Dog days activity plan 1 With the weather getting hotter, the continuous hot and humid weather has a great impact on the physical and mental health of front-line production employees, which is particularly easy to make people physically and mentally exhausted, thus increasing the probability of accidents. In addition, the labor intensity of the production line is high and the brain drain is serious, which puts forward higher requirements for heatstroke prevention and cooling. Therefore, we must minimize the impact of heat and high temperature on front-line production personnel and reduce the occurrence of summer accidents.
Combined with the actual situation of the production line, in order to reduce the accident rate and employee turnover rate, the following heatstroke prevention and cooling schemes are formulated:
First, the daily diet:
(1) It is suggested that the meals in the canteen should be light, nutritious and digestible, and more cool and refreshing foods should be prepared, such as cold noodles, cold dishes and bean jelly.
(2) Hot weather will increase employees' physical consumption. Therefore, it is suggested that the canteen should appropriately increase products such as ginger, vinegar, bitter gourd and garlic to strengthen the spleen and stomach, and reduce greasy and spicy foods in the meals to enhance the appetite of employees;
(3) Try to provide cool drinks, such as tomato soup and mung bean soup, and recommend kelp and pumpkin soup;
(4) When preparing meals, prepare fresh and juicy foods, such as cucumbers, tomatoes, beans and bitter gourd.
Second, the benefits of high temperature:
(1) Provide cold fruits such as watermelons and tomatoes to front-line production personnel on a regular basis to relieve high temperature pressure.
(2) Purchase items such as Radix Puerariae, Flos Lonicerae, and mung bean, and provide drinks such as chrysanthemum tea, mung bean soup, and light salt boiled water regularly every day to reduce the fire, so as to ensure the supply of first-line drinking water for production.
Third, preventive measures:
(1) According to the weather conditions at work, the front-line production personnel can be arranged to have a moderate rest;
(2) Strengthen the management of dormitory, do a good job in dormitory ventilation, do a good job in dormitory environmental sanitation, regularly disinfect and prevent mosquitoes, and do a good job in comprehensive management of environmental sanitation;
(three) strictly grasp the canteen hygiene, strictly implement the disinfection system, do a good job in canteen food hygiene, to prevent food poisoning;
(4) Prepare some commonly used medicines for heatstroke prevention and cooling, such as Ren Dan, Huoxiang Zhengqi Water, 10 water drop, essential oil, etc. , and put it into the warehouse according to the demand to be collected by the workshop director.
(five) to establish a medical rescue agreement with the local hospital as a medical rescue guarantee; The company reserves drivers on standby to deal with accidents caused by high temperature weather in time;
Fourth, do a good job in the ideological work of employees:
(1) Make heatstroke prevention and cooling posters and post them all over the company to promote heatstroke prevention and cooling. It is planned to make posters and banners, print A4 paper and post them in workshops, dormitories and other factories. Estimated cost 200 yuan;
(2) It is suggested to invite company leaders to visit staff workshops and dormitories in the evening;
(3) During the employee's work, the workshop director and team leader should do a good job of ideological guidance, and the employee relations Commissioner should regularly understand the employee's thoughts, master the employee's ideological trends, and do a good job in dormitory visits.
Activity plan for dog days 2 With the arrival of summer, the Meteorological Observatory issued yellow high temperature warning signals for many times. When the highest temperature is greater than or equal to 35 degrees Celsius, it is defined as "high temperature day", and the "high temperature day" that lasts for more than 5 days is called "continuous high temperature". In order to protect workers' health, continuously improve working conditions and improve labor productivity, the company takes practical and effective measures to prevent heatstroke and cool down.
I. Health measures
1, the supply of cool drinks, for high temperature and outdoor workers, should ensure the supply of enough cool drinks that meet the hygiene standards.
2, to strictly implement the working hours system, reasonable arrangement of work and rest time, to ensure that high temperature workers have enough rest time, strictly control overtime.
3, do a good job in preparation for heatstroke drugs and heatstroke first aid, and visit the workshop regularly.
Second, the technical measures
1. For heatstroke prevention and cooling in high-temperature workshops, natural ventilation should be adopted first. For single-span and double-span workshops in hot areas, natural ventilation with flow as the main factor should be adopted as far as possible.
2. The installed axial flow fan in the workshop is reasonably reloaded in the form of convection ventilation, which effectively reduces the hot air circulation in the workshop.
3. Transform some windows, rationally distribute the placement positions of base paper and finished paper, and make the whole workshop have sufficient air circulation.
