What are the preparations before the installation of the construction elevator?
1. After the construction elevator enters the site, the manufacturer shall show the product certificate and provide the instruction manual. According to the technical requirements in the Acceptance Sheet for Safety Technology of Construction Elevator Installation, check the preparation work item by item.

2, installation operators should hold relevant certificates, accept technical, safety and other disclosure, formulate construction elevator safety operation procedures.

3. Working environment:

1) The total power supply location must meet the power supply requirements;

2) There shall be no obstacles such as electricity and gas welding that hinder the operation of the car within 5 meters of the foundation part of the elevator installation site;

3) The platform and passage entering the building from the hanging cage should reach the bearing capacity of more than 2 tons, and should have solid protective fences and doors;

4) It is forbidden to use the guide rail frame, attachments and floor platform passages to hang scaffolding, construction pipes, ropes, cables, slogans, flags and other items unrelated to the elevator;

5) There should be sufficient lighting for night operation, and the call platform should be equipped with a sign lamp;

6) The protective door leading to the floor should be locked in a cage, and the floor number should be clearly marked on each floor.