Rural bungalow construction contract 1 party a: _ _ _ _ _ _ _ _ _ _
Party B: _ _ _ _ _ _ _ _ _ _ _
Party A plans to build a house on the basis of the original village, and Party B has been engaged in rural housing construction for a long time, with a certain professional level and popularity. Party A now contracts the house renovation project to Party B for construction, and both parties reach the following contract on the basis of equality, mutual benefit and consensus:
I. House structure and contract scope:
Party A plans to build a one-story bungalow with brick-concrete structure. Party A has completed the laying of foundation and bottom ring beam, and now the ground construction of the house is contracted to Party B. The contracting scope includes wall body masonry, ring beam laying, roof laying, interior painting of the house, porcelain pasting (porcelain pasting outside the front wall, sanitary porcelain pasting inside the living room wall, sanitary porcelain pasting inside the kitchen and bathroom), ground cement calendering, and cement external powder wall on the east side of the house;
II. Valuation area and payment method of the house:
1. Calculation method of area: After the building is completed, both parties shall first measure the length and width of the built building, from the time when the eaves of one building dripped to the time when the eaves of the other building dripped, the area obtained by multiplication minus the bright sky area in the courtyard is the house pricing area. The appraised area of the house is square meters;
2. Price: The unit price agreed by both parties is _ _ _ _ _ _ _ _ _ _.
3. Payment method: Party A shall pay RMB _ _ _ _ _ _ _ _ _ _ _ _ _ _ and Party B _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Three. Term of contract:
The term of this contract is from year to year. Among them, the main body of the wall building and the upper roof of the beam will be completed before _ _ _ _ _ _ _ _ _ _.
Four. Rights and obligations of both parties
1. Party A shall pay the price to Party B as agreed, and provide the building materials such as cement, sand, steel bars, etc. required for the building according to Party B's construction progress;
2. Party A shall provide water and electricity for Party B's use and ensure that water and electricity can be used normally;
3. Party B shall ensure that the project is completed as scheduled according to the design intention of Party A to build the house, and ensure that the quality of the house meets the industry requirements and overall requirements, and the required professional equipment such as mixers, scaffolding, pipes, etc. shall be provided by Party B;
4. During the construction, Party B shall be responsible for the personnel employed by its own headquarters, organize and supervise the construction, and be responsible for the quality of the house. Party B shall actively take safety measures to ensure safe production. In case of any safety accident during construction, all the injuries caused shall be borne by Party B, and Party A shall not bear any responsibilities.
5. Party A does not participate in the construction organized by Party B, but has the right to supervise the construction process of Party B. If any quality problem is found in the house built by Party B, Party A shall communicate with Party B in time and have the right to ask Party B to correct it in time. After Party A accepts the quality of the house built by Party B, both parties sign it, and Party B completes the delivery obligation.
Verb (abbreviation of verb) liability for breach of contract:
1. Party A shall pay the salary to Party B within the agreed time limit. In case of breach of contract, Party A shall pay liquidated damages to Party B for each day overdue;
2. Party B shall complete the construction with good quality and quantity within the agreed time limit. In case of breach of contract, Party B shall pay liquidated damages to Party A for each day overdue;
3. If there is any problem with the quality of the house, Party A has the right to ask Party B to redo or repair it in time. If Party A fails to complete it within three days after notifying Party B, Party A has the right to ask others to repair or redo it, and Party B shall bear the expenses required for removal, repair and rework.
During the construction process, matters not covered in this contract or changes in contract contents shall be settled through friendly negotiation between the two parties and the intermediary agency, and a supplementary contract may be signed, which has the same legal effect as this contract.
This contract shall come into effect after being signed by both parties, in triplicate, one for each party and one for the intermediary, with the same legal effect.
Party A (official seal): _ _ _ _
Party B (official seal): _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Rural bungalow construction contract 2 Party A: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Party B: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Through friendly negotiation, Party A and Party B have reached the following contract on the construction of Party A's residence by Party B:
I. Work content
Foundation pit excavation and cleaning, foundation and wall masonry, concrete pouring, etc., and meet the requirements of the specification and Party A..
