Indoor renovation contract Entrusting Party (Party A) Agreement 1:
Organizer (Party B):
Through friendly negotiation between Party A and Party B, Party A decides to entrust Party B to decorate the living room. In order to ensure the smooth progress of the project, this contract is hereby signed in accordance with relevant national laws and regulations for * * * * to abide by.
Article 1: Project Overview
I. Project address:
II. Room Specification: Room type _ _ _ _ _ _ _ _ _ square meters. (Attachment:)
Three. Construction content: See Annex I List of Home Decoration Construction Projects, construction drawings and renderings. See for details.
Four. Mode of entrustment: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Verb (abbreviation of verb) commencement date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Article 2: Project Price
The project price * * * is _ _ _ _ _ _ _ _ _ _ _ _ _ _ (amount in words) _ _ _ _ _ _ _ _ _.
Article 3: Quality Requirements
1. The main materials used in the project shall be purchased by Party A, and their varieties, specifications and names shall be approved by both parties.
Second, the project acceptance criteria, the two sides agreed to refer to the relevant provisions of national and industry standards.
Three. During the construction, if Party A has special construction projects or special quality requirements, both parties shall confirm in writing, and a supplementary contract shall be signed for the increased expenses.
4. All materials and equipment shall be purchased by Party A, and the product quality shall be the responsibility of Party A; Party B shall be responsible for the quality of the project.
Verb (abbreviation of verb) Party A entrusts _ _ _ _ _ _ _ _ to supervise all construction activities and project quality of Party B, and Party B agrees to accept the supervision and management of _ _ _ _ _ _ _ _ _ _.
Article 4: Supply of Materials
The materials required for this project are purchased by Party A. Party B is entrusted by Party A to be responsible for the material management.
_ _ _ _ _ _ _ _ _ to supervise.
1. Party B shall submit a written material procurement plan to Party A according to the construction drawings confirmed by Party A, specifying the types, specifications and quantities of materials required.
2. Party A shall purchase materials according to the plan submitted by Party B. The materials provided by Party A shall be used for the decoration project specified in this contract, and shall not be used for other purposes without Party A's consent. ..
Three. Party A entrusts _ _ _ _ _ _ _ _ to supervise the storage and use of materials.
Article 5: Method of Payment
1. Party A shall pay the project price to Party B according to the progress of the project.
Party A shall pay the project price to _ _ _ _ _ _ _ _ _ _ for safekeeping according to the progress of the project, and entrust _ _ _ _ _ _ _ _ _ _ _ to pay Party B on schedule.
2. Party A's late payment is a breach of contract, and Party B has the right to stop the construction. Unfinished work after acceptance
Cheng price, shall not be delivered for use. After the acceptance of the project, Party B proposes the project settlement to Party A and sends relevant materials to Party A. ..
Three. Party A and Party B agree that Party A shall entrust _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Pay for supervision. The specific way is as follows:
1、
2、
3、
Article 6: Construction Period
1. If the construction period is delayed due to Party B's reasons, Party A shall pay 1% of the total project price as liquidated damages every day. If the completion is delayed due to Party A's reasons, Party B shall be paid 1% of the total project price for each day of delay.
2. If the unqualified materials and equipment selected by Party A affect the project quality and time limit for a project, Party A shall bear the cost of rework, and Party B shall bear the cost of rework for quality accidents caused by Party B's construction, and the time limit for a project remains unchanged.
Three, in the construction, due to engineering quality problems, the two sides disagree and cause work stoppage, not as a punishment for delaying work or time limit for a project, both sides should take the initiative to ask the relevant departments to coordinate and deal with it, and solve the dispute as soon as possible, so as to continue the construction.
Article 7: Other matters
I. Responsibility of Party A
Party A entrusts _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
II. Responsibility of Party B
1. Assign a staff member as the site representative of Party B to be responsible for the performance of the contract, organize the construction according to the requirements of the contract, complete the construction task on time with good quality and quantity, and transport the garbage generated from the construction out of the site.
2, responsible for the safety of the construction site, beware of fire, show certificates, civilized construction, to prevent the construction caused by pipeline blockage, water leakage, power failure, damage and other accidents affect others. If it happens, it must be repaired or compensated as soon as possible.
3. Party B shall take full responsibility for the casualties of Party B's personnel and those around the construction site caused by the project construction.
Article 8: Liability for breach of contract
After the contract comes into effect, during the performance of the contract, the party that terminates the contract without authorization shall pay the other party 20% of the total contract amount as liquidated damages. If the actual loss caused to the other party by the unauthorized termination of the contract exceeds the liquidated damages, it shall be compensated.
