The installation and construction process and scheme of central air conditioning are the key steps to ensure the normal operation of air conditioning system. The following is an overview of the installation and construction process and scheme of a typical central air conditioner:

1. Project preparation stage: determine the installation location, formulate the construction plan, and prepare the required materials and tools.

2. Installation of air-conditioning main engine: According to the design scheme, install the air-conditioning main engine in a suitable position outdoors or indoors to ensure its stability and smooth exhaust of hot air.

3. Installation of air duct system: According to the design requirements, install the air duct system inside the building, including air ducts, elbows, tees, etc. , to ensure smooth ventilation.

4. Installation of terminal devices: According to the design requirements, terminal devices, such as tuyeres and regulating valves, are installed in each room to ensure that air conditioning wind energy is evenly distributed to each space.

5. Installation of electrical wiring: Install the electrical wiring of the host computer and terminal equipment to ensure sufficient power supply, safety and reliability.

6. Connecting pipeline: the hot and cold water pipeline connecting the host computer and the terminal equipment to ensure the smooth flow of cold and hot media.

7. Debugging and testing: After installation, debug and test the air conditioning system to ensure that all components and systems can operate normally.

8. System acceptance: After debugging and testing, conduct system acceptance to ensure that the air conditioning system meets the specifications and design requirements.

9. Cleaning: Clean up the construction site, and clean up the garbage and sundries generated during installation.

10. Training and handover: training users in operation and maintenance to complete project handover.

The installation technology and scheme of central air conditioning is a complex and important project, which needs to be constructed in strict accordance with the design requirements and installation specifications. Only by ensuring the quality and safety of each step can we ensure the normal operation and long-term stable use of the installed central air conditioning system. In order to better install the central air-conditioning system, it is suggested to seek the help of professional air-conditioning installation companies or engineering teams to ensure the control of construction quality and construction period.