A period of work ended inadvertently. Looking back on your work during this period, I believe you have a lot of feelings, which also means that you are ready to start writing your work summary again. What kind of work summary should you have read? The following is a summary of the annual work of Construction Engineering Group (5 general remarks) compiled by me, which is for reference only. Welcome to read it.
1, the annual work summary of Construction Engineering Group, really lamenting how time flies. It passed in an instant, and it was also a year of my own work. I have been working as a construction technician in the project department since I came to work in xx Company. These days, there have been ups and downs, and more importantly, there have been gains. Summarize the work in the past year and talk about the understanding of technical work from a personal point of view.
I. Overview and Importance of the Project
An important special project of xx project is to connect the hub with the traffic artery of xx city. It is reconstructed from the subgrade of Pingle branch line of the old Beijing-Guangzhou railway, with a total length of 1379 1 km, designed according to the standard of third-class highway, with a concrete pavement width of 65 meters and two lanes. The completion and opening of the road on the left bank will create good traffic conditions for the transportation of raw materials and mechanical and electrical equipment for the main project of xx Gorge Water Control Project, and provide strong traffic guarantee for the realization of the project construction goals. In order to ensure that the xx dam reaches the elevation of164m in June this year, it will have water storage conditions at the end of the year and set foot on the "fast lane".
Second, the project quality management
Technicians working in the construction front line should be responsible for the quality, safety and progress in the construction process, report the problems that need to be solved and improved in the construction in time, and propose solutions to the leaders. In the work, we should deal with the relationship with the construction personnel and the supervision owner, and everything is based on ensuring the progress, quality and safety. Engaged in technical work, but also have a good attitude of learning and studying. It is far from enough to rely on what you have learned from books. You must have rich field experience, which requires a detailed understanding of the construction drawings in advance and a targeted construction process in your mind.
As an engineer, his work is also very hard. It is necessary to make a good plan and prepare for the follow-up work in advance to ensure that the follow-up work is not in a hurry, and there is no shortage of east and west, which will not affect the construction period. We should also do a good job of supervision in the construction process, conduct a comprehensive inspection of the project quality, promptly put forward and correct potential problems in the construction process, and conduct a full-course follow-up inspection of the construction process of special procedures. At the same time, I have to run around the construction site during the day to guide the construction, and at night I have to sort out the internal information of the day and arrange the work for the next day. Especially in time, it is even more difficult, which requires the spirit of hard work to complete the day's work in time.
As an enterprise, profit is the ultimate goal, so under the premise of ensuring the quality of the project, we should pursue the maximization of interests. This requires us to pay attention to the reasonable arrangement of construction technology and procedures in the construction to minimize the project cost. At the same time, pay attention to saving manpower and materials in the construction process. For the changes that can be added, we should strive for them from the supervisor and the owner in time.
Third, the engineering data arrangement
All kinds of indoor data and quantity confirmation data formed in the construction process shall be signed by the supervision engineer in time, so as not to affect the later measurement. During this year, I have been working as a road engineering technician on the left bank of xx Gorge Water Control Project, responsible for the construction acceptance, quality supervision, quality evaluation and completion acceptance of the fifth bid section. Because I am familiar with on-site construction, I need to help the indoor team to sort out and report the changes in time to provide data basis for future settlement and completion.
Four. Experience and lessons
Construction not only needs the support of technical theory, but also needs rich field experience. During this year, I also gained some experience: for example, the construction process of cutoff wall: setting out-introducing holes-grouting, in which attention should be paid to prevent the introduced holes from collapsing and blocking. The general method is to use mud to protect the wall, but the better method is to use pvc to protect the wall and use thin-walled pvc pipes, which not only plays a good role in protecting the wall, but also plays a good role in the subsequent grouting process.
Of course, mistakes will inevitably occur in the construction: for example, at the joint between the culvert body of Beixiang water transmission box culvert and the slab of the box culvert, due to my negligence, there is no lap groove reserved here, so all the slabs are placed on the rigid foundation filled with rubble, and over time, the slabs will sink, resulting in a height difference with the box culvert, which is easy to cause damage to the box culvert. After several senior engineers' on-site decisions, reinforced concrete corbel is added to the box culvert as a flexible foundation, and the top slab is used as a remedial measure.
There will inevitably be mistakes in the project, and every mistake is a profound lesson. With lessons, we can enrich our experience, and with experience, we can avoid mistakes. However, with the increase of work content, I gradually feel the lack of knowledge, which will definitely affect the future work efficiency and limit the development of personal space. Therefore, I also use my spare time to read a lot of professional books, explore and learn new knowledge and technology, and at the same time apply professional knowledge in combination with reality. If shift workers don't understand at the scene, it is necessary to communicate with them. Through communication, they not only improved their professional quality, but also increased their own experience, so that the construction force and technical force of our company developed together.
Shortcomings and Improvements of verb (abbreviation of verb)
Although I have made a big step towards my goal in this year, I still see that I still have many shortcomings. Unstable development, insufficient theoretical level, hasty thinking and lack of experience are all aspects that I need to work hard on. In the coming year, I believe that as long as I find the right direction, I will definitely make a breakthrough and succeed!
Annual Work Summary of Construction Engineering Group II Looking back on this year's work, we have the joy of success, the hardships of tackling key problems with colleagues, and the melancholy when encountering difficulties and setbacks. Time flies, the new 20xx year has arrived, and the new year means a new starting point, new opportunities and new challenges. In order to better complete the work in 20xx, foster strengths and avoid weaknesses, the work in 20xx is summarized as follows:
In 20xx, I was transferred to the planning residential group, and participated in the planning and design of several residential quarters more closely, and gained a further understanding of planning knowledge and a certain practical ability.
As a designer, he mainly controls the floor area ratio, building density, greening rate, building height and spacing through the current national norms and local government departments. Secondly, the determination of basic column network, the connection between fire escape and residential road network, and the choice of architectural style are also several problems that a mature designer must skillfully solve. When I encounter difficulties in my work, I humbly ask leaders, other colleagues and experts for advice, which has achieved good results and accumulated a lot of valuable experience.
The design of residential units is my focus this year. A good residential unit planning should not only be square, practical and conform to the norms, but also be coordinated with the planning and design of residential quarters and architectural appearance design. It is also necessary to know more about the trend and trend of real estate development, understand the commercial purpose of developers, and strive to find the combination of designers and developers.
Over the past year, I have participated in the design of most projects of the design institute, such as apartment design, xxx project, xxx project, xxx project and so on. Follow the colleagues in the design team to consult the information, check the specifications, conduct field visits, and humbly consult experienced leaders and colleagues, which has gained a lot.
After this year's work, I still feel that my progress is too small and I am still so far from my goal. And the longer you work, the more you learn, and the more you feel inadequate. In short, achievements belong to the past and mistakes have become experiences. In the future work and life, with the continuous expansion and business growth of design institutes, we will still face great challenges and pressures. Personally, I think there are several points that need special attention.
First, strengthen the cultivation of their own business ability, increase their proficiency in all aspects of design, suffer more, think more, and strive to improve work efficiency;
The second is to enhance the sense of urgency and competition with peers, and create an atmosphere of chasing after each other. If you don't study and make progress, you will be eliminated by society;
Third, strengthen unity and cooperation with designers of design institutes, maintain a peaceful mind, communicate and cooperate more, and fully tap the collective potential.
Finally, I strengthened my sense of responsibility. Countless times, I used the word responsibility to measure myself and demand myself. No matter what you say or do, you should take responsibility. It is inevitable to shoulder the responsibilities of work, society and family.
The new year is coming. I believe that under the correct guidance of the leaders of the institute and the joint efforts of all the designers in the unit, the development of our institute will surely flourish. Each of us will have a bright future.
Summary of the annual work of the third construction team. I have worked in the architectural design institute of the Group for 20xx years. After a three-month probation period, I was fortunate to be an employee of the group. Looking back on my work in the past few months, with the support and help of the company leaders and colleagues, I have been strict with myself and completed my work well according to the company's requirements. I would like to express my heartfelt thanks to the leaders and colleagues of the company for giving me an opportunity to show myself. Through this period of work and study, my professional skills and ideas have changed a lot. The work of these months is summarized as follows:
First, understanding and learning in the internship stage.
For newly graduated college students, engaging in design work is both an opportunity and a challenge. I am fortunate to be a member of X Group Architectural Design Institute. A few months ago, I adapted to the working environment as soon as possible and integrated into the design institute. With the care, support and help of leaders and colleagues, I will seriously study the knowledge of steel structure design, constantly improve my professional level and accumulate experience. During this period, I mainly studied the Technical Specification for Steel Structure of Light-duty Houses with Portal Frames, the Manual for Steel Structure Design, the Code for Architectural Design and the Code for Structural Design. In particular, the concept of steel structure design has risen from a preliminary understanding to a higher level.
In recent months, I have learned to improve the engineering quantity, quote the engineering quantity and design the gantry. By doing these works, I gradually improved my understanding of the design of light steel structure houses, and the connection and design of various components were more comprehensive, economical and reasonable. During this period, I exercised my patience by handling qualification upgrading documents and sorting out simple materials, and realized the importance of being serious, responsible and careful in doing any work, handling the relationship between colleagues and contacting all departments of the group.