4. In order to reduce the transfer of solar radiation heat to the workshop, water spraying and spraying devices can be installed on the iron shed, insulation layer and ventilated roof around the workshop, which can effectively reduce the temperature of outdoor direct sunlight and better exhaust the hot air in the workshop.
5. Strictly monitor high-temperature equipment to prevent steam leakage caused by damage of parts and components, thus affecting the temperature rise of the workshop.
Third, organizational measures
1. In the hot season, in order to ensure that workers have a full rest, try to streamline meetings, have a rest and avoid working overtime.
2. In summer, we should adjust the labor organization as much as possible according to the production process, adopt the method of shift work, shorten the continuous working time, and strengthen the rotation rest at work.
3, to deal with workers to strengthen the publicity and education of heatstroke prevention and first aid.
Dog days activity plan 3 1 aims at:
In the summer work process, due to many outdoor working environments, the distribution area of personnel work is complex and changeable; The influence of high labor intensity has brought a lot of inconvenience to work. In order to protect the legitimate rights and interests of employees, life safety and property safety, and create a safe and comfortable environment for employees.
2. Scope of application:
This system is applicable to xx Project Department of xx Power Construction Company.
3. Specific provisions:
(1) Seriously implement the responsibility system for heatstroke prevention and cooling.
Relevant units should conscientiously implement a series of requirements for heatstroke prevention and cooling at the construction site, strengthen the organization and leadership of heatstroke prevention and cooling with a highly responsible attitude towards the life and health of frontline construction personnel, improve and implement the responsibility system, formulate emergency plans, and pay close attention to the implementation of preventive measures to prevent workers from heatstroke and various production safety accidents caused by high temperature weather.
(2) Reasonable arrangement of work and rest time.
Pay close attention to the weather forecast of high temperature weather. Meteorology defines the maximum daily temperature as "high temperature day" when it is greater than or equal to 35 degrees Celsius, and the "high temperature day" that lasts for more than 5 days is called "continuous high temperature". Strictly implement the measures of "grasping at both ends and intermittently" to avoid high temperature, appropriately adjust the labor rest system for high temperature operation in summer, reduce labor intensity, strictly control outdoor operation time, avoid operation during high temperature period, and ensure the health and life safety of workers. In principle, when the temperature exceeds 37℃, outdoor operation is strictly prohibited from1:00 to 15: 00.
(3) Strengthen the rotation rest at work.
In summer, according to the technological process of construction, the labor organization should be adjusted as much as possible, and frequent shifts should be adopted to shorten the continuous operation time and strengthen the rotation rest at work. Strengthen on-site inspections, increase the publicity of heatstroke prevention and cooling knowledge and heatstroke first aid knowledge, and improve the safety awareness of all staff.
(4) Ensure that there is enough drinking water supply at the site.
Adequate drinking water, beverages, tea and various soups that meet the hygiene requirements should be supplied on site to effectively prevent heatstroke and avoid heatstroke.
(5) Implement heatstroke prevention and cooling items.
We should pay close attention to the front-line construction workers who insist on construction in hot weather, strengthen the propaganda of heatstroke prevention and cooling knowledge, require construction workers to carry heatstroke prevention drugs with them, such as Ren Dan, cooling oil and wind oil essence, and implement heatstroke prevention and cooling items for each worker.
(6) Actively improve the production and living environment of the construction site.
We should conscientiously implement the Regulations on the Management of Construction Sites, actively take measures to strengthen ventilation and cooling, ensure that temporary facilities such as dormitories, canteens, toilets and showers for construction workers meet the needs of heatstroke prevention and cooling, and provide cool drinks and commonly used heatstroke prevention drugs for construction workers. Electric fans must be installed in the dormitory and canteen of the construction site, and units with conditions should install air conditioners in the dormitory.
(seven) do a good job in health and epidemic prevention.
It is necessary to do a good job in health and epidemic prevention in the construction site and living quarters, strengthen the sanitary management of drinking water and food, strictly implement the food hygiene system, and avoid poisoning incidents caused by food deterioration; Strengthen the monitoring of summer-prone diseases. In case of legal infectious diseases and food poisoning, the on-site staff shall report to the relevant competent departments in time.
(8) Do a good job of fire prevention in summer.
In view of the fact that summer is hot, dry and prone to fire accidents, further strengthen fire prevention measures and regularly check flammable places such as power distribution room, warehouse and paint room. When problems are found, deal with them immediately, and equip them with fire-fighting equipment as required.
