Current location - Quotes Website - Collection of slogans - Summary of land reclamation supervision work
Summary of land reclamation supervision work
Time flies and a piece of work is over. Looking back on our work during this period, we have gained a lot. We should check, tidy up and write a work summary. How should I write a work summary? The following is a summary of the supervision of land reclamation that I have carefully sorted out. Welcome everyone to refer to it, I hope I can help you.

Summary of Agricultural Reclamation Supervision 1 In a blink of an eye, I have been in the company for a month. As a new employee, I am very grateful for the platform provided by the company, so that I can keep learning and making progress in my work and gradually improve my quality and talents. I would like to express my heartfelt thanks to the company leaders and colleagues for their help in my work.

In this month's time, for the new non-professional me, it is mainly to learn the relevant land reclamation rules and regulations first, and further understand some related knowledge of land reclamation, including why to reclaim, what to reclaim, the purpose and significance of reclamation, and the reasons, purposes and contents of reclamation schemes. Secondly, I practiced the mapping software and learned the knowledge of geology and hydrology in the process of mapping, but I haven't mastered it yet. In the next time, I will strengthen the study of this knowledge, once again learn the process of land reclamation field investigation and some matters needing attention, and learn the general operation methods.

During this period, there are also some problems, mainly in the following aspects:

First, due to the lack of experience and relevant professional knowledge, the solutions to some problems are too simple, the working methods are too simple, and sometimes the problems are one-sided.

Second, the comprehensive ability of inductive analysis is poor, so it is necessary to further strengthen the planning, systematicness and scientificity of knowledge learning about reclamation and improve the ability of comprehensive analysis and problem solving.

Third, because I am not a professional, I don't understand the meaning of some professional terms and symbols when I look at the relevant drawings. We should strengthen our cognitive ability in this respect.

Since I entered the company, I have studied hard, but there are still many places that need to be improved and improved, such as the theoretical level and working ability need to be further improved, and I am not familiar with the new job. These problems are determined to be improved and solved in my future work, so that I can do my job better and serve the company.

In view of the above shortcomings and problems, I intend to do the following work in the future to make up for the shortcomings in my work:

First, do a good job plan, continue to strengthen the study of the company's various work contents, and achieve a comprehensive and in-depth understanding of relevant knowledge.

Second, use practice and study to comprehensively improve their working ability. Pay attention to practice while paying attention to learning, guide practice with what you have learned in practice, and improve your working ability and level in all aspects.

Third, do your job well.

Do a good job with a more positive work attitude and a more enthusiastic work style.

In short, state of mind determines state, and state determines success or failure! Responsible for the company, caring for the society, persistent in work, enthusiastic about colleagues and confident in yourself! Be the best of yourself! The above is a summary of my work this month. Please criticize and correct me.

Summary of Land Reclamation Supervision 2 First of all, on behalf of all the staff of Rongguan Mining, I would like to thank the leaders for coming to our mine to inspect and guide the work, and express my warmest welcome to your arrival! Below, I will report the environmental protection and land reclamation of Rongguan Mining in recent years to the leaders, and please criticize and correct the shortcomings.

Since its establishment, Rongguan Mining has been focusing on environmental protection and restoration, and has been carrying out mine production and construction in strict accordance with the "three simultaneities" standard of environmental protection. No major environmental pollution incidents and geological disasters occurred. Our mine actively raises special funds, devotes itself to the recovery and management of the mine environment, and comprehensively manages and protects the mine environment in strict accordance with the environmental protection and recovery management plan and land reclamation plan. The specific work is as follows:

1 and XX years, the damaged grassland on the west side of the tailings pond was reclaimed, with a reclamation area of12,400 square meters and a total investment of more than 300,000 yuan.

2, XX years of mine road hardening kilometers (reinforced concrete pavement), with an investment of 2.4 million yuan.

3. In 3.XX year, 1.260m was used to build the slag retaining wall with waste stone slag head, and the investment was 1 ten thousand yuan.

4. In 4.XX, the damaged grassland in the south of the oil depot was mowed and covered with soil to restore vegetation1.200m2, covering 600m3, with an investment of more than 50,000 yuan.

5. In XX-XX years, the transportation road maintenance from the mining area to Erengabi invested more than 600,000 yuan each year, with a total investment of more than 0.8 million yuan/kloc-0.

6. In 6.XX, hollow cement bricks were used to protect the slope of the waste slag head at the lower side of the high-level pond, covering an area of 2,200 square meters and 1 100 cubic meters, with a total investment of 230,000 yuan.