Second, the project price and payment method
1. Project price: _ _ _ _ _ _ _ _ _ _ _ _ _ _.
2. The building project of the house is contracted by the way of labor and materials contracting, and all expenses such as mechanical equipment, cement, sand, bricks, steel bars, tools, water, electricity, insurance and miscellaneous fees shall be borne by Party B. ..
3. The project settlement shall be calculated according to the construction progress of Party B, and 35% shall be paid after the completion of the first floor, 35% after the completion of the second floor, 25% after the completion of the project, and 5% shall be used as the quality guarantee. The liability period for quality defects is two years.
III. Materials and Construction Organization
1. Brick: _ _ _ _ _ _ _ _ _ _.
2. Sand: purchased by Party B in the sand factory and transported to the construction site.
3. Cement: purchased by Party A, collected by Party B in Party A's warehouse and transported to the construction site. Party A shall deduct the cement payment from Party B's project payment at the cost price.
4. Machinery, equipment, tools and personnel: Party B shall organize machinery, equipment, tools and construction personnel by itself, and guarantee to meet Party A's project schedule requirements.
5. Organization and coordination: Party B actively organizes and coordinates the required materials, vehicles and personnel, and cooperates with the management personnel of the project department.
Four. Obligations and rights of Party A and Party B
1. Party A is responsible for on-site guidance and coordination.
2. Party A shall supervise the quality, safety and progress of Party B's project, and Party B shall serve Party A's management.
3. Project quality: Party B shall carry out the construction in strict accordance with the specifications. If the quality of the project fails to meet the requirements of Party A due to hidden dangers left by Party B's violation of codes and regulations during the construction process, Party A has the right to stop the construction and order it to be reworked until it meets the requirements.
4. Party B is responsible for the construction of the completed project and the maintenance during the quality defect liability period. If Party B fails to repair the defect within the quality defect liability period, Party A will deduct the quality deposit, and if there is no quality problem after the defect expires for two years, Party B will be refunded 5% of the deposit.
5. Project safety: Party B shall be responsible for the safety of construction personnel and any accidents.
6. Project progress: Party B shall organize corresponding manpower and material resources to ensure the project progress according to Party A's progress requirements.
7. Public security management: Party B's construction personnel shall not violate the regulations on public security management and shall not fight. If there are disputes and contradictions, they should actively contact Party A and solve them through appropriate means.
8. All creditor's rights and debts related to Party B shall be borne by Party B. ..
Verb (short for verb) others
1. This contract is made in duplicate, one for Party A and one for Party B, with the same legal effect.
2. This contract shall come into effect after being signed and sealed by both parties, and shall automatically become invalid after the project completion acceptance and quality defect liability period are over and Party B's internal and external debts are settled.
3. Matters not covered in this contract shall be settled by both parties through consultation.
Party A: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Party B: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Rural bungalow construction contract 3 Party A: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Party B: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Through negotiation between both parties, Party A plans to build a house in Shang Xian New Village, with an area of about 1 12 square meters, and Party B will be responsible for contracting the project construction. This contract is hereby concluded as follows:
First, the way of contracting:
1. Party B undertakes the construction, and workers should pay attention to their own safety when entering the construction site. Party B is responsible for the expenses of nails, wire, sitting plane, key head, shovel, boiled water, tobacco, foundation floor burst and 3 cm steel protective layer. Party B shall be responsible for laying bricks, river sand, gravel, lime, cement, steel and water pipes. Labor, construction technology, steel binding technology, tree formwork and splint support, crane, yard nail, connecting plate and all production and living appliances shall be borne by Party B. ..
2. Flowers and plants have three rows of floating bricks on each floor. The whole building has thirteen 5030cm columns, four of which are 5050cm, the beam depth is 5020cm, and the periphery of each pile with reinforced protective layer is 3cm. The building floats up and down with 40cm windows, with both sides floating outward with the square meters of each floor and one side floating outward with the windows.
