Current location - Quotes Website - Personality signature - What relevant certificates can non-architecture majors take?
What relevant certificates can non-architecture majors take?
1. Application materials for completion quality verification 1. 2. The application for completion submitted by the construction unit to the supervision unit. 3. The application for completion quality verification submitted by the construction unit and supervision unit to the quality supervision station. 4 copies of the pre-trial report of urban construction archives. As-built photos (four facades of the building, shooting aproll) 5. List of inspection items issued by the inspection unit (stamped with the official seal of the inspection unit) and supervision unit's statement on the verification of the inspection scope of the list and witness sampling (stamped with the official seal of the supervision unit), door and window inspection report and indoor environmental quality inspection report (check the original, however, the information can be a copy. ) fire inspection opinions, lightning protection test report, elevator test report, ventilation and air conditioning test report, and high-rise settlement observation record 6. Unit (sub-unit) project summary table (subject to the format required by the station, see sample table for printed copy) 7. Pre-examination list of completion data of supervision unit and corresponding rectification report (signed and approved by the director) 8. Evaluation opinions of the supervision unit on the completed data after rectification (signed and approved by the director) 9. Completion data supervision pre-trial list 10, supervision pre-trial list rectification report (need to be stamped and approved by the construction unit and supervision unit, and approved and signed by the supervision) 2. Completion data (original) 1, slot inspection record (ZTY-0060), quality acceptance record of each division and subdivisional work (ZTY-004 1), and countersign form of each division and subdivisional work (ZTY-0027)2. Unit project control data verification record form (ZTY-0045) for filling in the conclusion and signing) 3. Unit project safety and inspection data verification and main function spot check form (ZTY-0046)4. Unit project visual quality inspection record (ZTY-0047)5. Unit project completion acceptance record form (ZTY-0044) 3. Supervision files (collected and filled by supervisors). Supervise the safety disclosure. 4 construction drawing technical review report, geological exploration technical review report. 5. Construction drawing technical examination certificate or construction drawing approval certificate and geological exploration technical examination certificate. General situation of the unit (sub-unit) project (subject to the format required by the site, see the sample table) 6. Catalogue of all design changes (to be confirmed by the supervision unit and stamped with official seal) 7. Main approval documents, construction permit, planning permit, fire control review, bid-winning notice, etc. 8. Commencement Report (ZTY-0004)9. Completion report (ZTY-0005) 10, name of each responsible unit of the construction project and information of main person in charge (ZTY-0006) 65438+ list of construction management personnel of this project (ZTY-0007), copy of work permit and qualification of the construction unit 12, letter of appointment of the director (written statement that the director agrees to accept the appointment) Evaluation letter 1, engineering quality evaluation letter from the five responsible parties of construction, supervision, construction, design and survey (note: the contents to be filled in shall conform to the supervision guidelines and relevant codes and standards. There must be an official seal of the unit, and this part must be original) 5. Project quality supervision report (attached with three unit project profiles, subject to the format required by the station, see the sample table, all contents can be printed, and there can be no official seal) 6. Household acceptance data 7. Other materials that need to be saved (Note: When reviewing the above contents, the supervisor should pay attention to the fact that the contents filled in and the qualifications of the signatory should conform to the Unified Standard for Acceptance of Engineering Quality, Supervision Guidelines and other relevant codes and standards.