The main line of the urban Huanshan Expressway is connected
The urban Huanshan Expressway project starts from the intersection of Keji Road and Shichang Avenue and ends at the starting point of the current Huanshan Road west of Jiangjiazhai Interchange , has been under construction since June 2017 and has lasted nearly two and a half years. It is the largest one-time investment highway project in our city. On December 13, 2019, the project was completed on the main line, playing an important role in improving the city's regional road network structure, easing traffic pressure in the central city, and promoting regional economic and social development.
Brunei Expressway
The Brunei Expressway is an important part of the "Eight Links" in Shandong Province's "Five Vertical, Four Horizontal, One Ring and Eight Links" expressway network. It is expected to be completed in 2020 The Weihai section of the main line will be completed. By then, the journey from Weihai to Jinan will be reduced by at least half an hour. In 2019, the subgrade engineering, culvert engineering, and tunnel excavation engineering of the Brunei Expressway Project have been 100% completed, and the road surface engineering has been completed 46.4% ahead of schedule, exceeding the annual target.
Renovation of the Heping Road parking lot?
The Heping Road parking lot is located in Weihai Municipal Hospital. It used to be a "long-standing problem" for ordinary people to park and go to the doctor. Construction of the Heping Road parking lot started on May 11, 2019, and 60% of the total project volume has been completed. The project is expected to be completed and put into use by the end of 2020.
Western Huanshan Road
The Western Huanshan Road runs through the entire western mountainous area of ??our city, mainly located in Wendeng District, Rushan City, and the northwest mountainous area of ??the High-tech Zone. It passes through 8 towns, 118 villages and a A large number of ecological landscape areas, beautiful villages, pastoral complexes, and rural revitalization model areas, together with the Eastern Ring Road, form an 800-kilometer Weihai-wide mountain and sea landscape ring road, which can achieve smooth traffic, rural revitalization, town economic development, and all-region tourism. , The full integration of strengthening villages and enriching people is a major livelihood project that benefits the people. The project strives to open all lines by the end of 2020, and the overall construction of the project will be completed in May 2021. At present, the construction of the Western Ring Mountain Road is accelerating, and 67.9 kilometers of new reconstruction, renovation and improvement have been completed.
Rushankou Bridge
On October 27, 2019, the Rushankou Bridge project was officially launched. The Rushankou Bridge project is the largest span sea-crossing suspension bridge in our province. It is an important part and landmark project of our city’s sea-ring tourist highway. It is also the bridge project with the longest span, highest standard and largest investment in the history of our city’s highway construction. The starting point of the project is located in Maotouzui, Dashan City, Rushan City, and the end point is the starting point of the G228 Dandong Line in Yantai Haiyang City. The total length of the route is 4.01 kilometers.
This article comes from the author of Autohome Chejiahao and does not represent the views and positions of Autohome.