Air conditioning installation agreement
In the era of continuous progress, agreements are used more and more, and signing agreements is one of the most effective legal basis. There are many precautions in the agreement. Are you sure you can write? The following are four air conditioning installation agreements that I have compiled for you, hoping to help you.

Air conditioning installation agreement 1 Party A:

Party B:

According to the Contract Law of People's Republic of China (PRC), Party A and Party B have reached the following agreement on the principle of equality and mutual benefit:

I. Project name:

Second, the project address:

Third, the work content:

Party B shall carry out the construction according to the construction plan provided by Party A. All materials and equipment in the construction plan shall be purchased by Party A and transported to the construction site; Party B is only responsible for the construction.

The installation scope and contents of Party B are as follows:

Installation engineering unit quantity comment number

1 air conditioning main console

2 fan coil units

3 air conditioning cabinet

4 water pump platform

5 galvanized iron air duct ㎡.

Air conditioning supply and return pipeline project.

7 condensate pipe project

8 Switch and tuyere project

Four. Responsibilities of both parties:

1, Party A's responsibility

(1), Party A shall transport the equipment and materials to the construction site in time so as not to delay the construction period.

(2) Send people to the construction site to coordinate with the owner and other construction jobs; And the change and visa of construction drawings.

(3) timely disbursement of project funds as agreed; If the payment is not made as agreed, Party B has the right to take necessary measures to recover the payment, and Party A shall be responsible for all the consequences arising therefrom.

(4) Party A is responsible for arranging openings such as air supply outlet, air return outlet, fresh air outlet, air exhaust outlet and maintenance port. Fan coil unit and air conditioning box, the expenses shall be borne by Party A;

(5) Without special circumstances, Party A shall not delay the construction period under any excuse. If the construction period is delayed due to Party A's reasons, Party A must pay the labor wages and living expenses of Party B's construction personnel.

(6) The foundation of air-conditioning main engine shall be made by Party A according to the construction drawing, and the expenses shall be borne by Party A. ..

(7) Party A is responsible for hoisting the air-conditioning main engine, and the expenses shall be borne by Party A. ..

(8) Party B shall carry out the construction according to the construction drawing. If there is any change, Party A must inform Party B in advance, and the increased expenses due to the construction drawing or Party A's reasons shall be borne by Party A; Party B shall carry out the construction according to Party A's change notice and fee visa.

2. Party B's responsibilities

(1) Carry out the construction in strict accordance with Party A's construction plan and Party A's requirements.

(2) Strictly abide by the management regulations of the project owner to achieve civilized construction;

(3) Carry out the construction in strict accordance with the construction progress and quality.

Five, engineering installation cost table:

Serial number Installation project unit quantity unit price (yuan) combined price (yuan)

1 air conditioning main console

2 fan coil units

3 air conditioning cabinet

4 water pump platform

5 galvanized iron air duct ㎡.

Air conditioning supply and return pipeline project.

7 condensate pipe project

8 Switch and tuyere project

9 Total project cost

The total cost of engineering installation shall be settled according to the actual quantities.

Terms of payment for intransitive verbs

1. The total project installation cost is RMB Yuan only, in words.

2. After the contract is signed, Party A shall pay Party B 30% of the project payment, in words: RMB only, as the advance payment for the project;

10 days later, Party A shall pay Party B 30% of the total project payment, in words: RMB only, as the project progress payment;

After the indoor concealed work is completed, Party A shall pay Party B 20% of the total project price, in words: RMB only;

20% of the total remaining project amount, RMB ¥, in words:

After the project installation, debugging and acceptance, Party A shall pay RMB Yuan only in one lump sum (Note: After the project installation, debugging and acceptance, Party A must pay all the contract fees according to the contract regardless of whether Party A receives the project payment).

Seven, the project warranty period

The engineering system shall be guaranteed by Party B for one year free of charge; Party A shall be responsible for all equipment warranty and material quality problems.

