Current location - Quotes Website - Excellent quotations - What does supervision mean?
What does supervision mean?
Question 1: What is project supervision? The foundation of engineering supervision work is engineering contract and supervision contract. The duty of the supervisor is to promote the full implementation of the project contract signed by Party A and Party B under the premise of implementing national laws and regulations. Construction project supervision controls the investment, time limit for a project and project quality; Conduct safety management and project construction contract management; Coordinate the working relationship between relevant units, that is, "three controls, two controls and one coordination" Project construction supervision is a major reform in the field of engineering construction, which is not only in line with foreign countries, but also combined with China's national conditions. Similar to providing engineering project management services to owners abroad. According to the needs of the owner, the project supervision can provide the owner with the supervision of the whole process or a certain stage, such as the construction stage.

Now I tell you in vernacular: the construction unit carries out the construction according to the drawings and specifications of the design unit, and the supervision unit looks at the design drawings and specifications to see if the construction unit has a construction process according to the drawings.

Question 2: What do the employer, contractor and supervisor mean? Ask the developer for a detailed explanation: investors pay to buy a house.

The contractor is: the builder. He is here to build a house to make money.

The supervisor is the party invited by the owner to manage the project construction for himself. At present, it mainly manages the construction quality of the project and supervises the safety production on site.

Question 3: What is supervision? I have a lot to do with the supervisor, mainly referring to the overall management of the project by the intermediary agency entrusted by Party A..

To sum up, the main tasks are: three controls, two controls and one coordination.

Namely: investment control, schedule control, quality control, contract management and information management; Coordinate all construction enterprises.

A project needs to set up a supervision project department, the main person in charge is called the chief supervision engineer, and usually someone with the qualification of registered supervision engineer is needed. The rest are generally professional supervision engineers and supervisors.

At present, in China, supervision is mainly entrusted by Party A, so it listens to Party A, but also manages Party B, which is the construction enterprise, so construction enterprises are generally more polite to supervision. Hehe, the position of supervisor is ok. However, supervision is sometimes very hard, because there are generally no holidays in construction, so supervision should always be present, especially for key parts and key processes, which need on-site supervision, so it is called standing by.

Question 4: What does supervision mean? The word "supervision" can be understood as a noun or a verb, which refers to a specific behavior. Its English equivalent noun is supervision and its verb is supervision.

It can be seen that supervision is a foreign compound word, which has not been clearly defined in Chinese dictionaries in China. How to explain and understand its meaning completely and accurately needs further research and discussion.

Question 5: What does stamp supervision mean? What is the difference from normal supervision? What you are talking about should be a form of certificate attachment ... that is, for example, you have a certificate of supervision engineer, but you are not actually engaged in supervision tasks at the construction site. Attach the qualification certificate, and hold your seal when the supervisor needs to sign and seal at all stages of the project ... It is very risky to advise people who are not familiar with it.

Question 6: What is supervision? The real supervision is a fair, just and independent third party between the constructor and the constructor. Entrusted by the constructor, it is responsible for the supervision and management of project quality, progress, investment and safety. In China, the reality is that only the contractor's money can serve and rely on Party A. ..

Question 7: What does the construction/supervision unit mean? This column needs to be signed by both the owner and the supervisor for confirmation. It must be signed by the supervisor first, and then by the employer. This is a fixed process, not something you want to ask or dare not ask. It is a part of the industry during the overall acceptance of the project.

Question 8: What is a supervision engineer? Hello!

There are two kinds of supervision engineers: registered and unregistered. Professional title refers to the professional and technical level and ability of professional and technical personnel, as well as the grade title of achievements, reflecting the academic and technical level and working ability of professional and technical personnel.

All citizens of People's Republic of China (PRC) who are healthy, law-abiding and meet one of the following conditions can apply to take the qualification examination for supervision engineer.

(a) to participate in the general (4) examination conditions:

1. College degree or above, major in engineering technology or engineering economics. In accordance with the relevant provisions of the state, he has obtained intermediate positions in engineering technology or engineering economy and has served for 3 years.

2, in accordance with the relevant provisions of the state, to obtain senior positions in engineering technology or engineering economy.

3. 1970 (including 1970), graduated from technical secondary school majoring in engineering technology or engineering economy, and obtained the intermediate position of engineering technology or engineering economy in accordance with the relevant provisions of the state, and served for three years.

(2) Exemption conditions for some subjects:

Applicants who are engaged in project construction supervision and meet the following four conditions at the same time may be exempted from the two subjects of "contract management of construction projects" and "quality, investment and progress control of construction projects".

