Supplementary Agreement for Demonstration in renovation contract (I) Party A and Party B reached a supplementary agreement on the matters not covered in the Family Room Decoration Construction Contract signed on, through friendly negotiation.
1. During the construction of this site, Party B shall be responsible for the personal safety of the construction personnel.
2. Party B is responsible for the safety management, fire prevention and theft prevention of the construction site, and strictly manages the personnel entering the construction site. All kindling is prohibited in the construction site, and it is forbidden to make a fire or smoke in the construction site. Cooking must be done in the designated area.
3. Party B's construction personnel shall not use the installed sanitary wares, cookers and other facilities and equipment.
4. If Party B violates Articles 2 and 3, causing damage to Party A's facilities, equipment, living room and other parts and any other losses, Party B shall be responsible for compensation and bear all responsibilities.
5. During the construction period and warranty period of this project, if accidents such as pipeline blockage, water leakage, power failure and damage to articles occur in adjacent residents' houses due to construction quality problems, resulting in property losses, Party B shall be responsible for maintenance and compensation.
6. The warranty period of this project is two years, counting from the date of completion acceptance. During the warranty period, the warranty period shall be extended for damaged and repaired parts, but the longest period shall not exceed _ _ _ _ years, and all expenses during the warranty period shall be borne by Party B. ..
7. Party B shall respond within _ _ hours after receiving the repair call from Party A and arrive at the site within _ _ _ hours. If Party B's construction quality problems lead to repair, which cannot be solved within _ _ hours after Party A's repair, Party A may repair first, and demand compensation from Party B according to the loan interest rate of the People's Bank of China for the same period from the date when the repair fee is paid to the date when Party B actually performs the quality assurance responsibility.
8. In order to ensure the normal progress of the project, Party B must submit a list of materials required for the next process to Party A at least _ _ days in advance, and indicate the quantity of materials required. In actual construction, the loss of the material quantity shall not exceed _ _%.
9. When signing the contract, the specific construction plan, quantities and drawings are not determined, which shall be determined and submitted by Party B _ _ days before the project starts, and can only be started after being signed and confirmed by Party A. For the projects added by Party B itself and the parts that exceed _ _% of the quantities without Party A's confirmation, the expenses incurred and rework expenses shall be borne by Party B. ..
10. All materials, tools and instruments not listed in Party A's supply list in this contract are provided by Party B, and relevant expenses have been included in the total contract price.
1 1. The materials provided by Party A are sent downstairs, and Party B is responsible for carrying them upstairs for construction. The related expenses such as loading and unloading have been included in the total contract price.
12. Increase or decrease projects shall be settled in one lump sum after completion acceptance.
13. If the dispute cannot be settled through consultation, either party may bring a lawsuit to the people's court with jurisdiction according to the relevant provisions of China laws.
14. This agreement shall come into force as of the date of signature and seal by both parties or their authorized representatives.
15. This agreement is made in duplicate, with each party holding one copy, which has the same effect.
This Supplementary Agreement was signed on _ _ _ _ _.
Party A: Party B:
Legal representative or authorized representative:
Model Supplementary Agreement of renovation contract (II) Employer: (hereinafter referred to as Party A)
Contractor: (hereinafter referred to as Party B)
Through equal consultation, Party A and Party B unanimously agree to sign the following clauses as amendments and supplements to this contract.
1. Supplementary agreement on points (1), (7) and (10) of Party B's contracting scope:
1. Party B shall undertake the engineering construction below plus or minus zero and above 1.5 (less than or equal to 1.5).
2.(7) The exterior wall coating is water-based.
3.( 10) Party B is only responsible for the insurance premium and health management fee during the construction period, and other expenses (such as laboratory testing fees, salaries of technical management personnel, etc.) and all taxes and fees shall be borne by Party A. ..
Party B is only responsible for the construction of Building B, while Party A is responsible for the rigid waterproofing of the roof and all construction materials, files and procedures.
II. Supplementary Agreement to Article 3 of the Contract:
Due to the price increase, Party A changed the original 700 yuan/㎡ to RMB/㎡, and paid the project contract money to Party B (cash settlement).
Three. Supplementary Agreement to Paragraph 4 of Article 8 of the Contract:
If Party B stops work due to Party A's incomplete procedures or other reasons, Party A must pay all the wages, machinery fees and other losses of migrant workers to Party B. ..
1. This agreement and its annexes are an integral part of the contract. In case of conflict between this supplementary agreement and this contract, this agreement shall prevail.
