Current location - Quotes Website - Personality signature - 5 outdoor advertising production and installation contract templates
5 outdoor advertising production and installation contract templates

An excellent advertisement is not measured only by its beauty, but by whether it is suitable for your advertising target. So how do you understand the outdoor advertising production and installation contract? Below are 5 outdoor advertising production and installation contract templates that I have compiled for you. If you like it, you can share it with your friends!

Outdoor advertising production and installation contract template 1

Party A: _______________________________ (hereinafter referred to as Party A)

Party B: _______________________________ (hereinafter referred to as Party B)

Party A and Party B, on the basis of equality, mutual benefit and friendly consultation, and in accordance with the Contract Law of the People's Republic of China and relevant laws and regulations, have reached the following agreement on matters related to the construction of billboard projects entrusted by Party A to Party B for the benefit of both parties. ***Same as following:

1. Project Overview

1. Project name: billboard design and installation.

2. Quantity, specifications, materials and quotation sheet; see Appendix 1 (Quotation sheet) of this contract for details.

3. Installation location: _______________________________

2. Contract price and payment method

1. Contract price

Party A shall pay to Party B's total production and installation costs: RMB __________ yuan (in capital letters: __________ whole).

2. Payment method

① Party A shall pay Party B __________% of the total contract amount within __________ days after the contract takes effect, that is, RMB __________ yuan, that is, in capital letters: __________all.

②After the overall installation acceptance of the project mentioned in the first project overview of this contract is passed, Party A will pay Party B __________% of the total contract amount, which is RMB __________ yuan, that is, in capital letters: __________ Payment must be made within __________ days after installation is completed.

③ For the above project expenses, Party B shall issue a legal and valid invoice of the same amount to Party A.

3. Production, installation methods and quality and safety requirements

1. Party A and Party B are jointly responsible for the coordination of relevant departments.

2. Party B shall contract the work and materials, guarantee quality and safety, and be fully responsible for the entire process of production, transportation and installation of the project.

3. Party B guarantees that the items mentioned in this contract will be manufactured and installed in strict accordance with the material standards in Appendix I of this contract. The materials used are consistent with the quotation, comply with relevant design requirements, and ensure that the structure reaches the design strength.

4. Production and installation period

1. Party B shall complete the production and installation before _________year________month__________.

2. During the production and installation of billboards by Party B, if Party A fails to pay as agreed in the contract due to unilateral reasons, Party B is unable to complete the work on time. Party A is responsible for the responsibility. If there is force majeure, In the event of natural disasters such as snowstorms and typhoons, the construction period will be postponed.

5. Acceptance of production and installation

After Party B completes the production and installation within the time limit specified in the contract, Party A must inspect and accept it within ________ days and notify Party B whether the acceptance is qualified. If Party B fails to notify Party B within ________ days, it will be regarded as qualified. If it is unqualified, Party B shall rework it to meet the production standards and installation requirements bound by the contract after receiving Party A's notification.

6. Rights and obligations of both parties

1. Party A shall provide Party B with the information required for advertising and ensure that its content complies with laws and regulations.

2. Party B will be responsible for all safety accidents, economic losses and casualties caused during the construction process of billboard production and installation and bear all legal responsibilities.

3. Party A and its designated personnel have the right to supervise Party B’s construction. When Party A discovers that Party B's construction materials are unqualified, project quality is not up to standard, construction is not standardized, and the billboard construction plan is unreasonable during the construction process, Party A has the right to request Party B to make rectifications, and Party B shall complete the rectifications immediately.

4. Party A shall be responsible for the overall coordination of on-site construction and provide water and electricity to Party B. The electricity bills incurred during the construction process shall be borne by Party A.

5. Party B shall ensure that the construction procedures comply with industry standards and that the quality of the steel materials provided complies with the contract.

6. Party B shall ensure that the current surroundings of the construction site are clean and construction waste is cleared away in a timely manner.

7. The ownership of the billboard belongs to Party A, and the dismantling work will be organized and implemented by Party A.

7. Liability for breach of contract

1. If Party A pays late, Party B has the right to urge Party A to pay and require Party A to pay liquidated damages for each overdue day. The amount of money paid to Party B is _________ yuan.

2. If Party B is unable to complete the production and installation work as stipulated in this contract and receive satisfactory results, it shall pay Party A a liquidated damages of RMB___________ for each day overdue.

