20 19 model essay on welding personal work (1)
Since graduation in 2007, I have worked as a lathe worker in machinery factory first, and came to Tianyu Company as a lathe worker on October 20 15. In the past few years, with the care and help of workshop leaders and colleagues, I have successfully completed all the work and my ideological consciousness has been further improved. I love my job, have a strong sense of responsibility and dedication, and actively study professional knowledge. I have a correct working attitude and am serious and responsible. 20 18 was assigned to participate in plasma welding because of work needs. As the saying goes, "you have to love one line if you do one." As a newcomer to alloy spraying, I humbly learn from the leaders of the company and the predecessors engaged in this industry in my work, learn from each other's strong points, and then explore and learn by myself, and gradually become familiar with the basic essentials of spray welding. Our company mainly uses nickel-based alloy powder and cobalt-based alloy powder as spray welding matrix. Nickel alloy powder has high wear resistance, but even the best material needs technical support. Plasma spray welding needs extremely high current, which easily leads to low hardness and low wear resistance. If this alloy does not meet the standard, it will be worn away. If the current is too low, the alloy will crack and the current is too high. In order to prevent the alloy from cracking, the hardness must be controlled between 40 and 45, and the heating temperature of the screw cannot be controlled to be too cold or too hot. It is easy to cause the alloy adhesion to deteriorate. After spraying, heat preservation measures need to be put in place, some need to be kept at 450 degrees, some need to be placed on a shelf for rapid cooling, and some need to be cooled slowly with glass wool. The heat preservation effect is too strong, which is easy to reduce the hardness, and the heat preservation effect is not up to standard, which is easy to lead to alloy cracks. In addition, in the process of spraying, the fluidity of the alloy and the color and hardness of the alloy after spraying should be observed with eyes at any time to ensure the spraying quality.
In recent years, I feel at home in my work. In addition to the technology learned from the above plasma spray welding work, I also mastered other mechanical working methods, and gradually mastered mechanical processing technology, mechanical drawing and mechanical equipment technology.
Next, I will constantly improve my working ability and be more strict with myself. In addition to being familiar with drawings and specifications, I will continue to learn engineering and professional related knowledge and arm myself with knowledge. Ask more leaders and learn from colleagues. After four years of ups and downs, every time the company gives me an opportunity, it is a kind of trust, a test and an exercise for me. Indeed, born in sorrow, died in happiness. In today's fierce competition, it forces you to study, stand on your own feet, challenge yourself and adapt to the high demands of others. Only on this tight string can we feel the fullness, richness and significance of life.
20 19 model essay on personal work of electric welding (2)
I was born in 1975. I am 37 years old and graduated from Tongliao Technical School. Now I am studying economics and management correspondence course in Tongliao Party School. 1995 joined the work, studied as a welder in Tongliao Forestry Machinery Factory, and worked as a welder in China Liu Ye and Tongliao Boiler Factory successively. 20xx has been working in Huomei Tongshun Carbon Company ever since. He is currently the monitor of machinists and fitters.
In the past seventeen years, with the education of leaders and the help of comrades, I have worked hard to learn professional knowledge, and I have been conscientious, down-to-earth, hard-working and conscientious in this ordinary job of electric welding. In my usual work, I earnestly and humbly learn from my master and consult experienced comrades, so as to constantly improve my professional skills and enrich myself. Participated in professional training organized by labor and personnel departments for many times, and obtained welder certificate. After 20xx years of hard study, I obtained the third-class qualification certificate of welder. Because I usually work hard. So far, I can carry out five welding operations: manual arc welding, gas welding, co2 gas shielded welding, argon arc welding and submerged arc welding.
First, improve professional skills and create business success.
I have been a welder for seventeen years, studying and working at the same time. Work hard to achieve safe and civilized production at work without major accidents. Actively specialize in business, constantly improve their professional level, and make contributions to the development of enterprises. The welding qualification rate reaches 100%, and it has been rated as an advanced production worker and an advanced model for many times.
In the most ordinary job of electric welder, I strive to realize my life value. Make our due contribution to the development of our enterprise. Try to convey, help guide and give play to your talents. During several major equipment renovation and installation, I led everyone to complete the task well, saving money for the company and running well so far.
1. Work for one year, obtain welder qualification certificate and manual arc welding operation certificate, and study while working. When I was working in MCC No.6 Plant, I studied hard and learned the essentials of co2 gas shielded welding and submerged arc welding, and obtained the welder's qualification certificate of Grade 4. The expansion of electrolyzer in Fushun aluminum plant, the expansion of electrolyzer in Tongliao aluminum plant and the construction of electrolyzer in Huolinhe aluminum plant all have the results of my efforts.