Article 9: Settlement of disputes
In case of any dispute during the performance of this contract, both parties shall settle it through consultation without affecting the project progress. If both parties are unwilling to settle the matter through negotiation, or negotiation fails, they may bring a lawsuit to the people's court where Party A decorates the house.
Article 10: Modification and Termination of the Contract
1. After this contract comes into effect after being signed by both parties, both parties must strictly abide by it. If either party needs to change the contents of the contract, it shall sign a supplementary agreement after both parties reach an agreement through consultation. If it is necessary to terminate the contract, the party who proposes to terminate the contract shall do so in writing, and pay a penalty of 65,438+00% of the total contract price, and go through the termination procedures.
2. In the process of construction, if either party proposes to terminate the contract, it shall submit it to the other party in written form. After both parties agree to go through liquidation procedures and conclude an agreement to terminate the contract, the contract shall be deemed to be terminated.
Article 11: After the completion of the project, Party A shall conduct acceptance according to relevant national standards, and after passing the acceptance, entrust _ _ _ _ _ _ _ _ to pay the balance to Party B..
Article 12: The renovation warranty period is two years from the date of delivery. During this period, if there are any quality problems, Party B shall be responsible for maintenance.
Article 13: Entry into force of the contract
1. This contract shall come into effect after being sealed by both parties.
This contract is made in duplicate, one for each party.
Party A (signature): Party B (signature):
ID number: ID number:
Address: Address:
Tel: Tel:
Date of signature: year month day.
Date of signature: year month day.
2 Party A's indoor renovation contract agreement:
Party B:
According to the Economic Contract Law of the People's Republic of China and relevant regulations, Party A entrusts Party B to decorate the factory. In order to finish the renovation on time and according to the quantity, and define the rights, obligations and responsibilities of both parties in the process of project construction, both parties have reached the following agreement through friendly negotiation on the basis of equality and mutual benefit for mutual compliance.
I. Projects
1. Project name: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
2. Project: Partition wall
Second, the project production and content
1, factory, partition 75 keel main frame, 6mm cement board 1 floor, fireproof cotton 1 floor.
2. Contracting method: contracting for work and materials.
Three. Unit price of engineering decoration: _ _ _ _ _ _ _ _ _ _.
Four. Comprehensive price of engineering decoration: about RMB _ _ _ _ _ _ _ _
Verb (abbreviation of verb) settlement method: based on actual engineering quantity.
The responsibilities of both sides of intransitive verbs:
(I) Party B's responsibilities
1. Party B shall carry out the installation according to the routine requirements of the factory and complete the project with good quality and quantity.
2. No beating at the construction site and no gambling at the workplace.
3. Ensure that the project is completed on time and in quantity.
4. Party B shall enter the site on time according to the time specified by Party A, and Party B shall enter the site on _ _ _ _ _ _ _ _ _.
(II) Party A's responsibilities
1. Provide water and electricity for all floors of Party B to ensure that there are no major obstacles in the workplace. If the project cannot be completed due to Party A's reasons, Party B shall not be held responsible.
2. During the construction process, Party A shall cooperate with Party B's requirements so that the project can be completed on time; Pay the engineering quantity on time according to the progress of the project.
Terms of payment for intransitive verbs
After the signing of this contract, Party A shall pay Party B RMB _ _ _ _ _ _ _ _ _.
Seven. responsibility for breach of contract
Except for irresistible external factors, neither party shall violate the terms of the contract, otherwise the breaching party will bear economic losses.
Eight. any other business
1. During the execution of this agreement, if one party fails to perform the agreement and causes economic losses, the breaching party shall be responsible for compensating all losses.
2. This agreement shall come into effect after being signed and sealed by both parties.
3. This Agreement is made in duplicate, one for each party, and any alteration is invalid.
Party A (signature): Party B (signature):
ID number: ID number:
Tel: Tel:
Twenty years, twenty years, twenty years.
Agreement III of Entrusting Party (Party A) for Indoor renovation contract:
Organizer (Party B):
Engineering project:
Through friendly negotiation between Party A and Party B, Party A decides to entrust Party B to decorate the facade house. In order to ensure the smooth progress of the project, in accordance with relevant national laws and regulations, this contract (including its annexes and all supplementary contracts) is hereby signed for * * * to abide by.
Article 1: Project Overview
1, project address: _ _ _ _ _ _ _
2. The construction area is _ _ _ _ square meters.
3, the construction content:
1), the removal of the intermediate partition wall shall not affect the original fire fighting and load-bearing columns and beams of the main structure.