2. This agreement is made in duplicate and will take effect immediately after being signed by both parties.
Party A:
Party B:
date month year
Model Supplementary Agreement of renovation contract (III) Party A:
Party B:
Party A and Party B have reached the following supplementary agreement on house decoration through negotiation:
1. Party B shall not subcontract Party A's renovation project or subcontract it in disguised form.
2. Party B shall distribute materials according to the name and quantity of materials listed in the budget signed by Party A, and all materials entering the site can only be used for decoration construction after acceptance and confirmation by Party A or its customers. If there is a shortage of materials, Party B shall make up for it in time, and the project manager and construction personnel shall not buy another material to replace it.
Third, remove the residue in time to avoid blocking the sewer system or affecting other construction and quality.
4. For the project under construction, if Party A thinks that the design is unsatisfactory, or the construction technology and quality are unqualified, Party A has the right to ask Party B (the construction personnel) to stop the construction, and negotiate with Party B's project leader to optimize the project, or directly ask the construction personnel to change the construction method on site and carry out the construction according to the new requirements. The increased project cost due to design change shall be paid by Party A appropriately.
Five, the wall slotting line slotting project must be neat according to the wire cutting, and the new wall should be reserved with trunking, and the method of slotting after wall first cannot be adopted.
Six, the bathroom application finely slag backfill, protect the buried hot and cold water pipes.
Seven, all water pipes are hot water pipes. After installation, conduct a 24-hour pressure test under the specified pressure (10kg) to check the tightness of the water pipe.
Eight. Legal liability
If Party B subcontracts the renovation project in violation of the first paragraph of this agreement, Party A has the right to terminate the contract, and Party B shall pay Party A liquidated damages, which is 20% of the total amount of the contract subject matter. Party A has the right to deduct 2% of the total contract price for each violation by Party B of other agreements in this Supplementary Agreement.
This agreement is made in duplicate, one for each party, and each copy is equally authentic.
Signature of Party A: Signature of Party B (signature and seal):
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Model Supplementary Agreement of renovation contract (IV) Party A: (hereinafter referred to as Party A)
Party B: (hereinafter referred to as Party B)
The signing of this contract has made a necessary understanding of Party B's decoration subcontracting project, accepted the present situation of the construction site and living quarters provided by Party A, and fully understood the relevant regulations. Party B is willing to sign this agreement with Party A for this subcontracted project. According to Party A's relevant requirements and defined scope of work, Party B agrees to organize personnel to enter the site on time according to Party A's relevant requirements, and strictly implement Party A's construction schedule for this project.
In accordance with the Contract Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC) and other relevant laws and administrative regulations, and following the principles of equality, voluntariness, fairness, honesty and credibility, Party A and Party B have reached an agreement on the construction project of this project through careful consultation, and this contract is concluded as the contract document of both parties.
I. Scope of Project and Contract
? Project name:? Project address:? Work content: bricklaying, plastering of internal and external walls, plastering of external walls, cement mortar leveling layer, etc. (The contract scope is allocated according to the number of Party B)
Second, the unit price adjustment:
(1) masonry engineering
1. Lime-sand bricks and refractory bricks (including sporadic and different wall thicknesses and layers, and including masonry Rachel bars): unit price/block. (According to the dimensions shown, 1/4 brick wall is 32 blocks /m2, 1/2 brick wall is 64 blocks /m2, 3/4 brick wall is 96 blocks /m2, 1 brick wall is 128 blocks/m2) The m2 cutter is not allowed to cut or block bricks in the floor. )
(2) interior wall plastering
1. Interior wall and cylinder plastering: the price is calculated in square meters according to the dimensions shown in the figure, and the unit price is /m2. If the project requirements cannot be met for some reason, the settlement shall be made according to the original contract (basement, floor and shops will not be charged separately). Note: Interior wall plastering includes the bottom and inside of balcony beam (including all tools except hanging cage).
(3) Buildings and floors
1. Floor roof leveling layer (including calendering): unit price is /m2.
2. Kitchen and bathroom (concealed water test): 6 yuan /m2 shall be leveled and calendered for the first time, 6 yuan /m2 shall be used for the second time, and 40 yuan /m3 shall be backfilled with ceramsite in the bathroom.
3. Stair steps, cement mortar surface of rest platform, skirting bricks, anti-skid strips (including chiseling and cleaning): (double-run 800 yuan/floor)
(4) External wall:
1, external wall brick (including external wall base plastering, etc.). ): the unit price is RMB/m2, (including 1-5 external wall plastering and net hanging, the unit price is 26 yuan/m2). If the project requirements cannot be met for some reason, the settlement shall be made according to the original contract.