7. In 7.XX, 1500 concentrator used hollow cement bricks for slope protection, covering an area of 800 square meters and an area of 400 cubic meters, with an investment of 90,000 yuan; The road slope on the east side of the oil depot is protected by hollow cement bricks, with an area of 1.500 square meters and an area of 750 cubic meters, with an investment of1.8000 yuan.

In 8 and XX years, a slag retaining wall was built on the slope of mine transportation road for 800 meters, with an investment of 80,000 yuan. In 9.XX years, 2800 meters of fence enclosure was built in the subsidence area, and 20 warning signs were set up, with a total investment of1.2000 yuan.

10 and XX years, the tailings pond was fenced with 1200m, and warning signs of 15 were set, with a total investment of 1 10,000 yuan.

1 1 year and XX-XX years, the dry beach of tailings pond was treated with straw mats and sprinkling water to reduce the pollution caused by tailings sand dust. The annual cost of using pasture is 200,000 yuan. The total investment in two years is 400,000 yuan.

12 and XX years, 50 speed bumps were installed on the highway from the mining area to Erengegaobi, with an investment of120,000 yuan, which reduced the pollution of grassland caused by road dust.

13, mine greening, XX to XX*** planting 200,000 seabuckthorn plants with an investment of 300,000 yuan. Invest 80,000 yuan to plant 800 poplars; Invest 40,000 yuan to plant 800 lilacs; Invest 40,000 yuan to plant 200 elm trees and 500 pine trees, and invest 200,000 yuan; Invested more than 30,000 yuan and planted more than 20,000 flowers. The total is 690,000 yuan.

14, XX years, the damaged grassland on the south side of the guest house was covered with soil, with an area of 150 square meters and an area of 75 cubic meters, with an investment of 1 10,000 yuan.

15 and XX years, slope cutting, leveling and soil covering were carried out in open pit mines. Slope cutting is about 8000 m3, leveling is about XX m3, and soil covering is 122 10 m3. The total investment is 450,000 yuan.

XX year 16, abandoned exploration dormitory in the north of the mining area was demolished, and construction waste was removed to the open pit. After cleaning, the site was covered with mud. Demolition of masonry buildings is about 800m3, cleaning up construction waste is about 800 m3, and covering soil is about 600 m3. The total investment is 6.5438+200,000 yuan.

17, XX years, leveling and covering the damaged grassland on both sides of the road on the west side of the Great Guard, with a total investment of 1 10,000 yuan.

In recent years, although our mine has strengthened the protection and treatment of geological environment, there are still some problems. I hope the leaders will correct the shortcomings of our mine. Our mine will strictly follow the instructions of the superior leaders and the requirements of the geological environment protection and restoration plan, comprehensively manage the environment in the mining area, increase capital investment, and ensure that the management work is completed in stages.

Iii. Summary of Land Reclamation Supervision According to the spirit of the Notice of the National Bureau Forwarding the Provincial Department of Land and Resources Forwarding the General Office of the Ministry of Land and Resources on Carrying out Special Inspection on the Implementation of Land Reclamation Laws and Regulations, and comparing the main contents of the inspection, we now conduct self-examination on the implementation of land reclamation laws and regulations in our bureau as follows:

I. Implementation of the Regulations

The Regulations on Land Reclamation has established a series of important systems to further standardize land reclamation activities under the new situation, which is the deepening and embodiment of cultivated land protection system and economical and intensive land use system. Our bureau attaches great importance to the implementation of the Regulations on Land Reclamation, and regards land reclamation as an important content and grasper of cultivated land protection.

(a), attach great importance to, in-depth study, extensive publicity, the implementation of the "Regulations on Land Reclamation"

First, by holding a staff meeting to study, all cadres and workers are required to truly understand the spiritual essence of the Regulations on Land Reclamation. Second, the publicity and implementation of the Regulations on Land Reclamation should be extensively carried out, and various forms of publicity on land laws and regulations should be carried out in combination with daily work such as Earth Day, Land Day, annual inspection of mines, law enforcement and supervision, such as making special leaflets, posting slogans and holding work forums. In order to enhance people's understanding of the Regulations on Land Reclamation and further promote the organization and implementation of the Regulations; The third is to strive for