8. Other matters

1. The attachments to this contract are a valid part of this contract. If a dispute arises between the two parties during the execution of the contract and they fail to reach an agreement through negotiation, either party may file a lawsuit with the people's court with jurisdiction over the place where the contract was signed.

2. If there are any matters not covered in this contract, both parties shall sign a supplementary agreement. The supplemental agreement shall have the same legal effect as this contract. If the supplementary agreement is inconsistent with this contract, the supplemental agreement shall prevail.

3. This contract shall come into effect upon signature and seal of Party A and Party B. It shall be made in two copies, with Party A and Party B each holding one copy.

Party A (seal): _________

Party B (seal): _________

Representative: _________

Representative: _________

Contact number: _________

Contact number: _________

Signing time: __________________

Outdoor advertising production and installation contract template 2

Party A:

Party B:

In order to clarify their respective rights and obligations, Party A and Party B, after friendly negotiation and in accordance with the provisions of relevant laws and regulations, hereby undertake to Party B The following agreement has been reached on the production and installation of Party A's hotel exterior lighting project.

1: Project content and specifications:

1. Exterior lighting production and installation, specifications: Attached material list;

2. According to actual dimensions Make and install.

2: Project cost and payment method

1. Total project price: *** in RMB, capitalized in Yuan.

2. Payment method:

A. When the contract is signed, Party A prepays % of the total project amount, that is: Yuan (in capital letters: Yuan) as a deposit, and the contract becomes effective.

B. After the overall installation is completed and accepted, the remaining % of the project payment will be paid to Party B. That is: Yuan (capital: Yuan Zheng).

Three: Project period

1. The project period is days from the date when the agreement is signed and Party A pays the project payment in advance. In the event of force majeure (such as rain, Related costs. Party A will bear all the consequences caused by incomplete relevant procedures

2. The right to make reasonable suggestions and modifications to Party B's production so that Party B's construction can be more in line with Party A's The company requires.

3. Responsible for providing the construction site and time, as well as related water and electricity matters.

4. Settling the production and installation costs of the project in accordance with the provisions of this contract.

B. Party B:

1. From Party A’s notification that on-site construction is possible, the construction and installation will be completed within the specified time according to the installation location provided by Party A.

2. Production and installation shall be carried out strictly in accordance with the construction plan confirmed by Party A. If the site conditions are inconsistent with the construction plan, Party A shall be informed in a timely manner for consultation and modification.

Five: Regarding acceptance

After Party B completes all production and installation, Party A shall organize formal acceptance within 2 days. If Party A does not organize acceptance, Party B may accept Party A's acceptance that the quality of the project is qualified.

6. Liability for breach of contract. :

1. If Party A fails to pay according to the time specified in Article 2 of this contract, for each day overdue, Party A shall pay liquidated damages to Party B calculated as one thousandth of the total contract amount and the contract period shall be postponed. . If payment is still not made within 3 days after the payment time stipulated in the contract, Party B can dismantle the installed materials and handle it on its own, and at the same time hold Party A responsible for the corresponding legal liability.

2. If Party B fails to pay according to the contract without legitimate reasons. Article 3 of this contract stipulates that if the production and installation are completed on time, Party B shall pay Party A five thousandths of the total contract amount as liquidated damages for each day overdue.

7. Liabilities arising from construction. Responsibility:

During the production and installation process, Party B must strictly follow the standardized labor operating regulations. If any labor safety accident is caused by Party B, Party B will be fully responsible and has nothing to do with Party A.

p>

8. Force majeure:

Force majeure refers to any event that occurs after the signing of this contract that is beyond the reasonable control of one party and prevents and hinders one party from fully or partially performing its obligations under this agreement: including but not limited to Earthquakes, typhoons, floods, other natural disasters, etc.

If any party to this contract is unable to perform its contractual obligations due to a force majeure event, that party may suspend performance of its contractual obligations and notify the other party in writing within ten days, stating the nature, expected duration, and impact of the force majeure event. measures to be taken, etc. When a force majeure event occurs, both parties shall negotiate a fair solution and shall do their best to mitigate the impact of the force majeure event.

9. Dispute Resolution

1. If a dispute arises during the performance of this Agreement, the two parties will resolve it through friendly negotiation based on the principles of mutual understanding and mutual help.