Dog days activity plan 4 I. Purpose:
In midsummer, in order to avoid safety accidents caused by high temperature and summer heat, ensure the health of workers, continuously improve working conditions, and prevent production safety accidents such as heatstroke caused by high temperature weather. All workshops and departments should attach great importance to it, take measures, highlight key points, effectively strengthen the supervision and management of production safety, and prevent all kinds of accidents. Safety production measures during high temperature in summer are as follows:
Second, the establishment of heatstroke prevention and cooling work leading group:
Team leader:
Deputy team leader:
Members:
The office of the leading group is located in the Safety and Environmental Protection Department, and the director is xxx.
Office phone number 7346
Third, the specific measures for heatstroke prevention and cooling:
(a), earnestly implement the responsibility system for heatstroke prevention and cooling. All workshops and departments should conscientiously implement the specific requirements for heatstroke prevention and cooling at the production site, strengthen the organization and leadership of heatstroke prevention and cooling with a highly responsible attitude towards the life and health of front-line employees, improve and implement the responsibility system, formulate emergency plans, and pay close attention to the implementation of preventive measures to prevent workers from heatstroke and various production safety accidents caused by high temperature weather.
(2) Comprehensively organize and carry out summer safety inspection. It is necessary to effectively strengthen production safety, take the prevention of various accidents caused by natural disasters such as high temperature and strong convective weather in summer as the primary task, comprehensively organize various professional departments and workshops to conduct seasonal investigations and do a good job in implementation.
Formulate preventive measures to curb accidents during high temperature.
(3) Strengthen the operation safety during maintenance. It is necessary to highlight the hidden dangers of key projects, especially the supervision of electric and gas welding operations, limited space and aerial work, and strictly implement the safety precautions before maintenance. Personnel involved in maintenance shall strictly abide by the safety measures in the maintenance safety and environmental protection scheme. Hold a pre-inspection meeting, and conduct "five handover" to the personnel participating in the inspection, that is, hand over the construction tasks, safety measures, safety inspection methods, safety precautions and abide by relevant safety regulations. The guardian must be on-site supervision from beginning to end, and must not leave his post without leave, carefully check the construction site and implement safety technical measures.
(4) Strengthen the safety control of hazardous chemicals. In view of the volatile, leakage and deflagration of hazardous chemicals caused by temperature rise, it is necessary to strengthen the monitoring of major hazard sources of hazardous chemicals, do a good job in explosion prevention, lightning protection and leakage prevention of hazardous chemicals devices and pipelines, conscientiously implement measures such as ventilation, cooling, waterproof, moisture-proof, fire prevention, explosion prevention and lightning protection in hazardous chemicals production and storage places, and ensure that warehouses and pump rooms are ventilated at any time, and storage tanks are in good condition; The production and storage of hazardous chemicals should be "three inspections a day" and "three determinations" (that is, quantitative storage, regular temperature measurement and regular ventilation); The loading and unloading platform should be prepared for lightning protection, anti-static, emergency rescue and accident treatment, and the loading speed should be strictly controlled during loading to prevent electrostatic accumulation. In order to avoid high temperature weather, loading and unloading operations of benzene hydrogenation storage and transportation, tar storage and transportation and tar modified asphalt loading and unloading platforms are prohibited from 1 1: 00 to 15:00.
(5) Strengthen rotation and rest at work. According to the links of operation activities, the labor organization is adjusted, and the maintenance workers adopt intermittent operation methods at the scene.
Personnel have shortened the continuous operation time and strengthened the rotation rest during work.
(6) Ensure an adequate supply of drinking water. The comprehensive office is fully responsible for the contact, collection and distribution of all kinds of heatstroke prevention and cooling supplies and drinking water, and supplies sufficient drinking water, beverages, heatstroke prevention tea and various soups to the workshop to effectively prevent heatstroke and avoid heatstroke.
(seven), the implementation of heatstroke prevention and cooling items. The Safety & Environment Department is responsible for distributing heatstroke prevention and cooling drugs in the workshop and tracking and checking the drugs used by employees. Strengthen the propaganda of heatstroke prevention and cooling knowledge, and require operators to take or apply heatstroke prevention drugs, such as Ren Dan, cooling oil and essential oil. Before operation, implement the heatstroke prevention and cooling items of each worker.
(eight), do a good job in health and epidemic prevention. It is necessary to do a good job in sanitation and epidemic prevention in the construction site and dormitory, strengthen the monitoring of drinking water and diseases prone to occur in summer, and report to the dispatching, safety and environmental protection departments in time when legal infectious diseases and food poisoning occur in the construction site. The dormitory should be clean, the room should be properly ventilated, pay attention to personal hygiene, and often wash your hands with hand sanitizer (soap) and clean water, especially after coughing or sneezing. Cover your nose and mouth with a tissue when coughing or sneezing, and then throw the tissue into the trash can. To achieve "early detection, early reporting, early isolation and early treatment", improve the epidemic prevention ability of employees and ensure personal safety.
