The total investment of the project is 110.50 billion yuan, including 2 million kilowatts of photovoltaic field and ecological construction project for sand control110,000 mu. The project is expected to realize full-capacity grid-connected power generation by the end of 2024, and the average annual green power supply will be about 4 billion kWh after completion.
The project adopts the "three pairs" three-dimensional ecological photovoltaic sand control mode of double-sided power generation on the board, double-layered ecology under the board and double-layered farming between the boards, and organically combines the new energy industry with desert control, ecological restoration and modern agriculture and animal husbandry.