Question 2: How do you say fake welding and repaired products in Japanese? I don't know whether you want to express a defect or a project.
If it is a project, I think it is "integration";
If it is not good, I wonder if "dissolution and separation" is appropriate?
Whether the repaired product is "returned" or "straight" depends on your context. I don't know, right?
I hope I can help you.
Problem 3: welding technology is not in place, quality awareness is poor, management is not in place, turnover area and so on The current is too small to cause false welding,
Current (でんりゅぅ), low current (ひく), leakage (よぅせっ)
Welding technology is not in place,
Fusion bonding technology (よぅせつぎじゅつ) is not enough.
Poor quality awareness,
Quality awareness (ひんしつぃしき) is low (ひく).
Management is not in place,
Management (かんり) is incomplete (ふかん).
Turnover area,
Ring (じゅんかん) ェリァ
Defective products ready for maintenance
It is necessary to repair the defective product (ひつよ).
Question 4: How to write the maintenance time in German? Nachar Bestaing
repair time
Hope to adopt!
Question 5: The engineering cost of building rework. Hello!
According to your description,
First, the person who made the railing shall be liable for breach of contract, including continuing to perform, taking remedial measures and compensating for losses.
Second, people who make railings can't do this business. However, since the two sides have reached an agreement, one party has paid the fee, and the other party has fulfilled its obligations, otherwise it should bear the liability for breach of contract.
The above suggestions are for reference only.
Question 6: What about the collective violation of discipline in the workshop? Yesterday, because the handwork was not done well, I took the handwork team leader and QC to the guest for rework. Therefore, the staff in the workshop explained the following questions:
First, your company lacks a corporate culture of centripetal force and cohesion.
Second, your company's incentive system is not perfect.
Third, you have a problem with the way you manage your employees. As a grass-roots cadre, you should play the role of "no relatives, no relatives, daily pastor, system supervisor, first coach and leader". Please think about how many of these five items you have completed. When you feel that you have achieved all your goals, you are a qualified supervisor!
As for the specific solution, I have no choice, because each company's environment, culture and system are different, and the way of managing employees is different. But as long as you can solve the above three problems. Your plan will come out! thank you
Question 7: Please translate the following sentence into Japanese: Xiu 1. Maintenance, cleaning, sorting and replacement of official parts. 2. Pay attention to the length, accuracy and direction of the gold mold and core. 3. When welding is needed, ensure the preheating temperature before welding to avoid half-field leakage and hole leakage. 4. During EDM and WEDMやNC machining, attention should be paid to the accuracy of electrodes and reference points. 5。 Ensure that the fitting accuracy is ≤ 0.025mm, and move, reshape, study and match if necessary. 6. After the gold mold is repaired (general repair, repair, etc.). ) difficulty のメンテナンスパティング) after confirmation. 7. Before the mold repair is completed, the mold should be sprayed and protected, and the mold should be kept intact. 8. The Manufacturing Department for Repairing Metal Mould shall complete the confirmation of Custody Line, Repairing Metal Mould and 3.312467; ピュタ 2. Try this question. See "I", "I", "I" and "I" are responsible for gold restoration and solving the problem of qualified restoration.
Question 8: "The factory plans to rework tomorrow, and I will check the quality after rework". Wait online! The factory plans to rework tomorrow. I will check the quality of the reworked parts again.
Question 9: How to reduce the problem of plate rework in the production line of panel furniture factory? The biggest source of plate waste is size error, followed by unreasonable cutting. Therefore, in order to reduce the rework of cutting, it is first to determine the size before cutting, and then cut the material without error. Also, blades should be sharpened frequently, and blades that are not sharp enough are easy to form stubble.