Second, a fine of five thousand yuan.
This contract is made in duplicate, one for each party. This contract shall come into force as of the date of signature and have the same legal effect.
Party A (signature): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Party B (signature): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Attendance (signature): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _
4 rural bungalow building construction contract general manager private housing construction: _ _ _ _ _ _ _ _
Party B: _ _ _ _ _ _ _ _ _
Person in charge of private housing construction: _ _ _ _ _ _
According to the Construction Law, the Economic Contract Law and relevant laws and regulations, Party A and Party B have reached an agreement on the private housing construction project on the principles of equality, voluntariness, fairness, reasonableness and mutual benefit through consultation. In order to regulate the civil actions of both parties in the construction of private houses, the terms of this contract are formulated, and both parties must strictly implement them.
I. General situation of construction projects
Private residential building projects refer to civil residential buildings. This project is designed as a two-story brick-concrete structure building. The construction area is subject to the actual measurement, and the construction cost per square meter is _ _ _ _ _ _ _ _ _ _ _.
Second, the architectural design requirements
1. This project is a brick-concrete residence with a depth of 7m and a total length of13.5m.. It is a bungalow building with a building area of _ _ ㎡.
2. The construction area shall be subject to the actual measurement, and Party B shall pay the remuneration according to the actual measurement area to ensure that the area shall not be increased or decreased at will. If it needs to be modified, it must be agreed by both parties through consultation, otherwise Party B shall bear all the responsibilities.
Three. Party A is responsible for the supply of steel bars and materials.
1, the reinforcement is grade III reinforcement, and the square column: 16- 18-20 (tree) is constructed according to the formal design.
2. The Ordovician cement is 32.5, with the first floor 3.9 meters high and the second floor 3.8 meters high.
3. The thickness of the plate is13-14cm, and the cylinder is 30cm.
There are two small window covers and one large window cover. The small window cover and the large window cover are designed and constructed by Party A, with a slope around the roof and a height of _ _ _ meters.
5. Party B shall ensure that the house is qualified in quality and reasonable in design, and shall not misuse or discard building materials.
Fourth, the contract construction method
1. Before the construction of this project, Party A must ensure the smooth flow of power supply, water supply, access roads and building areas, and Party A shall solve the disputes between the construction and neighboring neighbors caused by the border buildings. ..
2. The construction method of this project is contract construction, and the area price is negotiable at one time. The project must be designed and constructed in strict accordance with the graphics (sketches designated by both parties). Without the consent of Party A, Party B shall not arbitrarily change the graphic design, increase or decrease the area at will, or engage in irresponsible construction methods.
3. If design problems are found in the construction process and need to be changed, both parties need to reach an agreement through consultation and re-sign the change contract before it takes effect, otherwise Party A will not admit it, and Party B will bear all the responsibilities for materials and construction costs.
4. Party B must ensure the safety in production during the construction period. In safety construction, there must be enough safety guarantee mechanisms and measures. Because Party B does not pay attention to safety in the construction process, Party B shall bear all the responsibilities, and Party A shall not bear any responsibilities.
5. Party B must accept the supervision of Party A in the construction process, and accept and adopt the contract proposal.
6. Party B shall bring its own machinery and be responsible for its own templates, mandrels and meals.
Verb (abbreviation for verb) item content
1. The payer of this project pays _ _ _ _ _ _ _ _ _ _
2. The quality deposit10,000.00 yuan shall be paid within 65,438+0 years from the date of completion of civil works. Party A must pay the quality deposit when it is due, and all the money shall not be withheld.
3. Party B: Ensure that there are no quality problems in the house, such as wall cracking, floor leakage, etc. If there is any problem, Party B shall bear all the responsibilities and detain all the money during the probation period.
4. Party A: It is normal for the building wall to have minor cracks and other minor phenomena that do not affect the building quality. Party A must pay all the money when it is due and shall not detain it.
5. According to the commencement date of this project, the planned construction period is 120 days.
Other items of intransitive verbs.
