The total length of the line is 44. 1 km, with 34 stations along the way, covering a large urban area. The main passing stations are Xiangshan Road, Jinqiao Station, Shicheng Station, Jinhu Station and Yangcheng Lake South Station. I don't know such a wide range of traffic routes. As early as 20 14, Suzhou Metro Line 5 made a comprehensive assessment of the environment, and formally started construction when all the indicators reached the construction standards in 20 16. Up to now, Metro Line 5 has been under construction for four years. According to relevant data, it is estimated that the period from the comprehensive construction of Line 5 to its operation is June 20021year.