What procedures should I go through before using the tower crane?
I. Processing conditions

Units or individuals who meet all the following conditions can apply: (1) proof that the user of special equipment has legal identity; (2) The special equipment used is legally produced (including design, manufacture, installation, maintenance and transformation); (3) Special equipment has been registered for use.

Second, the handling of materials

It is applicable to the change, relocation, name change and provisions within the administrative area of the registration authority, and different forms are filled out according to different equipment.

Applicable to the name change, with the manager as the unit, providing the unified social credit code certificate; If the manager is an individual (applicable to special equipment owned by individual citizens), provide personal ID card.

Suitable for providing decoration changes, such as decoration certificates. , and check with the original.

Applicable to change and provide, and check with the original.

It is applicable to the change of the original unit and the provision of the change that will continue to be used after reaching the design service life, and it is checked with the original unit.

It is applicable to change, move within the administrative area of the registration authority, change the original unit, change the name, and continue to use after reaching the design service life.

Applicable to the change, relocation, original unit change and name change within the administrative area of the registration authority.

Applicable to the relocation, installation, alteration and provision within the administrative area of the registration authority, and checked with the original.

Applicable to property units and the use of registration certificate does not meet the use of units, property units for the unit to provide changes.

Applicable to renaming change clauses.

When entrusting others to handle it, provide and submit the original ID card of the client for verification, and the copy of the ID card of the client needs my signature.

Provide it when entrusting others to handle it.

Third, the handling process

Online processing flow

The online handling process of this matter is as follows (applicable to renovation changes):

(1) application.

The applicant logs into the Guangdong Special Equipment Electronic Supervision Extranet System (:809 1/gdtsout), or enters the Shantou Branch Office of the Guangdong Online Service Hall (/), enters the window system of Shantou Quality and Technical Supervision Bureau, clicks "Online Bid" to submit relevant materials, submits an application on the website, and uploads electronic materials.

(2) acceptance.

The staff of the implementing organ shall, within 2 working days, accept and review the electronic application materials according to the requirements of the joint document, and put forward the pre-acceptance opinions. The implementing organ conducts a preliminary examination of electronic materials. If the applicant meets the application qualification, and the materials are complete, the format is standardized, and the legal form is met, it will be accepted in advance and signed online; If the applicant does not meet the application qualification or the materials are incomplete and do not meet the statutory form, it shall be returned, and the reasons for the return shall be informed at one time; After the pre-acceptance, the applicant shall submit paper materials to the window of the municipal administrative service center by himself or by mail.

After receiving the application materials, the implementing organ shall make a decision on acceptance or rejection within 5 working days. Once the application materials are incomplete or do not conform to the statutory form, it shall inform all the contents that need to be supplemented. If the application materials need to be corrected, the application shall be terminated after the implementing organ returns the application materials to the applicant. After making corrections to the application materials, the applicant may reapply. If the application is not informed within the time limit, it shall be accepted from the date of receiving the application materials.

(3) Review and cooperation.

After acceptance, the implementing organ shall examine the application materials according to the provisions of laws, regulations and safety technical specifications, and conduct on-site verification of the handling conditions when necessary. If it meets the licensing requirements, it shall make a decision on administrative license within 15 working days from the date of acceptance, and issue a decision on granting administrative license, a special equipment use registration certificate and a special equipment use registration form. Do not meet the licensing conditions, issued a "decision not to grant administrative license", written to inform the reasons.

(4) obtaining the processing result.

After passing the examination, the special equipment use registration certificate and the special equipment use registration form will be issued. Applicants can choose to collect or mail the results.

(5) supervision and inspection cooperation

According to Article 22 of the Measures for the Implementation of the Administrative License for Quality Supervision, Inspection and Quarantine (OrderNo. General Administration of Quality Supervision, Inspection and Quarantine 149), if the substantial contents of the application materials need to be verified according to law, the municipal quality supervision department will assign two or more inspectors to conduct on-site verification. The licensee shall, in accordance with the requirements of the implementing organ, make good preparations for supervision and inspection.