2.20xx came to work in Tongliao Boiler Factory, where I studied argon arc welding and obtained the qualification certificate of boiler and pressure vessel welding. Make a batch of economizer for power plant boilers and install boilers. After coming to Huomeisu in 20xx, I studied theory and practical operation in the advanced welding class of Tongliao Technical School. In 20xx, he passed the theoretical and practical examination and obtained the third-level qualification certificate. So far, I have been working in the coal-fired carbon machine repair workshop.
3.20xx years as the monitor of technical transformation class, leading the whole class to participate in our company's oxygen-enriched project and milling workshop construction project. 20xx served as the monitor of pipeline water heating, and summed up the skills of welding pipelines under pressure in his work. In 20xx, the organization needed the locksmith class 2, and the monitor and our class mainly managed the maintenance of Ander furnace. According to the past experience, I repaired the cracks in the gas holder of Ende furnace under pressure and the ash cyclone at low temperature without stopping production. It has brought huge economic benefits to enterprises.
Strive to do a good job of communication, help and guidance, and cultivate more talents for our enterprise. All the people I have led are now able to finish their work independently, and some have even become monitor. Made due contributions to the company.
Second, improve safety awareness and ensure safe production.
In more than ten years of welding work, I always put safety first, strictly abide by safety operation rules, constantly improve safety awareness and ensure safe production. Welders have potential hazards, such as smashing, bumping, stabbing and scalding.
Injuries, etc. Sometimes aerial work is more dangerous. If it is not properly protected, not only can the work not be completed, but it will also bring unnecessary losses to itself and the company, even greater losses. In my usual work, I have carefully summed up and accumulated experience in safety, mainly in the following aspects:
(1) is electric shock: equipment that may cause electric shock during welding or cutting work includes lighting lamps and various power tools. First of all, we should pay attention to whether the equipment, tools and power configuration are safe and qualified. Secondly, keep it dry and maintain it regularly.
(2) Arc radiation: Arc is a strong light, including visible light, ultraviolet light and infrared light. Its radiation is easy to cause harm to people's eyes and skin. Therefore, you must wear a filter glass helmet and mask when working, and put a baffle at work to avoid hurting others.
(3) Smoke pollution: the smoke mainly comes from the parent material, and the paint evaporates or burns when heated. It is easy to cause respiratory organ damage or other complications. Therefore, ventilation should be ensured during welding to avoid smoke retention.
(4) Fire and explosion: Due to the use of power supply and heat source for welding, improper protection may easily lead to fire and explosion. Therefore, in welding work, attention should be paid to prevent sparks and slag splashing during welding and heating, which may lead to fire or explosion. Necessary fire fighting equipment must be equipped.
Because I have taken effective safety measures for more than ten years, no matter working high above the ground or welding in the field, no matter day or night, there has been no safety accident, which has won benefits for the enterprise.
Third, love your job and do your job well.
1, love your job and do your job in a down-to-earth manner. To do a good job in welding, we must first have a high sense of responsibility and work seriously and responsibly. Personal interests are subordinate to the overall interests, to leaders, to arrangements, to be good logistics soldiers of enterprises and to provide good services. We should strive for perfection in our work and never get tired of it. Sometimes you have to sacrifice your rest time. As long as your job requires it, you have to act at once. Work is an order and there can be no conditions.
2, in the ordinary job, and strive to realize their own life value. I have been engaged in welding since I joined the work from the planning book. It can be said that I have dedicated my ideals and youth to the welding cause. Once upon a time, I was confused and swayed. With the help of leaders and comrades, I have a new understanding of this profession. A person's value orientation determines a person's goal, and the stage is as big as the heart. This is where the efforts to realize the value of life lie. My values can be summed up in one sentence: stand well in every post, do everything well, and integrate what I have learned with enterprise construction.
3. Serve the development of enterprises, take root in their own work, be loyal to their duties, be a good worker who loves and respects their posts, be conscientious, meticulous and loyal to their duties. Unify personal interests with enterprise interests, think about work everywhere, proceed from enterprise interests in everything, and actively do your own job. Strive for "first-class service" and strive to realize your life value in ordinary and ordinary posts.
Fourth, work hard and continue to do your job well.