During the construction of this project, both parties shall strictly abide by the contract and shall not terminate the contract at will. In the process of construction, in case of force majeure natural disasters or house demolition by government departments, the contract can be terminated according to the percentage of project construction.
Matters not covered in the time limit for a project can be settled by both parties through consultation at any time, and a supplementary contract for the project can be signed.
Seven. Dispute mediation
This agreement shall come into force after being signed and sealed by both parties.
After the signing of this agreement, all disputes between the two parties concerning this agreement shall be settled through consultation. If negotiation fails, either party may bring a lawsuit to the judicial organ or the people's court with jurisdiction.
For the part that does not involve disputes, both parties shall continue to perform according to this agreement. The modification of this contract must be agreed by both parties through consultation. This contract is made in duplicate, one for each party.
This contract shall come into effect after being signed by both parties, and both parties shall abide by it after it comes into effect.
Party A (signature and seal): _ _ _
Party B (signature and seal): _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _
Rural bungalow construction contract 5 Party A: _ _ _ _ _ _ _
Party B: _ _ _ _ _ _ _ _ _
Party A plans to build a house in _ _ _ _ _ _ _.
First, the contracting method.
Party A shall provide materials needed for the building, including bricks, river sand, gravel, lime, cement, steel, water pipes, nails, iron wire bundles, water and electricity, barrels, etc. Party B shall provide labor services, construction technology, steel binding technology, formwork and plywood support, scaffolding materials, cranes, yards, connecting plates and all production and living appliances. According to the construction progress.
Second, the construction project
Party B must carry out the construction according to Party A's design drawings and requirements.
(1) The main project of Party A's house (from the ground beam to the roof) includes wall, inverted two-story column, beam and column, simple beam and column, stairs, floor slab, formwork support, formwork removal, reinforcement and concrete pouring for each layer.
(2) Construction of hanging bricks, hanging steel bars, hanging river sand, cement, lime, pebbles and corridors besides concrete pouring.
(3) Doors and windows lintel.
(4) The mezzanine of stairs, toilets and warehouses.
(5) including paper pulp.
(6) floor polishing.
Three. Rights and obligations of both parties
1. Party A shall provide the materials needed for the building within the specified time limit according to Party B's requirements.
2. Party B shall carry out the construction according to the drawings and Party A's requirements, strengthen the quality management and clarify the construction requirements. In the important construction process, the following steel bars and cement slabs must be accepted by Party A before the next working procedure can be carried out. ..
3. Party A has the right to ask Party B to stop work or rework for rectification when it finds that Party B is cutting corners and irresponsible in the construction process, which affects the quality of the house.
4. One year after the house is completed, if Party A finds quality problems, Party B must maintain it free of charge according to Party A's requirements, and the expenses shall be borne by Party B. ..
5. Party B must strengthen the safety education of its personnel, strictly manage it, and make careful, safe and civilized construction. Party B shall be responsible for the safety problems caused by the negligence of Party B's personnel, and Party A shall not be held responsible.
6. The remuneration of Party B's personnel shall be paid by Party B, which has nothing to do with Party A. During the construction, attention shall be paid to unnecessary waste of materials to save raw materials.
7, metope guarantee level, the error is not more than 0.65438+/-0 cm.
Fourth, the project payment
1, project payment settlement method, with actual construction area after completion, 88 yuan per square meter.
2. Payment method: 80% when each floor is completed, and the latter 20% when completed.
Verb (abbreviation of verb) construction period
The construction period starts from July 1 of _ _ _ _ _ _ _ and ends at the end of February 1 of _ _ _ _ _ _ _ (no later than the middle of _ _ _ _ _ _ 10). The construction period is days. In case of rain, power failure and other natural factors, the construction period can be appropriately extended. If Party A is embarrassed by Party B's passivity or other reasons, Party A may find it difficult.
This contract is made in duplicate, one for each party, and shall come into effect as of the date of signature.
Party A (signature): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Party B (signature): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Attendance (signature): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _