2. The construction site in front of the three guarantees. Before leaving the construction site, build transport vehicles and earthwork excavation equipment. Tires must be washed and desliming treated, and vehicles that are prone to dust such as sand, stone, cement, earthwork and garbage should be transported in a closed manner. Transfer building materials, garbage, soil, etc. And take measures not to pollute the urban environment. Measures should be taken to prevent dust, noise and construction from disturbing people. Night construction according to the provisions for night construction permit. It is forbidden to burn toxic and harmful substances on site. The mixing shed is surrounded by colored strips of cloth and hung with a dense mesh safety net. The ceiling is covered with 50mm thick wooden boards and covered with a layer of bamboo veneer. The mixer is equipped with a spray device to prevent dust.
3. It is forbidden to throw construction waste at high altitude to prevent the dust from flying. The removal of construction waste must be carried out in a sealed container, and the site and ground must be cleaned by wet operation, and cement must not be mixed at the scene. Consciously abide by the relevant laws and regulations on environmental protection, and take measures to prevent or reduce dust and waste gas at the construction site.
Harm and pollution of waste water, solid waste, noise, vibration and construction lighting to people and environment.
4, the main channel of the construction site and material yard, must adopt concrete ground hardening treatment, material field must be smooth and compact. Temporary facilities, mechanical equipment, various building materials, etc. According to the general layout, the materials are arranged reasonably and neatly. Steel should be classified on the pier, steel formwork and wooden fang should be packed neatly, fasteners should be cleaned and put into the tray, and inflammable and explosive articles should be classified and stored according to regulations. And at the same time do a good job in the identification of various materials. Car washing facilities are set at the exit of the site, and tertiary sewage sedimentation tank and drainage ditch are set in the site to ensure good drainage system. Construction sewage, domestic sewage and sewage discharged by transport vehicles shall not be discharged into urban sewage pipes without passing through the sedimentation tank, and sewage shall not be discharged into rivers and rainwater pipes: there shall be no accumulated water in the site, and the roads shall be smooth, solid and smooth.
5. Temporary facilities on the construction site should be set according to the general layout, and the construction work area should keep a safe distance from the office area and living area. No staff dormitory shall be set up in the unfinished building. There is greening arrangement on the construction site. The lighting, ventilation, hygiene and fire control of the office, conference room and staff dormitory on the construction site are good, meeting the requirements of relevant standards, safe, concise and applicable. The living quarters are managed by special personnel, who are responsible for daily hygiene and environmental management. The canteen management conforms to the provisions of the Food Hygiene Law of People's Republic of China (PRC), and the hygiene license and the health certificate of the cook are complete and hung in the canteen; The canteen is equipped with effective measures to prevent flies and rats, such as suspended ceiling, screen doors and screens, and 60cm high iron sheet at the lower part of the outer door, and it is always clean and hygienic. Ensure that the supply of sanitary drinking water and the construction of shower room meet the requirements.
The dormitory is one person and one shop, the daily necessities are neatly arranged, and the quilts, towels and shoes are three lines. Unified storage of production tools; Domestic garbage should be managed by special personnel, put into containers and cleaned up in time. And the establishment of temporary housing management system, management by designated personnel. Project intends to establish a health responsibility system, conduct regular cleaning and hygiene inspection every day, and conduct informed criticism and fine treatment on unqualified dormitories on the whole site. It is forbidden to pull and connect wires in the room, and it is forbidden to open a small stove with an electric stove. Smoking in bed is strictly prohibited. Flushing toilets that meet the hygiene standards shall be uniformly set up at the site, cleaned and kept clean by special personnel, tea kiosks, blackboard newspapers, bulletin boards and newspaper reading columns shall be set up, and a "workers' home" activity room shall be set up for employees to study and entertain.
6. Establish first-aid measures for health care drugs on the construction site, set up health care medicine boxes and first-aid equipment, and set up 1 medical staff. Carry out health and disease prevention publicity and education at any time, and regularly decontaminate the living quarters, especially canteens and toilets, to ensure the health of employees.
7. All kinds of signs and slogans hung or written on the construction site shall be executed in strict accordance with the Regulations on the Management of Enterprise Image on the Construction Site, so that the handwriting shall be neat, standardized, beautiful, neat and appropriate. Safety signs are eye-catching, and hanging signs are safe and reliable. 8. During site construction, closed construction shall be implemented, and internal and external protection shall meet the requirements. The binding of dense mesh safety net must use ropes, and the binding should be firm. The erection of the network should be strict, and the supports, load-bearing platforms and construction elevators should also be handled accordingly, so as to be standardized, neat, beautiful and safe; Firm, in line with the requirements of relevant standards. Scaffolding pipes, limb and limb protective railings shall be painted according to the use requirements.
9, the construction site to establish and improve the public security system and fire management system,
Implement the corresponding public security fire control measures and responsible persons, configure fire control facilities and equipment according to regulations, go through the formalities for examination and approval of hot work, and implement the hot work guardian. There are several fixed smoking rooms on site, and smoking at will is strictly prohibited.
10. Implement strong management on subcontractors, strictly control their qualifications, and manage, control and assess their safety, quality, progress and civilized construction; Conduct on-the-spot investigation on the technology, economic strength, staffing, social reputation and safety technical level of each subcontractor. The subcontractor's qualification, technical level, safety level and staffing should be reported to the supervision company and management company for approval before entering the site. 1 1. The project department will handle industrial injury insurance for employees and accidental injury insurance for special operators and special types of work.
12, this project plans to invest safety protection facilities, labor protection articles, and on-site civilized construction funds 1 10,000 yuan, which is earmarked for special purposes. 13, the construction site should plan and specify the person in charge of safe and civilized construction in this area, and the person in charge of each area should be responsible for the safe and civilized construction in this area. The Project Management Department conducts monthly appraisal, rewards and punishes chaos, and promotes the smooth development of safe and civilized construction.