Looking back, although some achievements have been made, there is still a long way to go compared with the developing society. I must further study hard, specialize in business, constantly improve my ideological and professional quality, learn from old age, inject modern scientific and technological knowledge into practical work, break through the qualitative leap of welding technology, and bring my work to a new level.
20 19 model essay on personal work of electric welding (4)
I came to work in the architectural design institute of * * and passed the probation period of @ months, so I was fortunate to be an employee of the group. Looking back on my work in the past few months, with the support and help of the company leaders and colleagues, I have been strict with myself and completed my work well according to the company's requirements. I would like to express my heartfelt thanks to the leaders and colleagues of the company for giving me an opportunity to show myself.
Through this period of work and study, my professional skills and ideas have changed a lot. The work of these months is summarized as follows:
First, understanding and learning in the internship stage.
For newly graduated college students, engaging in design work is both an opportunity and a challenge. I am fortunate to be a member of the architectural design institute of * Group. A few months ago, I adapted to the working environment as soon as possible and integrated into the design institute. With the care, support and help of leaders and colleagues, I will seriously study the knowledge of steel structure design, constantly improve my professional level and accumulate experience.
During this period, I mainly studied the Technical Specification for Steel Structure of Light-duty Houses with Portal Frames, the Manual for Steel Structure Design, the Code for Architectural Design and the Code for Structural Design. In particular, the concept of steel structure design has risen from a preliminary understanding to a higher level. In recent months, I have learned to improve the engineering quantity, quote the engineering quantity and design the gantry. By doing these works, I gradually improved my understanding of the design of light steel structure houses, and the connection and design of various components were more comprehensive, economical and reasonable. During this period, I exercised my patience by handling qualification upgrading documents and sorting out simple materials, and realized the importance of being serious, responsible and careful in doing any work, handling the relationship between colleagues and contacting all departments of the group.
Through continuous study and practice, using the theoretical knowledge learned, I gradually improve my professional skills, understand the core of design work, and actively respond to and advocate the corporate reputation spirit of "one heart, one strength" in line with the corporate slogan of * Group, so as to make more contributions to the development of design institutes.
Two, strengthen their own learning, improve the level of professional knowledge
Through the internship in recent months, I realize that my knowledge, ability and experience are still lacking, and I can't take it lightly in my work and study. I should devote more time to study, learn from books, learn from leaders around me, learn from colleagues and feel that I have made progress. Through continuous study and accumulation, I have gained some design experience, can treat all tasks with a correct attitude, love my work and try to implement it in practical work. Actively improve their professional quality, strive for the initiative in work, have a strong sense of professionalism and responsibility, and strive to improve work efficiency and quality.
Three. Existing problems and future efforts
Over the past few months, I have been able to devote myself to my work, and I am not afraid of hardship. I have made some achievements, but there are also some problems and shortcomings, mainly in the following aspects:
First, I have just entered the society and started to work, and I have insufficient experience, especially the design work is hard work. I want to study and practice in my work, think more, look at the drawings carefully, understand and understand, and be familiar with the design specifications;
Second, sometimes work is lazy and not serious enough, and work efficiency needs to be improved;
Third, my theoretical level, professional knowledge and work experience are still lacking, so I should study and practice harder.
In my future work and study, I am determined to seriously improve my professional knowledge and strengthen my sense of responsibility, and contribute to the rapid development of design institutes and the leap-forward development of the company's economy. I think I should try to do:
First, strengthen study and broaden knowledge. Study hard on professional knowledge and related experience, and consult experienced people such as leaders and colleagues. Strengthen the understanding of the development context and trend of steel structure design, strengthen the understanding and study of the surrounding environment and the development of the same industry, and know your own advantages and disadvantages;
Second, in line with the principle of seeking truth from facts, actively do your own job without delay;
Third, abide by the company's internal rules and regulations, safeguard the company's interests, actively create higher value for the company, and strive to achieve greater work results.
In line with the corporate slogan of "advocating perfection, pursuing Excellence, striving for perfection and sparing no effort" of Wan Sida Group, we adhere to and advocate the corporate reputation spirit of "one family, one mind and one mind", and live up to the care and help of company leaders, the strong support and help of colleagues, strengthen study and make more contributions to the development of the Group.
