Current location - Quotes Website - Collection of slogans - Minutes of safety inspection meeting
Minutes of safety inspection meeting
Time: 20 15 12 February 12

Venue: conference room on the third floor

Moderator: Wang Kai.

Participants: Zhang, members of the Safety Committee of the Head Office, Wang You, Long Yuan Company, Zhang Xu and Xin Huang. Recorder: Xin Huang.

Meeting contents:

The head of the assessment team of the Safety Committee of the head office first issued the contents and scoring standards of the Longjiang traffic inspection, carefully inspected the company's safety production work, and put forward rectification opinions on the existing problems.

Wang Kai, the general manager, gave a detailed report to the members of the Safety Committee of the Head Office on the work safety in 20 15. Wang Kai, Chairman of Long Yuan Company, explained in detail the implementation of the company's annual production safety deployment. Regarding the two problems mentioned in the report, the company has no doorman security, and the vehicle has a long service life, which has potential safety hazards. Zhang, a member of the evaluation team of the Safety Committee, said that the arrival of security personnel is an important part of the implementation of the company's security work. Security personnel must be set up as soon as possible, and relevant personnel should be assessed, and relevant systems should be established, requiring the company to implement them as soon as possible to eliminate potential safety hazards. Regarding the problem that vehicles are old and the safety of vehicles cannot be guaranteed, Zhang asked the company to strengthen the training of drivers' driving skills, establish a sense of safe driving and strictly abide by traffic laws and regulations.

Needle policy. The company's cars are old and difficult to maintain. However, it is difficult to solve the problem because vehicle management is not within the leadership of the safety Committee. Zhang asked to implement the safety documents of the head office, sign in at the safety meeting, make preparations before the meeting and prepare the speech. Write the minutes of the meeting in time after the meeting, deeply understand the hidden problems raised in the meeting content, and solve them reasonably. At the meeting, Zhang emphasized the construction safety of the project under construction in the Anda service area of Harbin-Dalian Expressway, and demanded that the policy of "safety first, prevention first" should always be implemented, safety assurance responsibility letters should be signed step by step, and a strict accountability system for safety production should be established. Full-time security officers should be set up on the construction site. And set up safety warning signs and safety slogans in key parts.

Zhang Jingang, a member of the assessment team of the Safety Committee, requested to do a good job in the distribution and management of safety documents of the superior units to ensure that the documents are transferred, executed and filed correctly. In particular, the safety information on the construction site should be strictly implemented in accordance with the standards. After the implementation of the security work, take photos at the first time, do a good job in the management of electronic files, so that it is well-founded and implemented to those responsible. Zhang Jingang asked the company drivers to strictly abide by the safe driving rules and do a good job in driver training. Drivers must abide by the law, stop according to the rules, walk according to the line and be punished according to the rules.

Wang You, a member of the assessment team of the Safety Committee, asked the company to do a good job in employee safety training, and send safety officers to the advanced units for training and study on a regular basis.

General Manager Wang Kai said that he would pay close attention to the opinions put forward by the evaluation team of the Head Office's Security Committee and make a concluding speech. Wang Kai emphasized that "there is no trivial matter in safety management, and safety responsibilities should be re-implemented" is the company's consistent policy on safety work, and the company should learn from the safety management of the head office.

Management experience has brought safety management to a new level. Strive to create a better safe production environment.

Heilongjiang communications Long Yuan investment co., ltd

20 15 12 12

Minutes of Safety Inspection Meeting [Chapter II]

Documents of Project Supervision Department of Nanguang Luolongwan Phase I Project

No.: LLW-YQ-XTH-0 15

Nanguang Luolongwan Phase I Project

Conference theme: Safety and Civilization Inspection Summary Meeting

Venue: Shunjie Conference Room

Meeting time: March 22, 2005, 2065438+ 2:00 pm.

Participating units and personnel:

Wuxi Treasure Island Real Estate Co., Ltd.: Zhang Hao and Wang Hongyu.

Shanghai Tianyou Engineering Consulting Co., Ltd.: Zhou, Zhou Zhizong, Zhou Guangsheng, Jiangsu Shuntong Construction Group Co., Ltd.:, Cai Yunfeng.

Zhejiang Shunjie Construction Group Co., Ltd.: Xu Lierong, Gu

Moderator: Zhou

Meeting contents:

Moderator:

In order to realize the safety during the construction of the first phase project of Luosiwan in Nanguang.

Accident, the construction site safety civilization conforms to the relevant safety inspection standards, organize a safety civilization inspection on a regular basis every month, summarize the problems existing in the site after the inspection, and implement the rectification responsible person to complete the rectification within 3 days. If the rectification is not completed on time, it shall be punished in accordance with the punishment provisions ordered in the safety and civilization inspection system. On-site problems:

Shuntong:

1 room and 1# room have no safety hook device and grounding pile; 2. Oxygen bottles and acetylene bottles are piled up in the south of Phase I 1 1# room;

3. The cables at the entrance of the distribution room are messy and there are no protective measures;

Shunjie:

1, 13# building main side three-level distribution box is mixed with 220 volts and 380 volts;

2. The tower crane in room 213 # has no special electric box, and the tower crane commander leaves his post without authorization;

3. There is no fire extinguisher in the wooden shed, and the grounding is not standardized;

4. Next to the secondary distribution box on the south side of the clubhouse, six connectors are connected to the cable about 50 meters. Requirements put forward by the Owner:

1, the distribution boxes at all levels on site are arranged according to the construction temporary electricity utilization scheme;

2. Report the tower crane group hoisting scheme;

3. Pull safety and civilized slogans on site and set up safety warning signs;

See the Safety Civilization Checklist for details of the person responsible for rectification and the completion time of rectification.