2. Secondary structural reinforcement planting: the unit price of φ 10 is 2.00 yuan/root, and the unit price of φ 12 is 2.50 yuan/root.
(5) Basement
3. Fine stone concrete is poured on the basement floor, and the pressing surface is RMB/m2; Calculated according to the actual horizontal projection area (the collection well and sedimentation tank are calculated according to the projection area, and the side wall area is not calculated separately; Drainage ditch (according to the development area) includes all ditches, collecting wells, etc. ).
4. Work contents include but are not limited to:
Ground cleaning, galling, slurry sweeping, mortar preparation, ash cake making, mortar transportation, cement mortar (fine stone concrete) leveling, cement mortar corner protection, placing steel mesh, flattening or calendering, cutting separation joints, caulking, curling, etc. (Dismantle the jack-up support frame of tower crane foundation and finish the construction after the people and goods elevator).
(6) Roof engineering
1, roofing cement sand leveling layer (calendering) and protective layer, 28 yuan/㎡. (Covered with foam board)
2. Work contents include but are not limited to:
Cleaning, cleaning layer, sweeping base cement slurry, mixing mortar, transporting mortar, leveling cement mortar, making ash cake, laying thermal insulation materials, vertically and horizontally setting PVC exhaust pipes, placing steel mesh, rubbing fine stone concrete to find slope layer, cutting separation joints and caulking, laying foam board, cement sand batch at the foot of wall, sealing cement mortar in drainage ditch, and cleaning roof.
3.siva covers the roof, and the base leveling is 26.00 yuan/㎡, covering tile is 30.00 yuan/㎡, and 56 yuan is/㎡.
4. Work includes, but is not limited to, cleaning, cleaning the surface, sweeping cement slurry at the grass-roots level, mixing mortar, transporting mortar, making ash cakes, leveling cement mortar, protecting waterproof mortar, nailing nails, hanging copper wires, lifting tiles, paving tiles, repairing damaged tiles after installing lightning protection technology, sealing cement sand in the drainage ditch, and cleaning the tile surface.
Note: The unit price, work content and settlement method of other contracts are all implemented according to the original contract.
Third, the validity of the contract.
This contract is made in duplicate, one for Party A and Party B respectively .. This contract shall come into effect from the date when the representatives of both parties sign and affix their official seals, and shall terminate on the date when all agreed contents are completed, the project price is settled and the warranty period expires;
Party A: Party B:
Signature of Party A's Representative: Signature of Party B's Representative:
Date: Date:
Model Supplementary Agreement of renovation contract (V) The Employer (hereinafter referred to as Party A): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
Contractor (hereinafter referred to as Party B): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
After friendly negotiation, Party A decides to entrust Party B with the house decoration. In order to protect the legitimate rights and interests of both parties, combined with the specific conditions of this project, the two parties reached the following agreement for common compliance.
I. Overview of the Project
1. Decorate the construction site:
2. House structure: living room with room type, with construction area of 100 m2.
3. Decoration construction content: See Annex I Decoration Construction Content Table for details.
4. Contracting method: _ _ _ _ _ _ (quantity contracting, contract settlement, partial contracting).
5. Duration: This project will start on _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
Second, the project price and settlement agreement
1. Total project price: RMB _ _ _ _ _ _ _, in words (RMB): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
2. The project payment method is as follows:
(1) The first time, the budget design was passed, and the date of signing the contract. Pay the deposit 10000 yuan, which will be deducted in the second payment.
(2) After signing the second contract, pay 50% of the total project cost before starting construction, totaling _ _ _ _ _ _ yuan.
(3) During the third construction, 40% of the total project cost will be paid according to half of the construction progress, totaling _ _ _ _ _ _ _ _ yuan.
(4) Pay 10% of the total project price on the day of the fourth completion acceptance, totaling _ _ _ _ _ _ _ yuan.
(5) The warranty period of this project is two years. After all the project funds are settled, Party A and Party B shall sign the project warranty, and the warranty period shall be calculated from the date of signing the completion acceptance.
Three. Material supply agreement
1. Materials supplied by Party A: See the quotation of decoration project in the contract for details. The materials and equipment that Party A is responsible for purchasing and supplying for this project shall be qualified products that meet the design requirements, and shall be supplied to the site on time, and Party B shall go through the acceptance formalities. If there is any quality problem or specification difference in the materials and equipment supplied by Party A, Party B shall promptly raise it with Party A in written form. If Party A still says that it will be used, Party A shall bear the responsibility for the engineering losses. After the materials supplied by Party A arrive at the site, they shall be kept by Party B after passing the acceptance. Party B may charge a storage fee for the materials provided by Party A, and the rate shall be determined by both parties. Party B shall be responsible for compensating the losses caused by improper storage.