20 19 model essay on personal work of electric welding (5)
In XX, there were 2 managers and 85 welders in the welding control room of the production department. As the largest cooperation department of the production department, they are mainly responsible for product welding, technical support for workshop welding, welder management and cooperation with other departments of the company to complete related work. Under the correct guidance of the leaders, the welding control room successfully completed all the production tasks set by the company this year, especially in the manufacturing process of structural modules and cv, and cooperated with the product workshop to overfulfil the welding tasks, making due efforts to achieve the goal of relying on project nodes. At the same time, as an independent department, the welding room has made great progress in improving work quality, team building, machine management, 6s improvement and many other aspects. The work of this chamber is described as follows:
I. Overall Completion of Quality and Safety
1. Improvement of security system
According to the company's arrangement, the welding control room revised Hazard Analysis, Assessment and Analysis of Workshop Environmental Factors and Safety Emergency Plan this year, and newly compiled system documents such as Analysis and Preventive Measures for Hazardous Factors in Welding Operation and Safety Self-assessment. At the beginning of the year, all welders in the welding room signed a letter of responsibility for safety target management and a letter of commitment for personal safety, and the responsibility for safety management was implemented layer by layer.
2. Safety profile
There are many difficulties in the safety management of welding room, such as many people, many independent jobs, large distribution area and high risk factor of operation itself. However, the room has educated individual welders through publicity and training, and achieved good results. This year, the overall safety of the welding room was completed well, but due to improper use of tools and personal protective equipment, a serious injury accident occurred.
There are accidental factors in the accident, but the welding room has made a careful analysis from the aspects of system construction, responsibility implementation, process implementation and strengthening training to prevent similar accidents from happening again. After this incident, all welders attached great importance to safety work and deeply realized the important role of safety, and all employees took the initiative to participate in safety management. The welding room has also organized equipment operation training for many times.
XX has further improved the training of workshop level 2 and team level 3, and intensified the daily inspection. Part-time safety officers in the workshop insist on keeping daily safety inspection diaries, submit indoor hidden dangers investigation every week, submit safety quality management reports every month, and actively organize welders to participate in safety knowledge contests, fire drills and other activities of the company.
This year, the welding room organized a number of special safety trainings, such as polishing machine operation, traffic safety, fire prevention and typhoon prevention. , played a very good role, so that employees further mastered the safety knowledge.
3. Completion of work quality
In XX years, the welding quality of each workshop was well completed, and the one-time qualified rate of welders was improved. At the same time, the qualified rate of one-time submission of products has been greatly improved, which has been well received by owners and supervisors.
This year, three vehicles 1 NCR were designed for the welding workshop, of which three vehicles were management details loopholes and all of them have been rectified. 1 NCR misallocated welders, resulting in qualification exceeding the limit, which is a human error. Generally speaking, the welding quality in XX years has been greatly improved compared with last year, and there is no unqualified welding quality in the workshop and the need for on-site rework due to ncr.
In XX, the company added many products with great difficulty in welding, such as cv cofferdam, ihp shielding, nickel-based alloy welding, class III materials in equipment modules, etc. Coupled with the increase of pipeline welding, the requirements for welder skills are much higher than before. This room analyzes the personal characteristics of welders in detail, overcomes many difficulties, strengthens the internal self-training of welders, and formulates a reasonable external training plan. , which ensures the gradual improvement of welder's skills and the high first-time qualification rate of welding products.
Second, achievements and shortcomings
1, work highlights
In XX years, the workload of the welding room was full. In the case of limited number of qualified haf welders, the welding room actively coordinates various resources. When the construction period is tight, especially for sm 1# and hy 1# nuclear Q modules, embedded parts of No.24 Company, trial welding of cv cofferdam and cap 1400 water distribution welding specimens, there are both managers and welders.
In XX, the welding room was equipped with welder's tool room. Through 6s management, the usage of welding accessories was reduced by more than 30% this year, which effectively saved the cost.
Welding room technicians are more familiar with asme, aws, haf and other standards, deeply understand the relationship between material coverage and job replacement under various standards, reduce the entrusted examination items and save training costs.
There are only two technicians and managers in the welding room, who are responsible for the management and coordination of welding work in each workshop. The workload is heavy and there are many affairs, and there are many jobs in part-time departments. Through training and study, their management and business abilities have been gradually improved, and all the tasks of the company have been successfully completed.
2. Achievements and honors
The welder class won the first place in the tug-of-war competition organized by the company in April; On the May 4th Youth Day, the welder team was rated as "National Outstanding Young Pioneers of Nuclear Power"; The welder class won the first place in the July 1st Red Song Chorus Competition; Two people won prizes in Haiyang welder competition, and eight people successively won company-level honors.
