Current location - Quotes Website - Team slogan - Smt year-end summary
Smt year-end summary
The following is a summary of my annual work on smt. For more information, please enter the work summary column.

Chapter 1: Year-end summary of SMT workshop quietly left in 20xx. In this year, with the help and support of the company leaders and team members, according to the requirements of the company and the workshop, through continuous efforts, writing has become a necessary job for myself, with a new breakthrough in the existing working mode and a great improvement in work efficiency. First of all, the work in 20xx years is summarized as follows:

1. Pay close attention to production efficiency: Compared with other workshops in the company, SMT workshop is a highly automated workshop.

2. Ensure product quality and improve product quality.

With the increasingly fierce competition in SMT industry, enterprises all know that as workshop leaders, their work directly affects the quality of the workshop. Out of the idea of being responsible for the company, I have been afraid to relax in terms of quality, actively find and control possible problems, and cooperate with various departments and relevant personnel to effectively deal with serious quality hidden dangers in time to prevent similar problems from happening again. Colleagues strengthen employees' understanding of the importance of quality and ask everyone to do self-inspection and mutual inspection to ensure that.

3. Strengthen team building and improve team management.

4. Strengthen self-study and improve management level.

Because I feel that my typing is very heavy, and my knowledge, ability and experience are far from being an excellent and competent team member. Therefore, I have been afraid to take it lightly, and I have been studying, actively improving my management knowledge, improving work efficiency and quality, and striving for the initiative in my work. Through this year's study, I feel that I have made some progress and can handle all kinds of problems in my daily work independently and calmly.

Chapter 2: smt year-end summary 20xx years have become a thing of the past unconsciously. Thank you very much for your strong support and concern for my work. Looking back, I summarized my work as follows:

I. Summary of work

In the first half of the year, he mainly engaged in SMT production and defective product repair. The following year, due to the sudden departure of the previously recruited inspectors, the inspection work fell on me. I was only busy with production before, and I didn't know the great pressure I faced as an inspector.

Second, the main problems in the work are:

1, the situation in the first half of the year: At present, most of the products of the company are not stable, among which the materials are messy, and the material coding styles of each company are different, and quality problems caused by production reasons occur from time to time.

2. Situation in the second half of the year: mainly taking over the inspection in the second half of the year. The products that go out from my hands are directly customer-oriented, so the pressure is relatively high. Sometimes PCBA is often missed, which leads to the problem board flowing to customers, and the customer satisfaction decreases.

3. In production, sometimes due to the tight production time, the problems found cannot be solved immediately and communication is difficult.

Third, work experience.

1. In my 20xx years of work practice, I have participated in many collective work and got along very well with my colleagues. In this process, I strengthened the most precious and important team consciousness. On the basis of trusting yourself and others, the team will be invincible if they have unified thoughts and actions.

I have achieved satisfactory results in my usual work. Being able to act positively and confidently is the biggest progress in my mind. Now I often calmly analyze myself, recognize my position and ask myself how much I have paid; Always remember that the work content should be precise and accurate, and personal gains and losses should be vague; Avoid risks in time, and be brave enough to take responsibility when problems arise.

3. In these months' work, I have learned a lot of knowledge about technology and details, and also strengthened my awareness of production quality and progress; The cooperation with colleagues around me is more tacit. They are all my teachers. I learned a lot of knowledge and skills from them, and learned the truth of being a man. I am very glad to have them around at this time. I will definitely form an excellent team with them and make better achievements.

Fourth, work experience.

I found that there is still a gap between myself and a professional, which is mainly reflected in the immaturity of work skills, work habits and work thinking, and it is also the place where I will constantly hone and improve myself in my future work. To sum up, in the past few months, I have not done well in the following aspects:

1. The organization of work is not clear enough, so it is necessary to prioritize.

In the case that the production time is very hasty and there are many things, there must be a detailed and clear plan, which needs to be completed immediately and can be completed slowly. There is still a lot of room for optimization in this respect.

2. Not familiar with the process

In several months' work, I found that there are many situations where I don't know how to start because of process problems. There are mistakes, omissions and shortcomings, and the control of this piece is obviously not enough. But in the final analysis, familiarity with the process is the prerequisite for the smooth completion of the project.

This work is not detailed enough.

There is usually a lack of a process of reflection and reporting from the fine chemical industry at any time. Although the works often look back, they lack regularity. In the future, we should set aside special time for summary and reflection in our personal work, so as to be refined.

4. The working methods are not flexible enough

In the process of development, we should make full use of the resources around us and don't take everything into our own hands. First, it affects the progress, and second, it cannot guarantee the quality. Prioritize things, grasp the main contradictions, draw a clear line, and think clearly about what your job is, what help you provide and what you want to do. How to communicate with other departments, how to communicate with the staff of this department, and how to provide quality services without doing more things other than duties are the places we need to focus on communication and learning in the future.

5. Lack of knowledge summary of usual work

My work has improved in recent months, but it is still not enough. If I look back every day, every week and every month and think about the right and wrong of my work, I will grow faster. In the future work, I will also regard this as the key to improve myself.

6. Lack of understanding

At present, because my work is not very accurate, the operation and debugging of the mounter, AOI programming, AOI inspection, problem board repair, BGA ball planting repair are all my current work contents, and sometimes I lack the overall concept and understanding of the job positioning. As a result, we don't know enough about the optimal process of work, lack logical ability and lack structural thinking. But I believe that in the future work, I will continue to study and think, so as to strengthen my cognitive ability to work.

Verb (abbreviation of verb) working face

I may focus on product quality in the coming year. I hope the company can recruit another inspector to help me improve the quality of SMT products. If necessary, I hope to set up one within the SMT team next year? Product quality fluctuation analysis improvement team? Learn from the successful quality management model of my last enterprise;

1. Grasp the source of product quality: if possible quality anomalies are found, they should be dealt with in time, and relevant records should be made for case analysis.

2. Production quality control: know a little about product quality in the production process, and make every effort to ensure that the qualified rate of each PCBA produced is 100%. If there is any problem, we will feedback and record it in time, and we will also record and feedback the problems that we cannot know.

3. Product quality inspection: visual inspection, full inspection and random inspection are required if conditions permit. No one can complete the product quality. I hope to get the support of leaders and the help of colleagues. Ensure product qualification rate 100% and customer satisfaction 100%.

4. At the end of each month, analyze and improve the quality data collected last month, and use the fishbone analysis method I used in my previous company to subdivide the problems with large quality fluctuations, find the source of the problems, and ensure the controllability of the problems.

Among them, the following points are the key points that I need to improve in the coming year:

1, work should focus on practical results and results, and all work should be completed around the goal;

2, improve the overall situation, whether the product quality can satisfy others, we can rest assured;

3, seize every opportunity to improve professional ability, strengthen the usual knowledge summary work;

4. Thinking and practice of fine chemical industry.

In the future work, we should listen more, watch more, think more, do more and communicate more, learn from each employee their excellent work habits, enrich their professional skills and cooperate with the continuous progress of practical work.

After working for more than a year, I sometimes deeply realize that technical work can't be perfect if I devote myself wholeheartedly. After all, the technical work is too complicated, the production task is heavy, and there are few people, but if I pay more, the work will be optimized, which requires me to seriously calm down and do things.

I recommend it carefully.