Graduated from technical secondary school (including technical secondary school) majoring in engineering technology or engineering economy before 1 and 1970 (including 1970);

2, in accordance with the relevant provisions of the state, to obtain senior positions in engineering technology or engineering economy;

3. Engaged in engineering design or engineering construction management for 15 years;

4, engaged in supervision work 1 year.

I hope my answer is helpful to you.

Question 9: What is a supervisor's inspection? According to the Manual of Highway Engineering Construction Supervision, the supervision task in the construction preparation stage is to "prepare the detailed rules for supervision implementation and formulate various working procedures". This paper does not clearly point out the actors who compile the supervision implementation rules, but in practice, most of the supervision implementation rules are extracted and listed by the professional supervision engineers of the supervision team in the factory, which can not highlight the word "how to implement" and has poor pertinence and operability. How to write the detailed rules for supervision implementation? The author believes that only by clarifying the role of supervision implementation rules, the writing will naturally be clear. I. Role of supervising the detailed rules for implementation: 1. Role of the owner: The relationship between the owner and the supervisor is the relationship of entrustment and entrustment, which is determined by the supervision entrustment contract, and the supervisor works on behalf of the owner. The detailed rules for the implementation of supervision are the guiding materials for supervision work, which reflect the supervision unit's cognitive ability and technical level of project control. A detailed and targeted supervision implementation rules can eliminate the owner's doubts about the supervision ability, enhance the trust and help the owner to support the supervision work. 2. The role of the contractor: 1) After receiving the detailed rules for supervision, the contractor will be very clear about the supervision control procedures and methods of each sub-project. In the future work, we can strengthen the communication and contact with the supervisor, clarify the inspection procedures and methods of each quality control point, and prepare for the spot check of the supervisor on the basis of self-inspection. 2) There are preventive and emergency measures for common quality faults, key points and difficulties in engineering construction in the detailed rules for supervision implementation. This has played a very good warning role for the contractor, and can always remind the contractor what problems should be paid attention to in the construction, how to prevent the occurrence of common quality defects, and avoid leaving hidden dangers to the project quality and delaying the construction period. 3) Push the contractor to strengthen self-inspection, improve the quality assurance system, carry out total quality management and improve the overall management level. 3. The role of the supervisor: 1) Guide the supervision work, so that the supervisor can better control the quality through various control means. 2) Increase the supervision's understanding and familiarity with this project, and carry out supervision work in a targeted manner. 3) The analysis and pre-control measures of common quality problems, key points and difficulties in the detailed rules for supervision implementation can enable the on-site supervision personnel to take remedial measures quickly in the construction, which is conducive to ensuring the engineering quality. 4) It is helpful to improve the professional technical level and quality of supervision. Two. Detailed rules for the implementation of supervision: definition of supervision engineer: refers to an independent legal person entrusted by the owner to undertake the supervision of this contract for the implementation of this contract. Therefore, the detailed rules for the implementation of supervision should be the technical data provided by the supervision unit. Considering the construction conditions and technical characteristics of the project, the detailed rules for supervision implementation should be formed by a group of experienced engineers organized by the supervision company, or written by professional supervision engineers according to the discussion results. In view of the lack of professional supervision engineer's own level and experience, it should be inappropriate to draft by professional supervision engineer alone. The detailed rules for the implementation of supervision should be targeted, practical and professional, and clearly reflect the supervision procedures and methods. The detailed rules for supervision and implementation are written as follows: 1. How to review the contractor's construction technical scheme in the construction preparation stage; How to check the contractor's preparation work in detail and explain the inspection contents before the start of each branch project? 2, in the construction stage, how to control the engineering quality; Clear the position of each quality control point and the inspection method of quality control points; Put forward pre-control measures for common quality defects to remind contractors how to pre-control. 3. Guide the work content of quality supervision, how to carry out dynamic control, and do well the control before, during and after the event. 4. Clarify the methods of engineering quality supervision, namely inspection and verification, sampling test, detection and measurement, on-site inspection, on-site inspection and the application scope of issuing instruction documents; Strict, systematic and comprehensive quality supervision and management shall be carried out for every stage, link and working procedure in the construction to ensure the realization of quality supervision objectives. 5, highlight the key points, write how to control the quality of the difficulties and key points of the project, and how to prevent and deal with possible anomalies in the construction. 6. Formulate quality supervision procedures (i.e. work flow) to guide the construction and supervision of the project, standardize the construction activities of contractors, and unify the work steps of supervision, inspection and management of contractors and supervision engineers. Conclusion: Detailed rules for supervision implementation should be compiled according to the provisions and requirements of contract documents, design documents and construction technical specifications, with emphasis on prior supervision and active supervision. It standardizes the contractor's construction activities and unifies the work steps of supervision, inspection and management of contractors and supervision engineers. & gt