Eight. Other agreements

This agreement is made in duplicate, each party holds one copy, which has the same legal effect. In case of any disagreement during the implementation of the agreement, both parties shall settle it through friendly negotiation. If negotiation fails, a lawsuit can be brought to the local people's court.

Party A: Party B:

Account number: Account number:

Date: XX, XX, XX, XX

Article 2 of the Air Conditioning Installation Agreement Party A:

Party B:

In order to ensure the safety of air conditioning installation project, this agreement is signed by both parties through consultation.

Article 1 Party A's Safety Responsibility

Before Party B installs the air conditioner, Party A shall give oral safety education to the person in charge of Party B's site, and the person in charge of Party A's site safety shall (after oral education. Party A has no relevant safety responsibilities), and the main content of its education is the safety precautions related to installation.

Article 2 Party B's Safety Responsibility

1. Party B shall be responsible for any accident caused by falling objects during installation.

2. In case of accidents caused by the falling of foreign equipment (within 6 years), Party B shall take full responsibility.

3. Party B shall provide machinery, equipment, tools and materials required for air conditioning installation, and shall be responsible for providing safety belts and other labor protection articles for installers.

4. Party B shall be responsible for the safety and public security education of the installers, carry out the installation in strict accordance with the relevant national safety operation regulations, and take safety measures to achieve safe and civilized construction.

5. Party B shall ensure that there are no casualties and fire accidents. In case of fire, electric shock, falling from high altitude, object strike, mechanical injury, poisoning, heatstroke, casualties and other safety accidents, all losses and responsibilities arising therefrom shall be borne by Party B, which has nothing to do with Party A. ..

6. Before installation, Party B must sign a safety agreement with Party A, otherwise, it will be deemed that Party B has constructed without authorization, and the consequences will be borne by itself.

7. Party B shall be legally employed with complete relevant certificates. If Party B employs illegally, Party B shall bear the losses.

8. After entering the site, Party B shall obey Party A's command and accept Party A's supervision, and Party A has the right to inspect and handle it.

9. Party B shall do a good job in the protection of finished products and shall not pollute the original decoration, equipment and facilities; Otherwise, Party B shall clean up, restore to the original state or make compensation until Party A is satisfied ... The losses caused by poor protection of finished products shall be borne by Party B. ..

10. Party B shall do a good job in labor protection. Party B shall fasten the safety belt and hang it in a reliable place when working on the external wall, near the edge or at high altitude. It is forbidden to hang high and use low. It is forbidden to install air conditioners without wearing seat belts.

1 1. Party B shall protect buildings, pipelines and indoor articles, and do a good job in safety alarm equipment and safety protection, and shall not harm others, otherwise the losses caused shall be borne by Party B. ..

12. The waste residue, waste liquid and waste generated by Party B during the installation process are not allowed to be dumped or placed randomly, and should be cleaned up to the place designated by Party A in time to achieve clean and civilized construction.

13. Party B shall abide by the law and shall not steal, otherwise it will be punished.

Article 3 This Agreement is made in duplicate.

Party A and Party B each hold one copy, which shall come into effect after being signed and sealed by both parties and have the same legal effect.

Party A (signature): Party B (signature):

Address: Address:

Authorized Agent: Authorized Agent:

Tel: Tel:

Date: Year Month Day Date: Year Month Day

Article 3 of the air conditioning installation agreement 1, before the project starts, it is necessary to determine the position of lamps, sockets and sanitary ware with the designer and accurately calculate the materials used.

2, after the material comes into play, to count the number, check for damage and quality problems, and protect yourself, stored in a safe place. You are not allowed to take the on-site materials without permission. Once found, compensation will be tripled.

3, in the case of construction without destroying the structure, if you need to play load-bearing beams and columns, you must reflect the situation in time, and you are not allowed to construct on your own. Line pipe into the wall not less than 5mm, slotting must use a cutting machine, concealed pipe, cassette buried firmly, cassette and surface must be straight and consistent. Water pipes entering the wall should be sealed after testing and pressing. If rework is caused by water leakage, the person in charge of construction shall be responsible for all reworked materials and labor.

4. Install sanitary ware with a spirit level. If the sanitary ware is not level, it will be reworked, and all the materials and labor costs for rework will be borne by yourself. Installation tools should be put away centrally, not on furniture, marble countertops and floor tiles. If the tool is misplaced and the finished product is damaged, compensation shall be investigated.

5, to actively cooperate with other types of work, can't delay affect other construction progress. Always pay attention to construction safety and be responsible for any work-related accidents. Keep the site clean and tidy every day, and regularly transport the garbage to the designated garbage dump downstairs.

6. Do not charge any fees to customers. If drawings change, dimensions change, or items are added or reduced, construction can only be carried out with the consent of the company. If the construction is carried out without authorization, all consequences will be borne by yourself.

7, in strict accordance with the provisions of the "construction plan" time limit for a project is completed, delay 1 day fine 50 yuan.

8. The company will withhold 5% of the project quality deposit. During the warranty period of 1 year, any quality problems must be dealt with on site in time. If there is any delay or delay, the project quality deposit will not be refunded.

The above rules are not fully recorded, and strict self-discipline is expected. If there is no liability accident in the whole year and it can be completed on time or ahead of schedule, the company will reward it at the end of the year.

Project name:

Signature of person in charge: date

Article 4 of the Air Conditioning Installation Agreement Party A:

Party B:

In order to do a good job in the safety of air-conditioning installation project, this agreement is signed by both parties through consultation.

Article 1 Party A's Safety Responsibility

Before Party B installs the air conditioner, Party A shall give oral safety education to the person in charge of Party B's site. The person in charge of Party A's site safety is that the main content of education is safety precautions related to installation.

Article 2 Party B's Safety Responsibility

1. Party B shall provide machinery, equipment, tools and materials required for air conditioning installation, and shall be responsible for providing labor protection articles such as safety belts, safety helmets and masks for installers.

3. Party B is responsible for educating the installers on safety and public security, installing in strict accordance with relevant national safety operation regulations, and taking safety measures to ensure safe and civilized construction.

3. Before installation, Party B must sign a safety agreement with Party A, otherwise, it will be deemed that Party B has carried out construction without authorization at its own risk.

2. Party B shall employ legally with complete relevant certificates, and the losses caused by illegal employment shall be borne by Party B. ..

5. After entering the site, Party B shall obey Party A's command and accept Party A's supervision, and Party A has the right to inspect and handle it.

6. Party B shall do a good job in finished product protection, and shall not pollute the original decoration, equipment and facilities, otherwise it shall clean up, restore to the original state or make compensation until Party A is satisfied ... The losses caused by poor finished product protection shall be borne by Party B. ..

⒎ Party B shall do a good job in labor protection, and fasten the safety belt when working on the external wall, near the edge and overhead, and hang it in a reliable place. It is forbidden to hang high and use low, and it is forbidden to install air conditioners without wearing seat belts.

⒏ Party B shall ensure that there are no casualties and fire accidents. In case of fire, electric shock, falling from high altitude, object strike, mechanical injury, poisoning, heatstroke, casualties and other safety accidents, all losses and responsibilities arising therefrom shall be borne by Party B, which has nothing to do with Party A. ..

⒐ Party B shall protect the buildings, pipelines and indoor articles, and do a good job in safety alarm equipment and safety protection, and shall not harm others, otherwise the losses caused shall be borne by Party B. ..

⒑ Waste residue, waste liquid and waste materials generated by Party B during installation are not allowed to be dumped or placed randomly, and should be cleaned up to the place designated by Party A in time so as to clean up the site after construction.

(1) Party B shall abide by the law and shall not steal, otherwise it will be punished.

Article 3 This Agreement is made in duplicate, one for each party, and shall come into force after being signed and sealed by both parties, with the same legal effect.

Party A (signature): Party B (signature):

Address: Address:

Authorized Agent: Authorized Agent:

Tel: Tel:

Date: Year Month Day Date: Year Month Day