How to write a work rectification notice

#书 Letter# Introduction When problems are detected in the work, the relevant departments will require rectification, and a rectification notice will be issued when the rectification is made. Below is how to write a work rectification notice that has been compiled and shared. You are welcome to read and learn from it. I hope it will be helpful to you!

Part 1

Project Department:

After inspection, your department has the following safety hazards during the project construction process. Please carefully check after receiving this notice. Make rectifications in a timely manner:

1. Failure to establish a safety management organization or assign full-time safety production management personnel in accordance with regulations.

2. Project managers, safety officers and other safety production management personnel are not on site to supervise the construction of sub-items.

3. Project leaders, full-time safety production management personnel, operators or special operations personnel engage in relevant work without safety education and training or without passing the assessment.

4. In the construction organization design, safety technical measures, temporary power supply plan or special construction plan for the construction site are not prepared, or the construction organization design is not approved.

5. The technical requirements for safe construction were not explained in detail before construction or were not signed and confirmed by both parties. □Special operations personnel are assigned to work without receiving special safety operation training and obtaining special operation qualification certificates in accordance with regulations.

6. Failure to provide employees with labor protection supplies that comply with national standards or industry standards.

7. Failure to set up obvious safety warning signs at dangerous parts of the construction site or failing to set up fire escapes, fire water sources, fire fighting facilities and fire extinguishing equipment at the construction site in accordance with relevant national regulations.

8. The construction site is not laid out in accordance with the company’s CI information requirements.

9. Temporarily constructed buildings at the construction site do not meet the requirements for safe use, such as bamboo sheds, asbestos tiles, and linoleum. □ No special protective measures have been taken for adjacent buildings, structures and underground pipelines that may be damaged due to construction.

10. No closed enclosure is implemented at the construction site of the construction project or the enclosure setting does not meet the specification requirements.

11. Failure to comply with relevant environmental protection laws and regulations has resulted in dust, waste gas, waste water, solid waste, noise, vibration and construction lighting at the construction site causing harm and pollution to people and the environment.

12. The canteen and drinking water sanitation are poor; there are no first aid measures and first aid equipment.

13. Scaffolding materials that do not meet the requirements are used at the construction site.

14. The foundation of the floor-standing scaffolding poles is uneven and not solid; there is a lack of bases and pads; there are no sweeping poles or drainage measures.

15. The number of ties between the scaffolding frame and the building structure is insufficient; the ties are not strong and irregular.

Regarding the above hidden dangers, please complete the rectification and follow-up investigation within x days after receiving the notification.

Signing person:

Signing time:

Note: This form is made in triplicate, with one copy kept by the project department and two copies kept by the company.

Chapter 2

Wang xx Labor Contracting Team:

You have the following quality and safety hazards. After receiving this notice, you must formulate a rectification plan for the hazards and Measures shall be taken and the responsible person shall be determined to make rectifications within a time limit.

In the rectification notice we sent to you on February 18, the notice has been issued regarding the problem that the cantilever frame is not fully paved with scaffolding boards, and that the cantilever frame is not pulling the wire rope and erecting the protective overhang. It's been half a month since I posted it, but I still haven't seen your rectifications in place

On February 27, I discovered that you had built an unloading platform privately on the 11th floor. The management staff urged you to dismantle it many times, but you still didn't dismantle it.

The protection for stairs and openings above the 10th floor and the edge protection on the second floor of the podium are not in place, and the installation between the floor frame and the overhang is not fully installed, which poses a huge safety hazard

Safety issues cannot be ignored. Please do the above work before pouring the fourteenth layer of concrete. Otherwise, you will not be allowed to pour concrete. If you use forced and brutal construction, you will be responsible for all the consequences.

Signature of the person in charge of the operation: year, month, day

Signature of the person in charge of the labor contracting team: year, month, day

Signature of the inspection unit and person in charge: Year, month, day< /p>

Project manager signature: year, month, day

Guiyang County Quality Inspection Center Project

March 5, year