(6) Flowchart

Window processing flow

The procedures for handling this window are as follows (applicable to the change of relocation, original unit, name and continued use after reaching the designed service life within the administrative area of the registration authority):

(1) Application

Before the special equipment is put into use, the applicant can apply through the window and submit the application materials as required. Where the original unit is changed or renamed, the applicant shall, within 30 days from the date of the change of the use of special equipment, apply through the window and submit the application materials as required.

(2) acceptance.

After receiving the application materials, the implementing organ shall make a decision on acceptance or rejection within 5 working days. Once the application materials are incomplete or do not conform to the statutory form, it shall inform all the contents that need to be supplemented. If the application materials need to be corrected, the application shall be terminated after the implementing organ returns the application materials to the applicant. After making corrections to the application materials, the applicant may reapply. If the application is not informed within the time limit, it shall be accepted from the date of receiving the application materials.

(3) Review and cooperation.

After acceptance, the implementing organ shall examine the application materials according to the provisions of laws, regulations and safety technical specifications, and conduct on-site verification of the handling conditions when necessary. In line with the licensing conditions, make an administrative licensing decision within 15 working days from the date of accepting the relocation within the administrative area of the registration authority, and issue a decision on granting the administrative license, a special equipment use registration certificate and a special equipment use registration form; The administrative licensing decision shall be made within 5 working days from the date of accepting the change of the original unit and name and continuing to use the change after reaching the design service life. An application for registration of more than 50 units at a time or registration by units can be extended to 15 working days, and a special equipment use registration certificate, a special equipment use registration form or a certificate of change of the special equipment use registration certificate shall be issued. Do not meet the licensing conditions, issued a "decision not to grant administrative license", written to inform the reasons.

(4) obtaining the processing result.

Those who pass the examination shall change the original special equipment use registration information, and issue a special equipment use registration certificate, a special equipment use registration form or a certificate of change of the special equipment use registration certificate. Applicants can choose to collect or mail the results.

(5) supervision and inspection cooperation

According to Article 22 of the Measures for the Implementation of the Administrative License for Quality Supervision, Inspection and Quarantine (OrderNo. General Administration of Quality Supervision, Inspection and Quarantine 149), if the substantial contents of the application materials need to be verified according to law, the municipal quality supervision department will assign two or more inspectors to conduct on-site verification. The licensee shall, in accordance with the requirements of the implementing organ, make good preparations for supervision and inspection.

(6) Flowchart

Special link

not have

Fourth, the handling place

Quality supervision window in the west hall on the second floor of municipal administrative service center

Verb (abbreviation of verb) processing time limit

5 (working days)

Intransitive verb processing mechanism

Municipal Bureau of Quality and Technical Supervision

Seven. service charge

be free of charge

Eight. the basis of law

Management Rules for the Use of Special Equipment (20 17)

3.8.4 When the name of the user or the property right unit changes, the user or the property right unit should hold the original use registration certificate and the certificate of name change of the unit to fill in the use registration form again (in duplicate), and go to the registration authority to change the name and get a new use registration certificate. If more than 2 sets are replaced in batches, the treatment can be simplified. The registration authority shall indicate the cancellation on the original use registration certificate and the original use registration form.

Management Rules for the Use of Special Equipment (20 17)

3.8.5 Change of the use unit that continues to be used after reaching the designed service life. If the special equipment continues to be used after reaching the designed service life, the user shall apply to the registration authority for change registration with the original use registration certificate and relevant certification materials handled in accordance with Article 2. 14 of these Rules. The registration authority shall mark the words "beyond the designed service life" on the upper right of the original use registration certificate.

Management Rules for the Use of Special Equipment (20 17)

3.8. 1 After the transformation of special equipment is completed, the user shall submit the original use registration certificate, re-filled use registration form (in duplicate), transformation quality certificate and transformation supervision and inspection certificate (if supervision and inspection are needed) to the registration authority before or within 30 days after it is put into use, apply for change registration and obtain a new use registration certificate. The registration authority shall indicate the cancellation on the original use registration certificate and the original use registration form.

Management Rules for the Use of Special Equipment (20 17)

3.8.2 Relocation and change 3.8.2. 1 When special equipment is moved within the administrative area of the registration authority, the user shall submit the original use registration certificate, the re-filled use registration form (in duplicate) and the inspection report after relocation to the registration authority before putting it into use, apply for change registration and obtain a new use registration certificate. The registration authority shall indicate the cancellation on the original use registration certificate and the original use registration form. If 3.8.2.2 moves (1) special equipment across the administrative area of the registration authority, the user shall apply to the original registration authority for cancellation with the original use registration certificate and use registration form; The original registration authority shall cancel the use registration certificate, indicate the cancellation on the original use registration certificate and the original use registration form, and issue the Certificate of Change of the Special Equipment Use Registration Certificate to the user (see Annex E for the format); (2) After the relocation is completed, the user shall, before putting it into use, re-apply for use registration to the relocation registration authority with the change certificate of the Special Equipment Use Registration Certificate, the original registration form marked with cancellation and the inspection report after the relocation (demolition and relocation).

Management Rules for the Use of Special Equipment (20 17)

3.8.3 Unit change (1) If the user of special equipment needs to be changed, the original user shall go to the registration authority to handle the change with the original use registration certificate, use registration form and regular inspection report within the validity period; Or the property right unit holds the property right certificate to the registration authority for the change of the original use registration certificate, use registration form and periodic inspection report within the validity period; The registration authority shall cancel the original use registration certificate and the original use registration certificate, and issue a certificate of change of the special equipment use registration certificate; (2) A new user shall, in accordance with the requirements of 3.4 and 3.5 of these Rules, re-register the use of special equipment with the certificate of change of the special equipment use registration certificate, the original use registration form marked with cancellation and the periodic inspection report within the validity period.

Management Rules for the Use of Special Equipment (20 17)

3.8 If a set (set) of registered special equipment is modified, installed, changed or renamed and continues to be used after reaching the designed service life, and the special equipment registered by the unit is changed or renamed, the relevant unit shall apply to the registration authority for change registration. The registration authority shall handle the change registration in accordance with the provisions of 3.8. 1 to 3.8.5 of these Detailed Rules. When handling the change registration of special equipment, if the relevant data in the product data sheet of special equipment changes, the user shall fill in the product data sheet again. After the change registration, the equipment code of special equipment remains unchanged.

The fourth round of administrative examination and approval adjustment catalogue of Guangdong Provincial People's Government (2009 edition)

Full-text clause form

Guangdong Province Special Equipment Safety Regulations (20 15)

Twenty-second before the special equipment is put into use, the use manager shall go through the use registration with the special equipment safety supervision and management department and obtain the use registration certificate.

To apply for registration of the use of special equipment, the following conditions shall be met:

(a) the applicant is the manager of the use of special equipment;

(two) the applicant employs qualified personnel to engage in the management and operation of special equipment in accordance with the regulations;

(three) the design, manufacture, installation and transformation of special equipment meet the requirements of relevant laws and regulations, special equipment safety technical specifications and standards.

If it is a complete set of equipment or units that need to be debugged, the use manager can go through the use registration formalities within 30 days from the date of putting it into use.

Guangdong Province Special Equipment Safety Regulations (20 15)

Twenty-third special equipment renovation, repair, in accordance with the provisions of the need to change the use of registration, or the use of special equipment managers change, it should go through the formalities of change registration.

Regulations on Safety Supervision of Special Equipment (2009)

Article 25 Before special equipment is put into use or within 30 days after it is put into use, users of special equipment shall register with the safety supervision and administration department of special equipment of the municipality directly under the Central Government or the city divided into districts. The registration mark shall be placed in or attached to a prominent position of special equipment.

Law of the People's Republic of China on Safety of Special Equipment (20 14)

Thirty-third units using special equipment shall, before the special equipment is put into use or within thirty days after it is put into use, go through the use registration with the department responsible for the safety supervision and management of special equipment and obtain the use registration certificate. The registration mark shall be placed in a prominent position of special equipment.