Through continuous study and practice, using the theoretical knowledge learned, I gradually improve my professional skills, understand the core of design work, and actively respond to and advocate the corporate reputation spirit of "one heart, one strength" in line with the corporate slogan of X Group, so as to make more contributions to the development of design institutes.
Two, strengthen their own learning, improve the level of professional knowledge
Through the internship in recent months, I realize that my knowledge, ability and experience are still lacking, and I can't take it lightly in my work and study. I should devote more time to study, learn from books, learn from leaders around me, learn from colleagues and feel that I have made progress. Through continuous study and accumulation, I have gained some design experience, can treat all tasks with a correct attitude, love my work and try to implement it in practical work. Actively improve their professional quality, strive for the initiative in work, have a strong sense of professionalism and responsibility, and strive to improve work efficiency and quality.
Three. Existing problems and future efforts
Over the past few months, I have been able to devote myself to my work, love my work and not be afraid of hardship. I have made some achievements, but there are also some problems and shortcomings, mainly in the following aspects:
65438+
2. Sometimes work is lazy and not serious enough, and work efficiency needs to be improved.
My theoretical level, professional knowledge and work experience are still lacking, so I should study and practice harder.
In my future work and study, I am determined to seriously improve my professional knowledge and strengthen my sense of responsibility, and contribute to the rapid development of design institutes and the leap-forward development of the company's economy. I think I should try to do:
1. Strengthen study and broaden knowledge. Study hard on professional knowledge and related experience, and consult experienced people such as leaders and colleagues. Strengthen the understanding of the development context and trend of steel structure design, strengthen the understanding and study of the surrounding environment and the development of the same industry, and know your own advantages and disadvantages.
2, based on the principle of seeking truth from facts, actively do their own work, without delay.
3. Abide by the company's internal rules and regulations, safeguard the company's interests, actively create higher value for the company, and strive to achieve greater work results.
Adhering to the corporate slogan of "advocating perfection, pursuing Excellence, striving for perfection, and sparing no effort", we adhere to and advocate the corporate reputation spirit of "one family, one mind and one mind", and live up to the concern and help of the company leaders, the strong support and help of colleagues, strengthen our study and make more contributions to the development of the group.
I wish X Group a better tomorrow, and the design institute will become stronger and stronger with the development of the group!
Summary of the annual work of the four groups of construction engineering: I graduated from the Department of Building Engineering, xx, majoring in industrial and civil architecture in 20xx 10. Joined xxxx electric power construction company this month, and now works in the civil engineering laboratory of xxxx project. Since joining the work, I have abided by the rules and regulations of the company and the project department, actively obeyed the work arrangement of the leaders, successfully completed the work tasks, safeguarded the collective honor, demanded ideological progress, and conscientiously implemented the company documents and the spirit of the meeting. Seriously study relevant experimental knowledge and constantly enrich and improve yourself. Now I will briefly summarize the work of this year as follows:
I. Politics and ideology
Dressed in a strong sense of ownership, I always pay attention to the development of Power Construction xxxx Company. Personally, I think of the interests of Power Construction xxxx Company, project department and laboratory, and firmly believe that Power Construction xxxx Company will continue to grow and develop, and I am full of enthusiasm and expectation for the future of Power Construction xxxx Company. Although I haven't joined the China * * * production party, I will be strict with myself according to party member's standards, consciously accept the supervision and help of party member and my colleagues, and make unremitting efforts to overcome my own shortcomings and make up for them.
I start from doing my job and daily work well, from me, from now on, from the little things around me, and persevere. I will do my best and make unremitting efforts in my work. I will constantly improve my job skills, strive to master my job knowledge, be the backbone and expert of my job, and do my job in a down-to-earth manner.
Second, the work attitude
No matter at work or in life, I always believe that there is a harvest from hard work, so I have been working hard, studying hard and working hard. Love your job, be able to treat every job correctly and seriously, be dedicated and love your post, get to work on time, make effective use of working time and stick to your post. The construction period is tight, there are few people and many tasks. Being able to follow the work, ensure that the inspection task is completed on time and the project inspection is carried out smoothly, which shows that our testers have a strong sense of responsibility and carry forward the spirit of continuous work and hard struggle.
Third, job responsibilities
Conscientiously implement the national guidelines and policies on standardization, quality management system, product quality supervision and inspection and research and development; Really implement the relevant standards, testing methods and regulations of engineering products that this position is responsible for supervising and testing, and ensure that every test has laws to follow. Do a good job in entrustment acceptance, project investigation, data and feedback, and keep a tracking ledger for future reference. Due to many test items and different test time, the work should be done well in advance to avoid delaying the construction period and affecting the progress because the technical personnel of the construction unit do not understand the engineering test requirements and technical indicators. Our laboratory staff adhere to the four cardinal principles, carry out the quality policy, implement the quality objectives, abide by the rules and regulations, and serve the construction site wholeheartedly.
Fourth, specific work.
My job is mainly to test and inspect some civil engineering materials (cement, sand, stone, steel, brick, etc.). ) and finished products (steel weldments, concrete blocks, etc. ); Participate in concrete matching test; Supervise and control the mixing of concrete in the mixing station; Control site concrete and backfill soil, etc.
When I first joined the work, the first thing I came into contact with was the backfill inspection. Backfill soil is simple and boring, but most people think it's nothing but adding some soil. But after working for a period of time, it is not so simple: starting from the material requirements of the soil, compact the soil and set its control index; Which parts need to be backfilled and which parts need to be backfilled with sand or 3: 7 lime soil should be controlled by technical indicators; Selection of backfilling machines and tools; Are the conditions available before backfilling? Whether the strength of underground concrete foundation meets the specified requirements, the material selection, compactness requirements, virtual paving thickness and compaction coefficient of soil have been determined, and the backfill compaction can not meet the requirements, which will cause landslides, subsidence and even bring greater harm. Therefore, it is not so easy to do anything in your mind until other materials that you gradually come into contact with are tested, and there is no room for ambiguity.
Contact more project tests in the laboratory one after another, define the working procedures, and form clear working ideas in specific work, so as to carry out the work smoothly and complete the work skillfully and successfully.
1 control of raw materials: each batch of raw materials entering the site must have the manufacturer's quality guarantee and inspection certificate, and each batch of raw materials must be inspected according to the specified quantity. (1) For cement, when bulk cement warehouse is used, it is forbidden to mix cement from different manufacturers, varieties and labels. When using bagged cement, protective measures should be taken to prevent cement from caking due to moisture. When using cement stored for more than three months, contact the laboratory in advance to conduct a second review of the actual label of cement. (2) Sand and gravel shall not contain foreign bodies, coal dust, etc. Especially those that are not mixed with white ash. If the raw materials are found to be inconsistent or abnormal with the samples, they should contact the laboratory in time and handle them. In order not to affect the construction progress, all raw materials entering the factory must be debugged in time. The cement test adopts 3d strength and 28d strength, and the test reports of steel, sand and stone. Will be released within 24 hours after laboratory debugging. All materials to be tested must be certified by the laboratory before they can be used. The principle of inspection before use, otherwise it will be regarded as unqualified products and prohibited from being used in engineering.
2. Backfill control: Before backfill construction, the construction department shall truthfully fill in the backfill entrustment form and carry out the construction according to the requirements of design drawings. There is no requirement, according to national standards. The water content of soil material selected for backfill construction is the best. The paving thickness of each layer of backfill soil shall be compacted by layers according to the specifications, and shall not be rammed by leakage, and shall be accepted step by step. Only after passing the inspection can the next backfill be carried out, otherwise the construction unit will rework it.
3 concrete engineering. For concrete and mass concrete with special requirements, it should be entrusted in advance, and can be opened for identification after can opening. (2) Every time concrete is mixed in the mixing station, the mixture ratio should be strictly implemented, slump and workability should be controlled, and the mixing and production control records should be made. If the water content changes greatly, the laboratory should be informed in time to make dynamic adjustment. When using fly ash, environmental pollution should be avoided or reduced. The concrete test block is left in the mixing station, and the laboratory will assess the concrete production of the mixing station according to the concrete grade, batch and time produced by the mixing station to control the concrete production level.
4 The welder who enters the construction site for civil work must submit a copy of the welder's technical grade certificate and a list to the laboratory before the project starts. Before the start of the project, the welder should be tested for welding. After the test report is issued, the welder can carry out formal operation.
As soon as I joined the work, I quickly integrated into the work, constantly demanding myself and constantly urging myself to improve. As a young worker, I dare not neglect my work at all. I ask myself to write down the gains and losses in my work and the problems that appear every time, so as to learn lessons. If you encounter problems or difficulties in your work, you will consult with the general manager and leaders, listen to his opinions and suggestions patiently, and improve your work. Because my department only works in a small circle most of the time, I can't just sit back and wait. Frequent and irregular contact with the construction site to understand the engineering procedures and steps, so as to better serve the work in the future.