2) Decorate the ceiling, dado, floor tile, wood floor and decorative lines of the whole hall without destroying the original ceiling.
3) Add a private room and decorate the hall.
4) Party B shall reasonably plan and decorate the kitchen according to Party A's requirements.
5) The billboard and bar on the facade shall be decorated according to Party A's wishes.
6) A vegetable washing pond, fish pond and sunshade shall be built behind the kitchen.
7) Improve all water and electricity facilities in the store.
4. Project Commencement Date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
5. Project completion date: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Total days of the project: _ _ _ _ _ _
Article 2: Project Price
Project Price (amount in words) _ _ _ _ _ _.
Article 3: Quality Requirements
Party B's construction must be carried out in strict accordance with Party A's requirements.
Article 4: Method of Payment
After the project is completed and accepted by Party A, all the money shall be paid.
Article 5: Liability for breach of contract
1. Party B must complete the project within the project period, otherwise Party A has the right to refuse to pay the project payment and hold Party B accountable.
2. If Party B's construction does not meet the quality requirements, Party A has the right to order Party B to take full responsibility.
Article 6: Modification of the Contract
After this contract is signed by both parties, both parties must strictly abide by it. If either party needs to change the contents of the contract, it shall sign a supplementary agreement after both parties reach an agreement through consultation.
Article 7: Entry into force of the contract
1. This contract shall be sealed by both parties and come into force after being signed.
2. This contract is made in duplicate, with each party holding one copy.
Party A (Owner): (Signature) Party B: (Signature)
Tel: Tel:
Date of signing:
4 Party A's indoor renovation contract agreement:
Party B:
Party A entrusts Party B to undertake the construction and installation tasks of this project. In order to clarify the rights and obligations of both parties, combined with the specific conditions of this project, Party A and Party B sign this contract on the basis of voluntariness, equality and good faith through consultation.
I. Project Overview and Costs
1, project name:
2. Project location:
3. Building structure: living room
4. Building area: Building area:.
5. Contents of decoration construction: See Annex 1 "Table of Decoration Construction Contents".
6. Contracting method: (contracting for work and materials, contracting for work and materials, and partial contracting).
7. Total price: RMB (in words): RMB. In which: design fee: yuan, management fee: yuan.
Material cost: yuan, labor cost: yuan.
Tax: RMB, other expenses: RMB.
The contents of engineering construction and installation shall be subject to the items in the engineering quotation signed by both parties; The project cost is based on the unit price in the project quotation signed by both parties. The settlement shall be made according to the actual project quality, and the increase or decrease of the project shall take effect after consultation between both parties.
8, time limit for a project:
Starting from _ _ _ _ _ _ _ _
Two. Party A's work
1. Before the start of construction, all or part of the house should be vacated, and the obstacles affecting the construction should be clearly understood. For houses that can only be partially vacated, Chen X and others take protection and resettlement measures. If Party A fails to take necessary protection and resettlement measures, the losses of the house and Chen X shall be borne by Party B. ..
2. Provide Party B with water, electricity and other facilities required for construction.
3. Assist Party B to handle the formalities of construction application and approval, and be responsible for paying all expenses submitted for approval by the Property Management Office.
4. Supervise and inspect the project quality and progress, and handle the acceptance and settlement in time.
5. If Party A appoints personnel to participate in or supervise the project construction, Party A shall acknowledge the behavior of the personnel appointed by Party A. ..
6. Timely perform other assistance obligations of Party B..
Three. Party B's work
1. Party B shall send full-time on-site project supervisor to be responsible for the performance of the contract, organize the construction according to the contract requirements, and complete the construction tasks on time with good quality and quantity; Solve all matters that Party B is responsible for.
2. Strictly implement the construction specifications, safety operation procedures and fire safety regulations, and be responsible for fire safety on the construction site.
3, in strict accordance with the drawings or instructions signed by both parties for construction, completes the quality inspection and construction records.
4. Be responsible for protecting the site facilities and building products before the project is handed over to Party A upon completion.
Fourth, the project price and settlement
1. Payment method of project funds:
(1), the project payment shall be paid according to the following table.
Project payment schedule
Both parties agree to take the quotation sheet as the basis of the unit price and quantity of this project, and the actual quantity shall prevail in settlement. Receipts should be issued for both parties' capital transactions.
Verb (abbreviation of verb) agreement on the responsibilities of both parties
1. Party A's responsibilities:
If the construction period is affected due to Party A's reasons, the construction period shall be postponed accordingly, and it shall be borne by itself.
C,
d、
Losses caused to Party B by clauses E and F;
A, unable to supply water and electricity on schedule and on time;
B, can't guarantee the daily working hours from 10 hours (including overtime);
C, unable to provide self-purchased materials and equipment on schedule;
D, provided materials and equipment do not conform to the quality or specifications, resulting in rework;
E, can't pay the project payment on time.
F, design changes and waste of materials and labor caused by design changes;
G. If the contract is terminated due to Party A's overdue acceptance, and the quality of the construction project is less than half, Party B shall charge the project design fee in addition to the construction cost; Other unforeseeable reasons not caused by Party B. ..
2. Party B's responsibilities:
A. Failure to start work on schedule or stop work for no reason in the middle will affect the construction period, and the construction period will not be postponed, and the corresponding losses shall be borne by Party B;
B. Party B shall repair the quality problems found in Party B's construction and installation within two years after the completion acceptance;
C. Personal injury caused by Party B's violation of operating rules during construction shall be borne by Party B;
D. If Party A's articles are damaged due to Party B's construction, Party B shall repair or compensate them;
E. Party B shall be responsible for the fines and compensation caused by Party B's violation of the regulations of the Property Management Office.
Six, project quality and acceptance
1. Party B must construct and install in strict accordance with the drawings signed by Party A. ..
2. During the construction, if Party A proposes to change the design, increase or decrease the project, it shall notify Party B in time.
3. Before the concealed works are concealed, Party B shall notify Party A to be present for acceptance, and Party A will not accept them within two days. After self-inspection, Party B can conceal and truthfully fill in the concealment records, and Party A will approve them.
4. After the project is completed, Party B shall notify Party A for acceptance. Party A shall handle the acceptance and handover procedures within two days after receiving the notice. If Party A fails to accept the goods within the specified time, it shall promptly notify Party B in writing and set another acceptance date; Party A shall recognize the first notification time XX as the completion date.
5. After the project is completed and Party A pays off the project mantissa, Party A and Party B sign the project warranty. At the same time, Party B shall provide the as-built drawings and carry out the warranty according to the warranty form, and the warranty period shall be calculated from the date when the completion acceptance is qualified.
Seven. responsibility for breach of contract
1. If the construction period is delayed or stopped halfway due to Party A's reasons, in addition to delaying the construction period, Party A shall also compensate Party B for the losses caused by the shutdown or slowdown, and Party A shall pay RMB to Party B for each day of shutdown or slowdown; If Party A fails to prepay the project payment as agreed in the contract, it shall pay a late fee of% of the project payment for each day overdue.
2. If the completion is overdue due to Party B's reasons, Party B shall pay the fees according to the number of days overdue.
3. If the project fails to go through the acceptance formalities, Party A uses it in advance or without authorization, and the losses caused shall be borne by Party A, which shall be deemed as the actual acceptance of Party A..
4. If one party cannot continue to perform the contract due to reasons, it shall notify the other party to handle the contract termination agreement, and the responsible party shall compensate the other party for the economic losses caused thereby.
Nine, decoration engineering quotation signed by both parties, construction drawings and other specific matters reached by both parties through consultation, as attachments to the contract, have the same effect as the contract.
X this contract is made in duplicate, one for each party.
Attachment:
A, decoration engineering quotation
Second, the design and construction drawings
Three. Supplementary Agreement (effective after being signed by Party A's representative and stamped with Party B's official seal)
Except for the terms of the contract and the above supplementary contents, any other verbal commitments shall not be used as the basis for construction and settlement.
Party A: (Signature) Signature of Party B:
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Indoor renovation contract Agreement 5 Entrusting Party (Party A):
Contractor (Party B):
Engineering project:
Through friendly negotiation between Party A and Party B, Party A decides to entrust Party B to decorate the living room. In order to ensure the smooth progress of the project, a contract is signed according to relevant national laws and regulations for both parties to abide by. Article 1 General situation of the project:
1, project address:
2, room specifications:
3. Contracting method: contracting for work and materials.
4. Construction content: See the annex to this contract for details of the construction content.
5. Project start date:
6, project completion date:
7. Total days of the project: days. Article 2 Total project price:
Total project price:, payment method: one-time payment.
Article 3 Quality requirements:
1. The varieties, specifications and names of the main materials used in the project shall be approved by both parties.
2. The acceptance criteria of the project shall be implemented with reference to national regulations.
3. In the process of construction, if Party A adds any construction project, both parties shall confirm to sign the contract for the increased cost.
4. Party A is responsible for the quality of materials, equipment and products purchased daily, and Party B is responsible for the construction quality.
Party A: Date:
Party B: Date: