Hangzhou-Shaoxing Intercity Rail Transit Line Hangzhou-Shaoxing Intercity Rail Transit, now called Shaoxing Metro 1 Line Ke Qiao Section, is the construction content of "Hangzhou-Shaoxing Integration Cooperation Pioneer Zone".
The line starts from the terminal of Hangzhou Metro Line 5 in the west, enters Yang Xun Bridge through Xiaoshan New Street and Ya 'an in an underground way, enters Qian Qing in an elevated way after passing through Niutoushan Tunnel, passes through Qianqing Town in parallel along the south side of Hangzhou-Ningbo high-speed railway, turns underground in front of Xiaozuo Road along Qunxian Road, enters Keqiao City, and finally reaches Yang Di Road Station (which will be connected with Shaoxing Metro 1 line next year).
The total length of the line is 20.3km, including Keqiao District 15.35km, Xiaoshan District 4.95km, underground line 9.87km, overhead line 7.34km, transition section 1.06km, and tunnel crossing Niutoushan 2.03km.
Hangshao Line * * has a total of stations 10, including 6 underground stations and 4 elevated stations. The train adopts B-type drum train, which, like Hangzhou Metro 1 Line, is dominated by red. The total length of the train is about 120 meters, the widest part of the car body is 2.88 meters, and the highest running speed is 100 kilometers. The whole journey takes about 27 minutes. It is expected to be put into trial operation at the end of June this year.
Opening time: Ke Qiao section of Zhejiang Shaoxing Metro 1 (Hangzhou-Shaoxing Intercity Railway) is the first subway line in Shaoxing, which will be put into initial operation on June 30th. The line starts from Guniangqiao Station in Xiaoshan District, Hangzhou in the west and ends at China Textile City Station in Keqiao District, Shaoxing in the east, with a total length of 20.3 kilometers and a station of 10.
Schematic diagram of Shaoxing Metro 1 Line
Ke Qiao bus supporting subway line.
In order to further promote the integrated development of rail transit and ground bus, give full play to the flexibility of ground bus setting, and meet the travel needs of the masses, after many field trips, on-site investigations and data analysis, the urban bus has formulated the bus supporting scheme for Ke Qiao section of Metro 1 Line, and plans to optimize and adjust the 1 1 bus lines synchronously with the opening of the subway, and postpone the last shift time of seven bus lines, and at the same time, combine the passenger flow after the operation of the subway.
Fare-related information Shaoxing Metro and Hangzhou Metro have a unified fare and ticket system. Tickets, cards and codes are interconnected, and one-vote system is used to ride, and the payment area is transferred. Fares are as follows:
Ticket system and charging method
The ticket price of Shaoxing Rail Transit and Hangzhou Metro adopts the one-vote system, that is, passengers check tickets in the backstage of the system at Girl Bridge Station once, and then re-charge from Girl Bridge Station to enter Hangzhou Metro or Shaoxing Rail Transit.
Preferential policies for special groups
1. Retired cadres, soldiers, disabled soldiers, national comprehensive fire rescue personnel, people's police disabled in the line of duty, survivors of martyrs, survivors of soldiers who died in the line of duty, national model workers, winners of honorary certificates of voluntary blood donation in Zhejiang Province, severely disabled people with household registration in Shaoxing, Hangzhou and Haining, and slightly disabled people.
2.70 years old or above, during the peak hours of legal working days (7: 00-8: 30; 17:00- 18:30), enjoy a 50% discount on the fare, and take the bus for free the rest of the time.
Older people aged 3.60-69 enjoy a 50% discount on ticket prices.
4. Citizens under18 enjoy a 50% discount on the ticket price.
5. Adult passengers can bring children under the height of 1.3 meters free of charge; Children under the height of 1.3m are not allowed to ride alone.
The above preferential policies are formulated by Shaoxing Rail Group and released to the public in advance.
Fare preferential measures
Shaoxing Rail Group shall, in accordance with the requirements of the competent authorities of the industry, introduce preferential measures such as discounts on ordinary stored-value cards and preferential rides on subway buses. Encourage the introduction of flexible and differentiated preferential air tickets in combination with market demand and operating conditions, and give appropriate discounts to passengers who use non-cash payment methods such as QR codes and bank cards.
The above-mentioned passenger transport prices and preferential policies and measures shall be implemented as of the day when Shaoxing Rail Transit 1 Line Ke Qiao Section is put into operation.
Summary of volunteer activities for epidemic prevention and control 1
In the full work every day, the three-day vol