In order to ensure the timely delivery of the project, we adopted a 24-hour working system and went all out to catch up with the progress.
Facing the backward construction period, we are trying our best to catch up and ensure that the project is completed on time.
4, grasp the progress, grasp the quality, let the project become the pride of the owner, we have been moving forward.
5. Grasp the key points, overcome difficulties, ensure the nodes, set off a new upsurge of construction in an all-round way, race against time in advance, seize the speed, ensure safety and quality.
6. act at full speed, devote yourself to it, grasp the time at the speed of sprint, and ensure timely delivery.
7. Race against time, do not slack off, and try our best to catch up with the construction period with the highest efficiency.
8. No matter day or night, we always stick to the construction site. In order to seize the construction period, we try our best to give you a satisfactory project as soon as possible.
9, grasp the time, create a miracle, speed up the construction, quality first.
10, at a sprint speed of 100 meters, in a state of all-out, compressing time and catching up with the construction period.