Verb (abbreviation for verb) Work achievement
I learned a lot at work and exercised myself. Through unremitting efforts, my work level has been further improved, and I was awarded "Personal Second Class Merit" by xxxx Project Department in the first 120-day Campaign Meritorious Competition. In addition, with the cooperation and cooperation of other colleagues in the laboratory, the civil engineering laboratory of xxxx project where I am located was rated as "collective first-class merit".
Looking back on the past year, I was busy and full. What I learned in school textbooks is all theoretical knowledge, and the practical experience accumulated bit by bit at work now is an inexhaustible asset in my life. This year, there were difficulties and gains. Because of my hard work, I have fulfilled my personal responsibilities and strengthened my ability to make greater contributions to the company.
Summary of the annual work of Construction Engineering Group 5 Time flies and years are like songs! In a blink of an eye, I have been involved for some time. Looking back on the work in the past year, I found that there was sweat, harvest, bitterness and growth. In order to foster strengths and avoid weaknesses in the future work, do my job well and enhance my own value, I summarize the main work contents, experiences and work feelings of the past year.
Since joining the work, I have been engaged in construction management, learning with an open mind and constantly improving my professional and technical level. I have participated in three projects in recent years, all of which are qualified.
This year, under the guidance of my master and colleagues, I gradually became familiar with project management. Before the construction of the project, detailed technical disclosure shall be made so that the operator can understand the characteristics of the construction task, construction technology, labor organization, technical organization, safety measures, consumption control, specification requirements, quality standards and other contents, as well as the special requirements of special complex projects or new structures, new materials and new technologies. Strictly control the quality of raw materials, components and equipment entering the site. All raw materials, components and equipment entering the site must produce the certification documents provided by the supply department, and the raw materials, components and equipment required to be rechecked in the specification can only be used after passing the inspection. Check the operation quality and intermediate product quality item by item according to the quality standards, and on the basis of quality inspection, check and record the concealed works, sub-projects and completed projects to ensure the engineering quality. Do a good job in the management of engineering and technical files. Engineering technical archives are the original technical and economic data of the project, the achievement of technical and engineering quality management, and the necessary basis for the use, management and maintenance of the construction unit. Therefore, the engineering technical files should be filled in truthfully and carefully with the construction process to avoid making up afterwards.
After 20xx years of study, I am basically familiar with the main contents of site management and the points that should be paid attention to in the construction process. In the next two years, under the guidance of my master and colleagues, I gradually began to do some work independently. I used a level to command the excavator to excavate, level and backfill the site, used GPS to locate the center coordinates, and used a total station to set out. These jobs have benefited me a lot. I want to be an excellent technician. No matter what I do, I must be myself first. Let me briefly talk about my experience in learning measurement.
First, carefully scrutinize and verify.
In the investigation and testing work, the work spirit of "careful consideration and careful verification" is very necessary. Before the survey and construction, the drawings must be carefully reviewed, and the mistakes in the drawings should be promptly raised to the design and supervision units. Before measuring and setting out, we should use the data given in the drawings, use various formulas to verify, and use different calculation methods (such as forward calculation and reverse calculation, etc.). ) to repeat the calculation, to ensure foolproof. Before preparing for the test, it is necessary to review the drawings to see whether the design drawings have special requirements for materials or whether they conflict with the current specifications. If there is any conflict, the principle of "strict but not wide" should be adopted, and a written report should be made to the director in time. Before testing, we should review the operating procedures to ensure the correct operation. We should not read books while operating, even if it is a very simple test. Pay attention to the preservation and timely sorting of all kinds of original materials, because "experience is summed up from a large number of materials"!
Second, combine with reality and innovate.
In the work, we should constantly sum up experiences and lessons, constantly improve, and apply what we have learned to our work to improve work efficiency. For example:
(1) Measurement and test data are directly input (or manually input) into the computer by the instrument, and the system calculates by itself, which can greatly reduce the chance of making mistakes, save a lot of time, and is very convenient for data storage, transmission and output.
(2) It is very easy to find out whether there is a problem in the drawing and straighten out all kinds of relationships by inputting the relevant data in the drawing, such as line position relationship and bridge position coordinates, into autocad.
③ In the setting-out operation of total station, the "rear intersection method" can reduce the requirements for measuring stations. (This is only suitable for rough survey) ④ For the project where there is no coordinate provided in the drawing and there is no traverse point nearby (the position of a certain point has been determined on site), it is very easy to assume that a certain point on the drawing (preferably a certain point of the structure) is the coordinate origin (0,0), use various relationships on the drawing, input it into autocad to calculate the coordinates of other points, and check all kinds of data and data output, and then use the calculated coordinates to carry out total station.
;