3. Shortcomings in the work
The safety awareness of workshop employees needs to be further strengthened, and the rational use of tools and equipment and the correct wearing of labor protection articles need to be implemented through further training;
The one-time pass rate of welder examination needs to be further improved. In the next step, we will work with the welding training center and the human resources department to formulate relevant examination reward and punishment methods and incentive policies, and make unified planning to mobilize the welder's examination enthusiasm.
The welder skill level of the company needs to be further strengthened to meet the needs of more nuclear-grade pipelines, special material welding and special process welding in the future;
Through ncr and car several times this year, we can also see that there are some loopholes in workshop management and welding process control, and the management and professional ability of welding engineers need to be further strengthened. With the increase of the number of welders next year, managers should master more management and business knowledge and further enrich themselves through study, so as to manage this team well. The manager's consciousness directly determines the level of the team brought out.
Third, the welding process control and personnel management
1, workshop welding process control
This year, the welding room has fully learned the profound lessons of XX shearing stud incident and the qualification of inserting plate welder, and made the welding process control in the workshop the top priority of the work. In welding material control, about 20,000 release documents were approved and about 5,000 welding process records were reviewed. The welder qualification, furnace batch number, use direction and other key audits ensure the correctness of welding source data.
The welding room requires all welders to achieve 100% in the actual welding process in the following four aspects: pre-welding equipment sampling rate 100%, process document execution rate 100%, post-welding self-inspection rate 100%, and intra-team mutual inspection rate 100%. This year, so are all the members of the welder's class. Welders gradually realize the necessity of "doing it right once" and integrate the concept of "zero defect" into their daily work. According to the standard requirements, each team has achieved "no manufacturing, no acceptance and no leakage of unqualified products".
In order to ensure the one-time qualification rate of welding room products, it has become an established habit to ask the squad leader to conduct self-inspection and "quality finding fault" between teams before formal acceptance.
2. Equipment and tool management
In order to ensure the correct use and maintenance of welding equipment on schedule, this year, the welding room compiled the Maintenance Rules for Welding Equipment, Operation Rules for Welding Equipment and Operation Rules for Polishing Machine, and issued them to the team for implementation. At the same time, the welding room sorted out all the welding equipment in the workshop, and re-divided the areas and responsible persons according to the actual users of the existing equipment, which played a vital role in implementing the equipment maintenance system.
In addition, the welding room updated the account by sorting out the covered electrode heat preservation barrels, determined the supervisor, and compiled the Regulations on the Use of covered electrode Heat Preservation Barrels for Welders' Class, which ensured the correct use and maintenance of tools.
3, welder training and qualification management
Due to the substantial increase in new materials and new processes this year, the welder examination work has also increased compared with previous years. Based on the principle of maximizing output and minimizing control cost, this year * * * issued 62 welding training commissions to the welding training center, which increased 33 aws welder qualifications, 104 ASME qualifications, 192 haf qualifications and 32 gb qualifications compared with last year. These new qualifications ensure the timely welding of products.
By the end of this year, the company has 85 welders with aws qualification, with a total of 478 items; There are 48 welders with asme qualification, accounting for 242 items; Total number of welders with haf qualification: 4 1, of which 321; There are 7 welders with gb pressure vessel qualification, including 32 items. The qualification items have increased greatly, which makes it more difficult for us to submit the monthly report of welder activities, three-month continuous operation records and six-month continuous operation records. In particular, the Haf qualification certificate belongs to the out-of-town examination, and each qualification is valid for half a year. Due to the influence of the company's product construction period, technical conditions, materials and other factors, some qualification certificates failed to start as scheduled after half a year's assessment, or the welder could not carry out the welding work of the assessment project due to process changes, which made it more difficult to postpone the certificate. However, through the active coordination of XX, our office overcame various difficulties and submitted various reports on welder activities on time.
4.6s management
Through further publicity, the concept of 6s has been deeply instilled into the working concept of the team. At the same time, in many inspections, the 6s evaluation results of the welder team are in the forefront and gradually become a part of the behavior.
The 6s work of XX welder class is rich in forms and contents. Make the welding cable regular by making the welding cable bracket; The whole support of argon arc welding machine of milling machine is made, and the synchronous movement of equipment and cylinder is realized. The support of Lincoln welding machine realizes the flexible movement of heavy equipment. The welding machine tool cabinet to be manufactured will realize common welding machine equipment such as covered electrode heat preservation barrel, covered electrode head barrel and grinder. To further realize the fixed management of the workshop.
Related articles:
1.20 19 five personal work summaries.
accomplish