Shanghai tianyou engineering consulting co., ltd

Nanguang Luo longwan phase I project supervision projects department

2065438+March 22, 2005

Minutes of Safety Inspection Meeting [Chapter III]

On August 6th, 20 15, Yongxin Jiayuan Project Department of Hebei Construction Engineering Group held a safety inspection mobilization meeting. The meeting was presided over by Mei Deqing, and all managers of the project department attended the meeting. The meeting carefully studied the requirements of the safety inspection activities of the Construction Bureau, formulated the implementation plan of the safety inspection activities of the project department, and mobilized all the staff. The meeting request is summarized as follows:

I. Mei Deqing, manager of the project department, made clear the requirements of this activity:

1 The management personnel at all levels in the project department have a clear division of labor;

2. Do a good job in the investigation and rectification of potential safety hazards;

3 do a good job in collecting and reporting activity information.

4. Strict accountability: for those who are poorly implemented and have poor safety in safety inspection activities,

Do not leave any dead ends in the investigation of all hidden dangers, and the teams and individuals who find that the problems are not rectified in time and thoroughly will be dealt with seriously.

Second, make the project department safety inspection activities leading group:

Team leader: Mei Deqing

Deputy team leader:

Members:

Third, the inspection requirements

The project department should attach great importance to it and act quickly, with the project manager taking the lead, and immediately put into the safety inspection activities to ensure the safety and stability of Yongxin Jiayuan project construction. 1

Each team leader must sink to the front line, keep a close eye on the site, and carry out safety prevention publicity and safety monitoring during the operation to ensure the safety and stability of the project. The management personnel of the project department strictly implement the step-by-step safety responsibility system. The communication of safety information should be strengthened among the management personnel of each team in the project department, so that any potential safety hazard must be communicated with the project department in time, regardless of whether the team is involved or not. To do a good job in the investigation and rectification of potential safety hazards, we should pay attention to practical results, grasp the key points and keys of safety work, sort out the problems clearly, put the responsibility on people and rectify within a time limit. Teams that fail to implement the safety and quality inspection activities, leave no dead ends in the investigation of potential safety hazards, and find that the problems are not rectified in time and thoroughly, the team project department will give serious treatment. In the safety inspection activities, the project department will give economic penalties to teams and individuals who are not in place and irresponsible. The project department personnel deduct the bonus at the end of the year. Do a good job in the dynamic account of personnel in various departments during the inspection. Do a good job in dynamic accounting of mechanical equipment. Improve the safety and quality awareness of technicians and workers in various positions. Do a good job in the investigation of potential safety hazards during this activity and make emergency preparations such as fire prevention and wind prevention.

Four. Meeting summary

Mei Deqing, the project manager, summarized at the mobilization meeting of safety inspection activities, which was required by Qinhuangdao Construction Bureau and Hebei Construction Engineering Group Company. Through this inspection activity, the safety awareness of the project department and the construction team was enhanced and the work level was improved. Participants in the project department also said that they fully realize the importance of safety inspection, must sum up better and more reasonable safety management experience and methods during the inspection, go all out to carry out this safety inspection activity, and adhere to this strict requirement for a long time through this activity.

2

Minutes of Safety Inspection Meeting [Chapter IV]

Time: 20 1 1 August/5/year.

Venue: Maying Coal Mine Meeting Room

Chairman: Yan Wen

Participation: Sun Zhifeng, Kan, Luo Shengshan, Jia Hui.

Peng Weimin Jiang Xingguo Han Zhao Cui Hongzhi Lai

There are 27 supervisors, deputy supervisors and managers above the team level.

Conference theme: Mobilization meeting of "100-day safety inspection"

Meeting contents:

1. Mine manager Wang conveyed the voice of Shanzheng Coal. 201124 (Notice on Printing and Distributing the Work Plan for Carrying out Hundred-Day Inspection of Coal Mine Safety in Shanyin County), the meeting decided that the safety supervision station would be responsible for organizing, guiding and urging all units to carry out the "Hundred-Day Inspection of Safety in Production" and organizing the implementation of this activity.

Second, the meeting strict requirements:

1, strengthen leadership, in-depth mobilization and careful deployment. The heads of various departments personally went into battle, participated in the formulation of practical work plans, widely mobilized all forces, took effective measures, and actively carried out the investigation and rectification of various hidden dangers.

1

2, safety supervision station to strengthen publicity, improve the safety awareness of workers; It is necessary to widely mobilize employees to participate in safety production work such as hidden dangers investigation and rectification, and ensure that the activities are effective.

3, to clear responsibilities, strict standards, focus. All relevant departments and teams should position themselves according to their functions to ensure the smooth development of this activity.

4, increase production safety inspection. All units should work hard and continue to do a good job in safety inspection in strict accordance with the requirements of superiors. All kinds of potential safety hazards should be rectified immediately, and production should be stopped for rectification when necessary. According to the assessment content of the "anti-three violations" activities in July, the "Investigation and Management System of Safety Production Hidden Dangers in Maying Coal Mine" was strictly implemented, and the "closed" management of safety hidden dangers was implemented to achieve "five implementations" and eliminate hidden dangers in the bud.

5. Continue to seriously implement Jin 20 1 129, Shuo 20133, Jin 'an Power Generation 201/kloc-0, Shuo 20 165438.

6. Finally, I hope that through our joint efforts, we can do a good job in the inspection of this activity, and take it as a new starting point for safety production, pay close attention to the implementation of the safety production work system and daily management, promote the establishment and improvement of the long-term mechanism for safety production, and completely reverse the passive state of safety production management.

Keywords: activity meeting summary

Report to the "five-person team" of the Coal Management Bureau and send it to the mine leaders, departments and teams of the project department.

Maying Coal Mine Safety Supervision Station was released on 20th11August15th.