2. When the coating melts, the temperature should be controlled between 180-200℃. After melting, it should be fully stirred evenly, and discharged after 3-5 minutes of heat preservation, so as to fully reflect the performance of hot melt coatings.
3. The bottom oil should be fully treated, and the marking line should be painted after the bottom oil is completely dried.
4. For the newly completed cement pavement, try to postpone the construction for three months or carry out the secondary priming treatment. Otherwise, the sign line will easily fall off.
5. In the road construction with heavy traffic, please set isolation measures after painting the bottom oil to prevent the wheels from rolling, take away the bottom oil and leave dust, otherwise some marking lines will fall off easily.