Depot is one of the important units of railway operation system, which is responsible for train operation, station freight management, freight and passenger planning and revenue, and train operation monitoring. On March 8, 2005, People's Republic of China (PRC) and the Ministry of Railways carried out nationwide 15 railway bureau (group company) system reform, and cancelled the 4 1 railway sub-bureau under 10 railway bureau.
locomotive depot
Introduction:
The Locomotive Depot of the Transportation Bureau of China Railway Corporation is the highest-level unit of the railway locomotive system, which consists of locomotive depts of various railway bureaus (companies). Each locomotive depot consists of several locomotives, and each locomotive depot consists of several locomotive workshops and locomotive return sections. There are also maintenance workshops, maintenance workshops, equipment workshops and functional departments.
Function:
1. The locomotive workshop (operation workshop) was formerly the locomotive depot. When the layout of railway productivity is adjusted, the locomotive depot with fewer locomotives, smaller scale and shorter routing distance is integrated into the locomotive depot of an important railway hub. The original locomotive depot is integrated into a locomotive workshop or an operation workshop. Generally speaking, the locomotive workshop (operation workshop) is equipped with a certain number of locomotives and is responsible for the simplicity of locomotives.
2 locomotive turnover section (workshop) is the dispatching mechanism of locomotive depot, which is the same as the workshop. The locomotive turn-back section (workshop) is generally not attached to the locomotive, and is responsible for the overhaul, maintenance and maintenance of the locomotive, the handover of the crew, and providing a rest place for the crew.