Which should be done by expert demonstration or supervision and review first?

Which comes first: expert argumentation or supervision approval of construction projects: supervision approval comes first.

The supervisor shall first review the procedures for compilation, review and submission of the plan prepared by the construction unit, and the basis for the standards (whether it is consistent with the site conditions). After meeting the requirements, expert demonstrations will be organized. After the demonstration, the construction unit will modify and improve the plan based on the demonstration opinions. After the modifications and improvements are completed, it will be submitted to the supervisor for approval.

Construction organization design + special plan + key and difficult sub-projects: hosted by the project leader and prepared by the project technical leader. After review and approval by the project department, it will be reported to the company's technical leader for approval, and then reported to supervision and construction Unit signature; construction plan: prepared by the project technical leader or technician, reviewed and approved by the project technical leader and then submitted to the supervisor for signature.

Expert demonstration of the special plan: first pass the review of the construction unit and the chief supervisory engineer. After the demonstration is revised and perfected, it will be reviewed and signed by the technical leader of the construction unit and stamped with the official seal, and the chief supervisory engineer will be reviewed, signed and stamped with the professional seal, and modified. Inform experts promptly of the situation.

Expert argumentation process

1. The design unit introduces the *** project design plan.

2. After listening to the introduction of the *** project design plan, the participating experts conducted a preliminary review of the project *** system design plan and construction drawings, and inquired about the project, and each expert put forward their own opinions.

3. Participants from the design unit and construction unit shall leave the meeting.

4. Each expert writes his opinion on the "Expert Argument Opinion" form and signs in the "Expert Signature" column.

5. The leader of the expert group organizes the experts to put forward unified and clear opinions on the content of the argument, which will be signed and confirmed by the leader of the expert group. This opinion serves as guidance for the modification and improvement of the project's ** system design plan.

6. Participants from the design unit and construction unit enter the venue, and the leader of the expert group will read out and submit the final expert group argumentation opinions.

7. If you have any questions about the views and opinions of the design unit and construction unit on the experts' demonstration opinions, you can ask the expert group.

8. Finally, the meeting host shall clarify the matters decided by the meeting, including modifications to the plan or design.

9. The project team is responsible for recovering all materials related to the demonstration such as the "Expert Demonstration Opinions", and the conference affairs team is responsible for checking whether all materials at the conference venue have been recovered.