in charge of the work was appointed, all the members of the working class were not informed;
3. The work task can't be completed according to the working ticket schedule, and the person in charge of the work can't handle the work ticket extension permit formalities in time;
4. The person in charge of the work is allowed to take part in the work without explaining the safety precautions and safety measures to the members of the temporary working class;
5. Temporary stay wires under construction are not installed;
6, not according to the requirements of the "Regulations" installation of grounding wire;
7, working controller does not hand over to treat site safety measures to working class members;
8, equipment inspection is not serious, important defects are not found in time, not registered after discovery, no record after eliminating defects;
9. Don't wear insulating gloves, close the circuit breaker with insulating rod or close the circuit breaker with transmission mechanism;
10, don't wear insulating gloves when disassembling the grounding wire; Rules and regulations of safety rewards and punishments for county-level electric power enterprises
1 1. Do not wear insulating boots when operating outdoor high-voltage equipment in rainy days;
12. Dismantle the grounding wire without using an insulating rod;
13, high-voltage electricity inspection without insulating gloves;
14. Non-working personnel enter the switching site, high-voltage room and control room of the substation, and the personnel on duty do not stop them;
15, children's access to power production and workplaces is not stopped;
Article 11: In case of any of the following habitual violations, the parties concerned and relevant personnel shall be given economic punishment of 50 yuan/time.
1, enter the building, and do not wear safety helmet at the aerial work site;
2. When working on the tower, hang the safety helmet on the tower or use it as a tool kit;
3. The door leading to the high-pressure chamber is not locked;
4, patrol the power distribution device, in and out of the high pressure chamber don't close the door and lock;
5, patrol equipment, lines are not in accordance with the provisions of the time;
6. After the opening and closing circuit breaker is operated, the actual position of the opening and closing action is not checked at the scene;
7, sign hanging location does not conform to the actual situation;
8. When the line branch switch is powered off, the sign "No closing when someone is working" is not hung after the switch is turned on;
9. The contents and signatures of the working ticket are illegible;
10, unqualified working ticket and operation ticket;
1 1, rural power production management personnel have no special operation certificate, and do not take the initiative to handle it, and participate in electrical work;
12, unlicensed electrician operating in the system power grid;
13. replace the fuse with copper wire, aluminum wire and other wires;
14, after maintenance, the lighting circuit was not checked, and the live wire and the zero wire were wrongly connected;
15, electrical equipment with protective grounding is not reliably grounded;
Chapter III: Accident Punishment
Article 12: A production accident in which a major accident occurs and a rural power worker is seriously injured.
1. The person responsible for the accident shall be given an administrative sanction of dismissal from public office, and the leader of the accident unit shall be given an administrative sanction of dismissal. At the same time, the above-mentioned personnel and related personnel will be given economic penalties of 500- 1000 yuan each;
2. Give the person in charge of the responsibility management department an administrative sanction of demotion, and at the same time give the person in charge and relevant personnel economic punishment 200 yuan;
3. The punishment of bureau-level leaders shall be reported to the higher authorities for decision; Welcome to visit, welcome to visit,
Thirteenth rural electric shock casualties liability accident occurs.
Causing a liability accident and causing direct economic losses of more than 10,000 yuan to the bureau;
(1) If the person responsible for the accident is dismissed and retained, only the basic salary will be paid during the retention period, and a fine of 5% of the economic loss will be imposed;
(2) give administrative sanctions to the person in charge of the accident unit and revoke his post;
(3) The person in charge of the responsibility management department and relevant personnel shall be fined 200 yuan;
(4) the main leaders of the party and government and the director in charge of the bureau are fined 100 yuan;
Article 14 In case of other assessment accidents, fire accidents, traffic accidents and boiler accidents, 500 yuan, the person in charge of the accident, and 200 yuan, the person in charge and relevant personnel shall be fined 100 yuan, and the leader in charge shall be fined 100 yuan.
Chapter IV: Provisions on Safety Production Evaluation
Fifteenth production safety assessment once every six months.
Article 16 If one of the following circumstances is found in the assessment, 20% of the unit safety bonus will be deducted.
1, the superior safety production documents and notices have not been implemented and recorded;
2. The safety task assigned by the superior is not completed;
3. The Spring and Autumn Inspection and the 100-day safety activities were not planned, arranged, summarized and evaluated, and important defects were not handled in time;
4, class, group did not carry out weekly safety activities in accordance with the provisions;
5. No exam explanations, technical questions and answers, anti-accident drills, etc. Failing to pass the superior inspection;
6, monthly safety meeting, quarterly safety analysis, half a year, annual safety work summary did not do it;
7, should participate in the safety technical training organized by the bureau, absent from the exam, make-up exam and failed personnel;
8, need to report the safety work written materials and various statements are not reported in time;
Chapter IV: Punishment for safety supervisors' failure to fulfill the standards in place.
Article 17: After receiving the notice of large-scale construction, the safety supervisor cannot follow the on-site supervision, and 50 yuan will be fined at one time.
Article 18: The safety supervisor must regularly check the "two votes" as required, and punish the safety supervisor 20 yuan for failing to check as required.
Chapter 5: Incentive clauses
Nineteenth units shall not have assessment accidents throughout the year, and the statistical accidents shall be controlled within the indicators issued by the superior. When there is no violation, bureau-level units will issue safety bonuses.
Article 20: A reward of 200-500 yuan will be given to those who have rendered meritorious service in stopping serious accidents in time.
Article 21: For a larger single project with more than 6,543,800 yuan, there are no violations and accidents, and 654.38+ 0% safety bonus will be included in the project to reward relevant personnel.
Twenty-second in any of the following circumstances, shall not be awarded to safety award.
1 and units and personnel punished by accidents within 20xx years;
2.20xx units that habitually violate the rules for more than two times within xx years;
3. Persons who violate the relevant provisions of these Regulations;
Article 23 In case of a habitual violation within the year, 30% of the safety bonus of the person in charge of the unit shall be deducted, and 50% of the safety bonus of the violator shall be deducted.
Chapter VII: Supplementary Provisions
Article 24 The rewards and punishments of these Measures shall be carried out at the same time as the mortgage safety risk assessment, and the rewards and punishments shall be repeated.
Twenty-fifth fire, transportation, boiler safety management work by the office to develop assessment rules, responsible for the implementation, inspection and assessment, and the assessment results will be reported to the safety supervision department.
Article 26: These Measures shall apply to the Rural Power Bureau. If there is any conflict with the superior regulations, the superior regulations shall prevail.
Twenty-seventh approach by the Bureau of production safety committee and safety supervision department is responsible for the assessment, the right to interpret belongs to the Bureau of production safety committee.
;