According to the Administrative Measures for the Extraction and Use of Safety Production Expenses of Enterprises, Article 5 Coal production enterprises shall extract raw coal on a monthly basis. The extraction standard of safety cost per unit output of raw coal in each coal mine is as follows:
(a) coal (rock) and gas (carbon dioxide) outburst mines, high gas mines tons of coal 30 yuan;
(2) Tons of coal in other wells 15 yuan;
(3) 5 yuan for tons of coal in open-pit coal mines.
The classification of mine gas grade should be carried out according to the current "Coal Mine Safety Regulations" and "Mine Gas Grade Appraisal Standard".
Article 6 Non-coal mining enterprises shall extract raw ore on a monthly basis. The extraction standard of safety cost per unit output of raw ore in each mine is as follows:
(1) petroleum, per ton of crude oil 17 yuan;
(two) natural gas, coalbed methane (open-pit mining), 5 yuan per thousand cubic meters of raw gas;
(3) Metal mines, of which open-pit mines are 5 yuan per ton and underground mines are per ton 10 yuan;
(4) 25 yuan per ton for nuclear mines;
(5) Non-metallic mines, including 2 yuan per ton for open-pit mines and 4 yuan per ton for underground mines;
(6) Small open-pit quarries, that is, hillside open-pit quarries with an annual stripping amount of less than 500,000 tons and a maximum mining height of less than 50 meters, are used for construction and paving, and the price is per ton 1 yuan;
(7) The tailings pond is calculated according to the amount of tailings in storage, and the tailings pond of Grade III and above is per ton 1 yuan, and the tailings pond of Grade IV and Grade V is per ton 1.5 yuan.
Tailings that have been closed before the promulgation of these Measures shall be extracted according to the effective storage capacity of the tailings that have been stockpiled. If the storage capacity is below 6.5438+0 million cubic meters, 50,000 yuan will be withdrawn every year; If it exceeds 6,543,800 cubic meters, it will increase by 30,000 yuan for each additional 6,543,800 cubic meters, but the maximum annual withdrawal amount will not exceed 300,000 yuan.
The output of raw ore does not contain metal and nonmetal mine tailings and tailings and low-grade ore comprehensively utilized in waste rock yards.
The safety cost of geological exploration units shall be 2% of the total cost of geological exploration projects or projects.
Article 7 A construction enterprise shall take the cost of construction and installation projects as the accrual basis. The extraction standards for safety expenses of various construction projects are as follows:
(a) mine engineering is 2.5%;
(two) housing construction engineering, water conservancy and hydropower engineering, power engineering, railway engineering, urban rail transit engineering is 2.0%;
(3) 1.5% for municipal utilities, smelting, electromechanical installation, chemical and petroleum engineering, port and waterway engineering, highway engineering and communication engineering.
The safety expenses extracted by the construction enterprise are included in the project cost, and shall not be deleted when bidding, and shall be included in the management outside the standard. Where the state has other provisions on the budgetary estimate of capital construction investment, such provisions shall prevail. The general contractor shall directly pay the safety expenses to the subcontractors in proportion and supervise the use, and the subcontractors shall not extract them repeatedly.
Extended data:
Measures for the administration of the extraction and use of enterprise safety production expenses Article 19 The safety expenses of construction enterprises shall be used according to the following scope:
(1) Improvement, modification and maintenance expenses of safety protection facilities and equipment (excluding the safety facilities that need to be put into use at the initial stage of "three simultaneities"), including temporary power system, entrance, limb, machinery and equipment, protection for working at heights, protection for cross-operation, fire prevention, explosion prevention, dust prevention, gas prevention, lightning protection, typhoon prevention, geological disaster prevention, harmful gas monitoring, etc.
(2) Expenditure on equipment, repair and maintenance of emergency rescue equipment, equipment and emergency drills;
(three) to carry out the assessment, monitoring and rectification of major hazards and hidden dangers of accidents;
(four) production safety inspection, consultation and evaluation (excluding safety evaluation of new construction, renovation and expansion projects) and standardization construction expenditure;
(5) Equipment and updating expenses of safety protection articles for field workers;
(six) the cost of publicity, education and training of production safety;
(seven) the popularization and application of new technologies, new equipment, new processes and new standards suitable for safe production;
(eight) expenditure on safety facilities and special equipment testing;
(nine) other expenses directly related to production safety.