(9), do a good job of fire prevention in summer. In view of the hot summer, dry weather and easy fire accidents, fire prevention measures have been further strengthened. The electrical instrument workshop regularly organizes special inspections on flammable places such as power distribution room and oil pump room, and immediately corrects the problems found to avoid accidents.
(ten), do a good job on duty and information submitted. All departments and workshops should carefully formulate emergency plans for heatstroke prevention, flood control, fire prevention and poisoning prevention, and make good preparations for emergency teams and emergency materials.
Get ready, arrange the duty work in high temperature and strong convective weather, report the danger and accident immediately when found, and rush to the scene for disposal at the first time to prevent the accident from expanding.
Dog days' activity plan
In order to strengthen the work of high-temperature operation and labor protection in high-temperature weather, do a good job of heatstroke prevention and cooling in summer construction site, ensure the health of workers, continuously improve working conditions, and prevent production safety accidents such as heatstroke caused by high-temperature weather. This plan is formulated in accordance with the provisions of the Occupational Disease Prevention Law of People's Republic of China (PRC), the Labor Law of People's Republic of China (PRC) and the Management Measures for Heatstroke Prevention and Cooling Measures.
Second, the scope of use
All employees and interns of Shuang Fu production plant.
Three. Definition of nouns
1) The daily maximum temperature is above 35℃ and below 37℃, which is generally high temperature weather;
2) The daily maximum temperature is above 37℃, and the weather below 40℃ is moderately hot;
3) The maximum daily temperature above 40℃ is strong and hot weather;
4) Continuous high temperature refers to "high temperature days" lasting for more than 5 days.
5) Hot weather operation refers to the operation arranged by the employer for workers in a hot natural meteorological environment in hot weather.
Fourth, the implementation time.
20xx July ~ June 20xx 10 (if the outdoor temperature continues above 36℃, the implementation date shall be postponed appropriately).
Verb (abbreviation of verb) related requirements
1) Regulatory requirements: Y.F.B.F. [20xx]No. 166.
During hot weather, the employing unit shall, according to the following provisions and the production characteristics and specific conditions, take measures such as reasonably arranging working hours, rotating operations, appropriately increasing the rest time of workers in high-temperature working environment, reducing labor intensity and reducing outdoor operations during high temperature:
The employing unit shall adjust the operation time according to the forecast temperature released by the meteorological station affiliated to the municipal competent meteorological department on the same day, except for emergency treatment due to emergency rescue and disaster relief, personal and property safety and public interests.
(1) In general high-temperature weather, the employing unit shall rest in shifts, shorten the continuous working hours of workers, and shall not arrange outdoor exposure.
Workers who work overtime every day; The employer shall earnestly do a good job in heatstroke prevention and cooling in high temperature weather, formulate and implement heatstroke prevention and cooling measures, and ensure the normal operation of heatstroke prevention and cooling equipment.
(2) In medium and high temperature weather, the employing unit shall arrange all-day outdoor work time for workers according to the documentNo. [20xx]89 of the General Administration of Safety Supervision.
Regulations, and suspend the outdoor open-air operation during the high temperature period from 12 to 16. If it is necessary to work in the open air at high temperature due to the requirements of production technology, the employer shall reasonably adjust the work and rest time and take heatstroke prevention and cooling measures.
(three) when the high temperature weather is severe, the outdoor work on that day should be stopped. If it is really necessary to work in the open air because of the production process requirements, the employer shall make reasonable adjustments.
The whole work and rest time, and take heatstroke prevention and cooling measures.
2) Site status:
(1) Because the assembly workshop is hot; During working hours, it is always sunny and not ventilated. The ceiling is a board house that absorbs heat, and the temperature can reach 50 degrees in summer. (2) The actual temperature at the assembly plant site is more than 2 degrees higher than that reported in Chongqing weather forecast. On July 9, four employees of the assembly plant suffered from heatstroke;
Cost budget of intransitive verbs:
5898 1 yuan
(1) budget for heatstroke prevention products: ¥ 1.54 million yuan.
(2) Cold drink budget: 65,438 yuan +0. 83 million yuan.
(3) Budget of cooling equipment: ¥2528 1 yuan.
1) Adjustment of high temperature operation time in summer
Remarks:
From mid-July to June at 5438+ 10, the temperature is expected to reach 35+for 65 days, and the following cooling foods are prepared for Workshop 4:
1, mung bean soup: mung bean 30 kg/day.
2, sugar 10 kg/day
3. Summer tea: 1 kg/day