With the support and coordination of relevant departments, the responsibility mechanism of land reclamation will be established. Fourth, through learning, implement land reclamation laws and regulations and perform their duties. The Regulation on Land Reclamation puts forward strict requirements for the supervision responsibility of county-level land and resources departments, supervises all kinds of land reclamation, urges the land reclamation obligors to prepare the land reclamation plan as soon as possible, puts forward strict requirements for the preliminary examination and filing of the land reclamation plan of the project, makes clear provisions for supervising the implementation of the land reclamation plan, and urges the land reclamation obligors to consciously perform their reclamation obligations and fulfill their reclamation responsibilities. Since the implementation of the Regulations on Land Reclamation, our bureau has strictly implemented the regulations. Fifth, constantly improve the construction of the Bureau's land and mineral development center, constantly improve staffing, training, office facilities and other aspects, strengthen the responsibilities of land development and reclamation, land and mineral development consultation, surveying and mapping, study the supervision workflow, earnestly strengthen leadership, and fulfill the responsibilities of land development and reclamation.

(B), the implementation of the "Regulations on Land Reclamation" has achieved results

Since the implementation of the Regulations on Land Reclamation, the land reclamation work in our county has been strongly supported by the county government and society, and some achievements have been made.

First, clear job responsibilities and establish and improve various work systems.

The second is to find out the damaged land 1000 mu left by history in our county (Qingshan, Xindian and Downstairs), and more than 500 mu of land was damaged by natural disasters (sweet potato has been reclaimed).

Third, more than 30 mining enterprises in our county have completed the preliminary examination, filing, supervision and guidance for land reclamation obligors to fulfill their land reclamation obligations, and drawn up annual reclamation plans.

Two. Supporting laws and regulations and internal management system construction

In order to better implement the Regulations on Land Reclamation, combined with the actual work of our bureau, we have formulated the Audit System of Land Reclamation Planning in Pu 'an County, the Supervision and Inspection System of Land Reclamation in Pu 'an County, the Annual Report System of Land Reclamation in Pu 'an County and the Guarantee System of Land Reclamation Expenses in Pu 'an County. Strengthen the land consolidation planning in internal management, start the investigation on the current situation and reclamation potential of damaged land in this region in time, find out the property, establish a land reclamation monitoring system, keep abreast of the damage of land resources and the effect of land reclamation, continuously explore the effective system of land reclamation, and gradually standardize land reclamation management.

Third, the implementation of the system

Based on the Regulations on Land Reclamation, combined with the reality of our county, we should establish the concept of serving the society and enterprises, and take the initiative to do a good job in the supervision and management of land reclamation of mining enterprises within our jurisdiction according to their functions. For mining enterprises whose land reclamation plans have been approved for the record, we should urge the specific implementation of land reclamation, establish an annual reporting system for land reclamation, conscientiously implement the supervision and management of the collection, pre-storage, extraction and use of land reclamation deposits, and do a good job in the connection of all aspects of land reclamation.

Strengthen the supervision and management of the implementation of land reclamation plan, earnestly fulfill the supervision responsibility of the implementation of land reclamation plan, link the land reclamation obligation with the annual inspection of mining rights, refuse the annual inspection if it fails to fulfill its obligations, and ensure the full performance of land reclamation obligations.

In addition, in the workflow of mining right approval and construction land review, our bureau also provides land reclamation suggestions to the higher authorities for approval, and takes land reclamation as a threshold in the review to ensure the healthy and steady development of land reclamation.

Fourth, the existing problems and suggestions

1. Due to the failure of some production and construction units or individuals that caused land damage to implement land reclamation funds and earnestly fulfill their land reclamation obligations, a large number of newly damaged land could not be reclaimed in time or failed to meet the specified quality requirements. Therefore, it is necessary to further strengthen and implement regulatory measures, and establish an effective regulatory restraint mechanism, a fund guarantee mechanism and a strict accountability mechanism.

2. A considerable part of the land damaged by historical problems and natural disasters has not been reclaimed in time, so it is necessary to clarify its reclamation subject and funding channels and standardize its reclamation management. A large part of the existing uncultivated damaged land belongs to the historical damaged land left by people without reclamation obligation and the land damaged by natural disasters. Because the existing legislation does not stipulate the responsible subject, funding channels and management methods of this part of the land, a large number of land has not been reclaimed in time.

3. Land reclamation needs huge capital investment, and the incentive measures for land reclamation need to be further improved. It is necessary to further improve the corresponding incentive measures, encourage land reclamation obligors to take the initiative to reclaim, and attract local governments and all sectors of society to actively participate in the reclamation of land damaged by historical and natural disasters.