2. If negotiation fails, the matter will be resolved through arbitration by the local arbitration committee.

10. Others:

1. This contract will take effect once signed and sealed, and will be binding on both parties.

2. Matters not covered in this contract shall be resolved through separate negotiation between the two parties.

3. This agreement is made in two copies. Party A and Party B each hold one copy, which has the same legal effect.

11. Remarks: .

Party A (seal): Party B (seal):

Representative (signature): Representative (signature):

Telephone: Telephone:

p>

Date: ____month____day of _____ year Date: ____month____day of __year

Outdoor advertising production and installation contract template 3

Party A: ___________________

Party B: ___________________

Party A and Party B shall comply with the Contract Law of the People’s Republic of China and the Advertising Law of the People’s Republic of China. According to relevant laws and regulations, this contract is signed on the basis of equality, voluntariness and consensus on the matter of Party A entrusting Party B to produce and publish outdoor advertisements, and both parties agree to abide by it.

Article 1 Party A entrusts Party B to publish advertisements in the following locations and outdoor advertising media

1. Advertising location: ____________________;

2. Advertising specifications: ____________________;

3. Advertising form: ____________________;

4. Lighting requirements: ____________________.

Article 2 Advertisement Content

1. The content of the advertisement entrusted by Party A to Party B is as follows: The sample provided by Party A shall prevail and shall not be changed by Party B without the consent of Party A.

2. Party A provides advertising content and provides a free screen printing installation at Party A’s request.

Article 3 Advertising Release Period

The starting date is _____________ month _______ day of ___________ year and the end date is _____________ month _______ day of ___________ year.

Article 4 Advertising Release Fees

Party A agrees to pay Party B a total fee of _______________¥ for entrusting Party B to publish the advertisements mentioned in Article 2 of this contract: ____________________¥, including one screen installation , excluding invoices.

Article 5 Payment Method

1. After the contract is signed, Party A pays the total contract amount of the deposit to Party B, that is, RMB ______________ Yuan, Party B shall pay Party B within three working days Install it in place, and provide Party A with receipts for the equivalent amount and sample photos. Party B shall also provide Party A with a receipt for the equivalent amount.

2. Party B sets up a bank account as follows:

Organization name: ____________________________

Account opening bank: ____________________________

Account number: _______________________________

Article 6 Advertising Acceptance

1. Acceptance time: Party B shall send photos to Party A via computer for acceptance after all the advertising screens are installed (excluding screen replacement), and Color photos of billboards are also provided.

2. Acceptance method: Party B must provide photos every month (daytime photos: long shot, close shot).

3. If Party A fails to pay on time, Party B has the right to unilaterally terminate the contract.

Article 7 Personal Safety

If there are casualties during the drawing period and the publishing period, Party B will bear the responsibility.

Article 8 Dispute Resolution

If a dispute occurs during the performance of this contract, both parties shall resolve it through friendly negotiation. If the negotiation cannot be resolved within fifteen days from the start of the negotiation, it shall be submitted to the arbitration committee of Party A’s location for arbitration;

Article 9 Other Terms

1. This contract shall commence from the date of sealing by both parties Take effect.

2. This contract is made in four copies. Party A and Party B each hold two copies, all of which have the same legal effect.

3. The annotations, attachments and supplementary agreements of this contract are an integral part of this contract and have the same legal effect as this contract.

4. Matters not covered in the contract shall be settled through friendly negotiation between Party A and Party B.

Party A (signature and seal): ____________________

Party B (signature and seal): ____________________

___________year_________month_______day

___________year_________month_______day

Outdoor advertising production and installation contract template 4

Party A: ____________

Party B: ____________

/p>

1. Contents and requirements of the agreement

____________________.

2. Design and production costs

The total design and production costs are: RMB ____ yuan, (uppercase: ____ yuan).

3. Payment method

1. Party A needs to pay ____% of the total cost of entrusted design and production when the agreement is signed, which is RMB ¥________ yuan, (in capital letters: _________) .

2. When Party B delivers the designed and produced printed matter to Party A, Party A must pay the balance of the agreement to Party B, which is RMB ____ yuan (in capital letters: _________).

4. Time and delivery method of design and production works

1. Party B must complete the design plan within the time agreed by both parties. If Party B cannot complete the work on time due to Party A's repeated suggestions for modification, the execution can be postponed, and the extension time shall be determined by both parties through negotiation.

5. Intellectual Property Agreement

1. Before Party A pays all commissioned design and production fees, the copyright of the work designed by Party B belongs to Party B, and Party A does not have any rights to the work. right.

2. After Party A has settled all fees for the entrusted design and production, Party A has the ownership, use rights and modification rights of the work.

6. Rights and obligations of both parties

Rights of Party A:

1. Party A has the right to make suggestions and ideas for Party B’s design, so that Party B can design The works are more in line with Party A’s corporate culture.

2. Party A has the right to propose modifications to the works designed by Party B;

3. After paying all design fees, Party A shall enjoy the ownership, use rights and Right of modification;

Party A’s obligations:

1. Party A is obliged to pay relevant fees in accordance with the agreement;

2. Party A is obliged to provide relevant enterprise information Information or other relevant information to Party B;

Party B’s rights:

1. Party B has the right to require Party A to provide relevant corporate information for Party B’s design reference;

2 , Party B has the right to require Party A to pay the corresponding amount as stipulated in the agreement;

3. Party B has the copyright to the designed work and has the right to require Party A not to use the design work before the payment is paid in full:

p>

Party B’s obligations:

1. Party B must design and produce the work in accordance with Party A’s requirements.

2. Party B must deliver the design and production works on time as agreed in the agreement.

7. Liability for breach of contract

1. If Party A terminates the agreement before the first draft of the design work is completed, the prepaid fees have no right to request a return; Party A terminates the agreement after the first draft of Party B's work is completed , the full design fee should be paid.

2. If Party B terminates the agreement early without justifiable reasons, all fees collected shall be returned to Party A.

8. The agreement comes into effect

This agreement is made in two copies. Party A and Party B each hold one copy of the agreement signed by the other party, which has the same legal effect. This agreement shall take effect from the date of signature and seal.

Party A (seal): __________ Party B (seal): ___________

Signature of Party A’s representative: __________ Signature of Party B’s representative: ___________

Address :____________________ Address: ____________________

Date: ____________________, month, __________, year ____________________

Outdoor advertising production and installation contract template 5

Party A:

Party B:

Party A entrusts Party B to undertake the production and installation of outdoor billboards. In order to clarify the rights and obligations of both parties and based on the specific circumstances of the production and installation project, the two parties have reached the following agreement: < /p>

1. Project content: outdoor advertising production and installation.

2. Installation location: .

3. Project Overview: Completed from year month day to year month day. If weather factors affect the construction progress, the completion date may be postponed accordingly.

4. Project cost and settlement method:

1. The cost of this project is RMB (uppercase) yuan. (¥: Yuan) (work is included but materials are not included)

2. Settlement method: .

5. Billboard design: Party A provides the design plan or concept, and Party B is responsible for the construction.

6. Billboard production: Party B must produce it in accordance with the design drawings and concepts confirmed and approved by Party A. Any changes must be approved by Party A.

7. Installation of billboards:

1. Party B must install billboards in strict accordance with the requirements put forward by Party A. If there is any violation, Party A has the right to request suspension or rework, resulting in Party B is responsible for the losses. After Party A and Party B reach an agreement, if Party B fails to meet Party A's requirements during the construction period, Party A has the right to terminate the contract.

2. Party B will be responsible for any damage to the facilities caused by Party B’s installation.

8. Project quality:

If the quality of the basic materials (angle steel, etc.) provided by Party A is unqualified and affects the quality of the billboard, Party A will bear the rework costs.

9. Safety Responsibility:

Any safety accidents (injury or death) that occur to Party B during the construction process shall be borne and compensated by Party B. Party A does not bear any responsibility.

10. Liability for breach of contract:

Party A and Party B shall not breach the contract without any other special reasons. If there is a breach of contract, a liquidated damages of 10% of the total contract amount shall be paid.

11. Other Agreements:

1. If the details of this agreement are unknown, A and B will supplement the agreement or terms through negotiation. If there is a dispute between A and B in this agreement, both parties will Have the right to file a lawsuit with the local people's court.

2. This agreement is in duplicate and will be constructed from the date of signing.

3. It will take effect after both parties sign or seal it.

Party A (signature): Party B (signature):

Telephone: Telephone:

Year, month and day

Outdoor advertising production and installation 5 related articles on contract templates:

★ Five advertising production and installation agreement templates

★ Outdoor advertising production and installation contract templates

★ Outdoor advertising production and installation contract templates 3 Chapter

★ Outdoor advertising production contract template

★ Outdoor advertising installation safety contract template

★ Billboard production and installation contract agreement (2)

★ Outdoor inkjet advertising production contract sample

★ 5 advertising venue rental contract templates

★ Outdoor inkjet advertising production contract template

★ Exterior wall advertising Make an installation contract template