Contents of the Ten Red Lines for Quality:
1. Violation of/unfounded document operations are strictly prohibited
Violation of approved construction plans/manufacturing outlines, special measures and work procedures, or operations without documentation.
2. It is strictly prohibited to deal with quality defects without authorization in violation of the process
After a quality defect occurs, the relevant personnel does not follow the prescribed process or approved measures and handles the quality defect without authorization.
3. It is strictly prohibited to falsify quality documents
Fabricate or fabricate quality documents generated during the design, manufacturing, construction, and debugging processes, or forge signatures and dates on quality documents.
4. It is strictly prohibited for personnel to work without certificates
Welders, welding operators, and inspection and testing personnel who need certificates to work have not obtained valid certificates or the scope of the certificates is not covered.
5. Illegal subcontracting is strictly prohibited
During the design, manufacturing, construction, and debugging processes, subcontracting a certain activity/process to other units in violation of regulations.
6. It is strictly prohibited to use unqualified materials, inspection and test equipment
This article specifically refers to materials that have not been accepted or failed to pass the inspection; inspection and test equipment has not been calibrated or the calibration has expired , the calibration does not meet the requirements.
7. It is strictly prohibited to operate beyond the point
The next process will be carried out without acceptance, if the acceptance is unqualified, and the witness point (point W) is not signed and released, and the work will be stopped to be inspected (point H) Follow-up work will be carried out without signing and releasing.
8. Failure to conduct technical briefings in accordance with regulations is strictly prohibited
Failure to conduct technical briefings in accordance with regulations before or during the event. If technical briefings are not conducted in accordance with the prescribed time, participate in technical briefings. personnel do not meet the specified requirements.
9. It is strictly prohibited to omit, lie and conceal quality incidents
To omit, lie and conceal quality incidents, such as deliberately concealing quality incidents and not reporting them.
10. It is strictly prohibited to start work without clearing the prerequisites
Before the activity starts, start work without checking and clearing the prerequisites.