Roof waterproofing construction specifications

Roof, toilet and bathroom storage and water spray test sampling inspection record sheet Project name ×× County Center Building Waterproofing Project Bathroom 851 Paint Waterproofing Sampling Inspection Number 1 Construction self-report storage and water spray test completion status has been 24 hours Water storage test, water storage and spraying test records, one copy of the water storage test record, completion date of the water storage and spraying test, November 5, 2003, supervision station sampling inspection record, waterproof project floor unit number, location, water storage and spraying time, inspection results, roof floor Bathroom 204 on the second floor passed from 8:00 on November 4 to 8:00 on the 5th. Bathroom 301 on the third floor passed from 8:00 on November 4 to 8:00 on the 5th. Bathroom 403 on the fourth floor passed from 8:00 on November 4 to 8:00 on the 5th. 5 The bathroom on floor 501 passed from 8:00 on November 4 to 8:00 on November 5. The bathroom on floor 608 passed from 8:00 on November 4 to 8:00 on November 5. The bathroom on floor 705 passed from 8:00 on November 4 to 8:00 on November 5. / / Participate Opinions of the unit The person in charge of the project of the construction unit: Signature that meets the requirements: November 5, 2003 Person in charge of the construction (supervision) unit: Signature that meets the requirements: November 5, 2003 Sampling inspection personnel at the supervision station: Signature that meets the requirements: November 5, 2003 Department manager of the supervision station for daily storage and water spray test sampling results: November 5, 2003 Notes: 1. This table is made in triplicate, one copy each for construction, construction (supervision), and supervision stations. 2. Inspect the entire roof, and randomly inspect 15% of the total number of toilet and bath rooms.