2. The decoration materials and equipment purchased by Party B from Party A shall be used for residential decoration agreed in this contract, and shall not be used for other purposes without Party A's consent ... If Party B violates this regulation, Party B shall compensate Party A at twice the price of the misappropriated materials and equipment.
3. The materials and equipment provided by Party B shall not be used if they do not meet the quality requirements or have different specifications. If it has been used, Party B shall be responsible for the losses caused to the project. If the materials and equipment provided by Party B are fake and shoddy goods, Party A shall be compensated twice the price of the materials and equipment.
Four. Project quality and acceptance agreement
1. This project implements DBJ 08–62–97 Technical Specification for Residential Building Decoration Engineering and DB 31/T30–1999 Acceptance Standard for Residential Decoration Engineering, as well as other local standards and quality evaluation acceptance standards formulated by the municipal construction administrative department.
2. This project is designed and constructed by Party A..
3. If the quality of materials and equipment provided by Party A is not up to standard, which will affect the project quality, the cost of rework shall be borne by Party A, and the construction period shall be postponed. In case of quality accident due to Party B, the rework cost shall be borne by Party B, and the construction period shall remain unchanged.
4. In the process of construction, when Party A puts forward design modification opinions and adds or subtracts engineering projects, it should contact Party B in advance, and the project construction can only be carried out after both parties agree, thus affecting the completion date, and both parties agree.
5. Both parties shall handle the acceptance formalities of concealed works and intermediate works in time. If Party A fails to attend the acceptance as scheduled, Party B will organize personnel to conduct the acceptance, and Party A will acknowledge it. Thereafter, if Party A requests reinspection, Party B shall reinspect as required. If the reinspection is qualified, the expenses for reinspection and rework shall be borne by Party A, and the construction period shall be postponed.
6. Project completion: Party B shall notify Party A for acceptance three days in advance, and Party A shall organize acceptance within three days after receiving the notice. If Party A fails to organize the acceptance within the specified time, it shall notify Party B in time and set another acceptance date.
Five, safety production and fire prevention agreement
The construction drawings or practice instructions provided by Party A and the construction site shall meet the requirements of fire prevention and accident prevention, mainly including the smoothness and qualification of electrical lines, gas pipelines, tap water and other pipelines. During the construction period, Party B shall take necessary safety protection and fire control measures to ensure the safety of operators and nearby residents, and prevent accidents such as pipeline blockage, water leakage, power failure and damage to houses and articles of nearby residents. In case of the above situation, it shall be the responsibility of Party A, and Party A shall be responsible for and compensate; Where Party B is responsible, Party B shall be responsible for repair and compensation.
Other matters of intransitive verbs
1. Party A shall provide Party B with the construction drawings approved by the property management department, and make on-site disclosure to Party B before commencement. And provide Party B with necessary conditions such as water and electricity required for construction, and explain the matters needing attention in use. Do a good job in the construction of temporary use of public parts and the coordination of neighborhood relations.
2. Party B shall participate in the on-site disclosure of the construction drawings or instructions organized by Party A, organize the construction as required, complete the construction tasks with good quality and quantity on schedule, and solve all matters for which Party B is responsible, and Party B shall recognize its actions. Without the consent of Party A and the approval of the local housing management or property management department, the original building load-bearing structure, various equipment and pipelines shall not be dismantled and modified at will.
Seven. responsibility for breach of contract
1. If the construction period is delayed or suspended due to Party A's reasons, Party A shall compensate Party B for the losses caused by suspension or slowdown, and Party A shall pay RMB to Party B for each day of suspension; If Party A fails to make payment as agreed in the contract, it shall pay a penalty of RMB yuan for each day overdue.
2. If the completion of the project is delayed due to Party B's reasons, Party B shall pay _ _ _ _% of the payment made by Party A as liquidated damages for each day overdue.
Eight, dispute handling methods
Any dispute arising from the execution of the contract between the two parties shall be settled through friendly negotiation. If negotiation fails, a lawsuit may be brought to the people's court.
Nine. Alteration and termination of the contract
After this contract is signed by both parties, both parties must strictly abide by it.
X this contract is made in duplicate, one for each party, with the same legal effect. The annex to the contract is an integral part of this contract.
Party A (signature): _ _ _ Tel: _ _ _ _
Party B (signature): _ _ _ Tel: _ _ _ _
Signing place: _ _ _ _ _ _
Date of Signing: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _