Three samples of home decoration contracts

Article 1 Home Decoration Contract Sample

The entrusting party (referred to as Party A):

The entrusted party (referred to as Party A):

Party A currently has a house/club/office building and entrusts ____________________ to design and construct the interior decoration. In accordance with the provisions of the "Contract Law of the People's Republic of China" and the Ministry of Construction's "Trial Measures for the Management of Family Room Decoration and Decoration", combined with the specific conditions of this project, the two parties reached the following agreement:

1. Project Overview< /p>

1. Project name: Home decoration

2. Project location:

3. Project content: Subject to the items listed in the quotation form

< p> 4. Project construction method: a. Single contracting b. Contracting work including auxiliary materials c. Contracting work and materials

5. Project duration: The project started on the year, month, and was completed on the year, month, and day

6. Contract price (in RMB)

2. Responsibilities of Party A

1. Before the start of the project, confirm the decoration design and construction instructions of the project with Party B, and Sign and approve the drawings and quotations; remove obstacles that may affect the construction, and take protective measures for furniture and furnishings that can only be partially vacated; provide Party B with the water and electricity needed for the construction, and explain the precautions for use; Handle various approval procedures involved in construction and pay property company fees and decoration deposits.

2. Responsible for examining and approving the changes and additions to the agreement between the two parties, and paying for the changes and additions according to progress.

3. If it is determined that the original building structure or equipment pipelines need to be demolished or modified, it is responsible for going to the relevant departments to go through the corresponding approval procedures and pay the relevant fees; if Party A fails to go through any formalities, agrees or requires Party B to demolish without authorization Party A will be responsible and borne by Party A for any losses or accidents caused by modifying the original building structure or equipment pipelines.

4. Coordinate Party B to carry out on-site security, fire protection, garbage disposal and other work, and coordinate neighbor relations.

5. Party A is responsible for repairing and compensating for pipe blockage, water leakage, power outage, damage to items, etc. caused by Party A in adjacent residential buildings.

6. The quality of the materials purchased by Party A must be approved by Party A and Party B. Otherwise, Party A will be responsible for any economic losses caused. The date of arrival of materials must comply with Party B's construction progress requirements. Party A will be responsible for any losses caused by delays in construction. For items purchased by Party A, Party A shall bear the warranty costs.

7. Party A appoints a representative stationed at the construction site to be responsible for contract performance, supervising and inspecting the project quality and progress, handling acceptance, registration procedures and other matters.

8. For projects directly contracted by Party A, Party B is obliged to cooperate with other construction parties to ensure the quality of the project and the smooth completion of the project.

3. Party B’s Responsibilities

1. Assist Party A in determining the decoration design and construction instructions, and draft a construction progress plan and submit it to Party A for approval. The purchased main materials for decoration must be reviewed and approved by Party A in advance; we will assist Party A to go through the admission procedures and pay the decoration deposit and worker pass fee to the property in accordance with the "Order No. 90" of the Shenzhen Municipal People's Government.

2. Designate Party B as the representative at the construction site to be responsible for the performance of the contract. Organize construction as required, ensure quality and quantity, and complete construction tasks on schedule. Resolve all matters that are the responsibility of Party B.

3. Strictly implement construction specifications, safe operating procedures, fire safety regulations, and environmental protection regulations. Construction shall be carried out in strict accordance with the drawings and construction instructions. Project changes during the construction process shall be reviewed and approved by Party A in advance before construction can begin. Participate in completion acceptance and prepare project settlement sheets.

4. Comply with the regulations of relevant departments on construction site management, do a good job in construction site security, garbage disposal, etc., and at the same time coordinate the disturbance problems caused by construction.

5. During construction, the original building structure and various equipment and pipelines shall not be demolished at will without the consent of Party A or the approval of relevant departments. Otherwise, you will bear all the consequences caused thereby.

6. Party B will be responsible for repairing and compensating for pipe blockage, water leakage, power outage, damage to items, etc. caused by Party B in adjacent residential buildings.

7. Before the project is completed and handed over to Party A, Party A is responsible for protecting all on-site facilities and construction products.

8. Party B inspects Party A’s house. Passing the inspection indicates that Party B has recognized the quality of Party A’s house. If quality problems such as water, electricity, and hollow drums occur during Party B’s construction, the responsibility should not be passed to Party A. Party should solve it by itself or negotiate with the property management office.

9. All labor tools related to this contract will be provided by Party B.

10. Party B shall submit the project progress at least three days in advance, as well as the items Party A needs to purchase and the cooperating services Party A needs to provide, including on-site assessment and supervision.

IV. Project quality, construction period, warranty and liability for breach of contract

1. This project is based on construction drawings, quotations, project addition and modification orders and "Construction and Acceptance Specifications for Building Decoration Projects" (JGJ73-91) or "Shenzhen Home Decoration Engineering Quality Standards" and other national construction and acceptance specifications are the quality assessment and acceptance standards.

2. The construction period is affected due to Party A’s failure to perform its obligations as stipulated in the contract, or the quality of the materials and equipment provided by Party A is not up to standard, or the project quality is affected and the construction period is delayed due to Party A’s temporary changes to the drawings. The rework costs will be borne by Party A and the construction period will be postponed, subject to the "Project Addition and Modification Order".

3. If a quality accident occurs due to Party B’s fault, the rework costs will be borne by Party B and the construction period will not be postponed.

4. If the power outage, water outage and force majeure factors are not caused by Party B, the work will be stopped for more than 8 hours (accumulated within one week), and the construction period will be postponed accordingly.

5. If the work is stopped midway due to Party A’s reasons, Party A shall compensate Party B for the losses caused by the stoppage or delay in work. Party A shall pay Party B yuan for each day of work suspension or delay. If Party A fails to allocate the project funds as stipulated in the contract, Party A will pay a late fee based on % of the amount payable for each day of delay.

6. If the completion is delayed due to Party B’s reasons, Party B will pay Party A 100 yuan in liquidated damages for each day of delay. If Party A requires early completion during the contract period, in addition to paying the rush fee, Party A will pay Party B 100 yuan as a reward for each day in advance.

7. Party A uses it in advance or uses it without authorization without going through the acceptance procedures. Party A will be responsible for any losses caused.

8. When the contract cannot continue to be performed due to unilateral reasons, the other party should be notified to handle the contract termination agreement, and the responsible party should compensate the other party for the resulting economic losses.

9. Party B will implement quality warranty within two years from the date of project completion and acceptance. That is, if quality problems are caused by Party B's construction or purchased materials within two years, Party B will be responsible for free repairs; if problems are caused by Party A's improper use or purchased materials within two years, Party A will be responsible for the purchase cost of repair materials, and Party B will be free of labor costs. Make repairs.

V. Supplementary Provisions

1. There are two original copies of this contract, each party holds one copy, and they have the same legal effect.

2. This contract will take effect from the date of signing and will terminate automatically when the three-year warranty period expires from the date of completion/delivery of the project.

3. The following attachments are an integral part of the contract (effective at the same time as the contract)

①. Construction drawings

②. Engineering project quotation

③. Project Addition and Modification Order

④. Attachment approved by both parties in writing

6. Special agreement

Party A and Party B agree:

1. Check the water and electricity before entering the site, and not after entering the site. Party B will be responsible for any damage to water or electricity.

2. You are not allowed to cook in the room. Party B will be responsible for any accidents.

3. There should be no joints in the electrical pipes, and there should be no joints at the intersection between pipes. Find the joints from the previous junction box.

4. After Party B completes the construction, Party B shall deliver a copy of the water and electricity construction drawings or water and electricity transformation pictures to Party A.

5. Ceramic tiles can be pasted only after the waterproofing has been accepted by Party A.

6. The live wire on the right side of the socket and the neutral wire on the left side

7. The live wire is red, the neutral wire is black, and the ground wire is green and yellow

8. The settlement price of the project is calculated based on the actual completed project quantity, and any excess will be refunded and any excess will be compensated.

9. Hydropower projects have a three-year warranty.

10. For materials purchased by Party A, Party B must submit a list to Party A in writing within three days before use.

11. After the contract is signed, Party B shall not unilaterally increase or decrease the project items.

12. After the contract is signed, Party B shall not increase the project price for any reason without changing the project.

VII. Remarks

1. For the parts not covered or not specified in this contract, the regulations of the government or relevant industry authorities shall prevail.

2. Any disputes arising from this contract or related to this contract shall be resolved through friendly negotiation between the two parties. If the negotiation fails, it can be submitted to the Shenzhen Arbitration Commission for arbitration in accordance with the currently effective arbitration rules of the Commission. The award is final and binding on both parties.

3. Matters not covered in the contract shall be negotiated separately by both parties. The written document formed by the agreement shall be a supplementary part of the contract and shall have the same effect as this contract.

8. Agreement on payment method for project payment

Party A’s payment of project payment to Party B shall be completed in the following five times:

After signing the contract, Party A shall pay the total amount in advance. 10% of the project payment will be used as the decoration deposit (the deposit will be credited to the project payment);

After the construction starts, 40% of the total project payment will be paid after the water and electricity transformation is completed, as the first batch of material payment;

When the carpentry is completed, the painter comes in and pays 30% of the total project price as the second batch of materials;

When the construction is completed and the acceptance is passed, 15% of the total project price is paid;

Within one month after passing the acceptance inspection, Party A will pay 5% of the balance in one lump sum.

Party A: Party B:

ID number: ID number:

Telephone: Telephone:

Email: Email :

Address: Address:

Year, month, day, year, month, day

Part 2 Home Decoration Contract Sample

Owner (hereinafter referred to as A Party): Contact number:

Construction team (hereinafter referred to as Party B): Contact number:

Party A and Party B, in an attitude of friendly cooperation and in accordance with the "Contract Law" and other relevant laws, The following contract is signed on the basis of equality and fairness

1. Project overview

Project address:

2. Price

Clearance of labor costs : ¥5,200 yuan, capitalized: five thousand two hundred yuan

Among them, water and electricity yuan

carpentry yuan

bricklayer yuan

paint Labor Yuan

Garbage removal fee Yuan

3. Payment method

1. The construction team comes to the site and living expenses are paid in advance: 1,000 Yuan

2. When the carpentry is completed, 1,000 yuan is paid

3. When the brickwork is completed, 1,000 yuan is paid

4. The project is completed, 1,800 yuan is paid

5. Warranty deposit 400 Yuan, payable 1 year from the date of completion

IV. Design

1. If Party A has drawings, it must provide a set of drawings to Party B and be responsible for the submission.

p>

2. If Party A does not have drawings, it must explain clear requirements to Party B. Party B must draw a sketch for Party A’s approval before construction.

5. Materials

1. Party B shall provide Party A with a list of materials to be purchased 3 days in advance, and Party A shall promptly purchase materials for use by the construction team within 4 days. Both parties shall bear their respective responsibilities and economic losses for delaying the construction period.

 2. Without the consent of Party A, Party B shall not purchase materials on its own. If it has purchased materials, Party A has the right to unconditionally refuse to use and pay for the materials.

3. Party B shall supply building materials designated by Party A. Click to purchase materials and issue a formal invoice.

4. Party B shall inspect and accept the quality of the building materials purchased by Party A. If any quality problems are found, Party B shall promptly report them to Party A and shall have the right to refuse to use them. If Party A insists on using it, it shall request Party B in writing and bear the losses caused by the quality of the materials.

5. Party B should help Party A receive the goods and check the accuracy of the quantity and accessories.

< p> 6. Party B should keep the materials well and prohibit idlers from entering the construction site.

7. Party B should ensure that there are no double-package or half-package projects in the community.

8. Party B shall do a good job in protecting the finished products after construction.

9. Without Party A’s permission, Party B is not allowed to take any building materials out. If such a phenomenon is found, Party B will pay double the material price. Deducted from labor costs.

VI. Construction Period

The construction period is from month to month, 2004. The construction period is days. Due to Party A’s factors, the construction period will be postponed. Due to Party B’s factors, the construction period will be postponed. Party B's labor cost of 50 yuan/day can be deducted.

7. Material handling

Party A's materials are delivered to the downstairs where the project is located, and any construction personnel of Party B shall carry them unconditionally.

8. Garbage removal

1. Garbage bagging

2. Garbage should be cleared every day

3. Garbage should be removed It will be transported by Party B to the designated garbage storage place of the property

9. Labor force management

1. Party B shall provide Party A with copies of the ID cards of all construction workers before starting construction.

2. Without Party A’s permission, non-site construction workers are not allowed to stay overnight at the construction site.

3. Party A should promptly apply for community entry and exit certificates for Party B and pay relevant fees.

4. Party B should have all the documents for temporary residence in Shanghai, and any relevant losses caused by incomplete documents shall be borne by Party B.

5. Party B appoints as the person in charge of the construction site and as the substitute person in charge.

6. Within the contract price, Party B shall provide people to follow Party A to select materials.

7. Party B shall not change construction personnel at will without the consent of Party A. There must be more than 2 (1) construction personnel on site every day.

8. Without the consent of Party A, Party B shall not suspend or suspend work under any circumstances.

10. Construction Machinery and Tools

1. Party B shall bring its own tools required for construction and ensure the safety and good usability of the tools. Party B shall bear the maintenance costs of the tools.

2. Party A and Party B will each bear half of the consumables (such as drill bits, saw blades, etc.) produced by the tools, and Party A will purchase them on behalf of them, and the settlement will be made after the completion of the project.

11. Construction site management

1. The use of open flames is prohibited on site.

2. Smoking is prohibited on site.

3. Paint materials must be placed separately from other materials.

12. Maintenance

1. For quality problems caused by Party B’s construction, Party B shall repair them free of charge within two years.

2. For ordinary maintenance, Party B shall make timely repairs within three days after Party A notifies Party B. In special circumstances (water and electricity problems), Party B must arrive and make repairs within 24 hours.

3. If Party B fails to complete the repairs in time according to the contract, Party A can arrange for other construction teams to perform maintenance work, and the labor costs incurred will be deducted from the warranty money.

13. Contract Attachments

1. List of construction projects.

2. A quotation approved by both parties.

3. Material purchase list issued by Party B.

14. Contract Disputes

1. If a dispute arises, Party A and Party B shall negotiate first.

2. If negotiation fails, you can file a lawsuit with the court where the dispute is located.

15. Decoration requirements

A. Decoration process

"Circuit installation process requirements:

1. When installing circuits, you must Use product materials with certification.

2. Three different color codes must be used for three-wire installation. In principle, red, yellow, and blue are the live wire color codes. The neutral color code is black, and the yellow-green color code is the grounding color code.

3. When installing all wires, they must be threaded through corresponding PVC pipes and buried in a pre-cut hole with a depth and width of 4×3cm. In the trough, if the trough is widened for parallel lines, it cannot affect the construction of other types of work. If necessary, negotiate with the carpenters and bricklayers to solve the construction problems. There must be no construction style that only cares about oneself and ignores the overall situation.

4. All lines must be distributed in horizontal and vertical directions. Spider-web distribution is strictly prohibited. One end of the PVC pipe must be inserted into the main switch box for about 3cm, and then distributed vertically along the wall and along the ground. Use a 90-degree elbow or soft bend at the corner. The pipes are connected and fixed with pipe clamps. All wires must not have joints in the PVC pipe.

5. The wire diameter of the embedded wires is measured according to the power of the electrical appliances, such as air conditioners, bathroom heaters, and electric appliances. The wiring of water heaters and refrigerators must be put in place from the switch box

6. The length of all embedded wires left at the junction box must be 20cm, and the wiring box must be firmly sealed with cement mortar and kept in place. It should be straight and not skewed, and its opening should be slightly lower than the wall by about 0.5cm. The size of the main switch box can be determined by the number of wires used by the customer.

7. After all the wires are distributed correctly, the power test can be carried out. The method is: connect all the electrical connectors to the lamp holder and put a 15w bulb on it. If the power is turned on, it means that the circuit installation of the household is basically qualified. At this time, you can fill in the project handover form and ask the person in charge of other types of work to sign and accept the electrical concealment project. Preliminary completion.

8. The installation of various lamps and switch panels must be carried out three days before the paint is removed or when the last coat of oil is applied. The top of the large chandelier must be fixed with 4× expansion screws in advance. 3cm wooden square, and then cut the chandelier fixing screws on the wooden square. The panel installation of all switches must be flat and straight, and must not be skewed. When installing the gusset ceiling lamp, the fixing screws must be cut on the wooden fringes. It is strictly prohibited to cut them on the wood. (This wood corrugation can be installed by carpenters in advance)

9. Telephone wires and cable TV wires must not be placed in the same PVC pipe and must go their own way. ”

< p> Chapter 3 Home Decoration Contract Sample

xx City Real Estate Administration Bureau

xx City Administration for Industry and Commerce

xx City Residential Decoration Construction Contract

Party A (the client): Signing time:

Party B (the construction party): Signing location:

In order to standardize the residential decoration construction and protect the legitimate rights and interests of both parties, According to the "Contract Law of the People's Republic of China", "Consumer Rights and Interests Protection Law of the People's Republic of China", Hangzhou Municipal People's Government No. 141 "Hangzhou Municipal Residential Decoration Management Measures" and other relevant laws and regulations Based on the stipulated principles and combined with the physical conditions of this project, both parties have reached the following agreement, which must be abided by.

Home Decoration Contract Sample, Home Decoration Contract Sample Download

1. Project Overview

1. Conditions of Party A and Party B:

A The renovated house is a legal residence. Party B is a unit that has been approved and registered by the industrial and commercial administration authorities in this city and has obtained the residential decoration qualification certificate issued by the real estate management department.

2. Decoration construction location: Room No. (unit), Building No. Road (community).

3. Housing structure: room structure, building area square meters.

4. Decoration construction content: For details, please see Appendix 1 "Construction Content Table"

5. Contracting method: (contracting work and materials, including cleaning work, partial contracting).

6. This project is designed by.

7. Construction period: The project period is days, starting from the year, month, day

to being completed on the year, month, and day.

2. Project price and settlement method:

1. Total price: (uppercase) yuan (including: design fee yuan, management fee (%) yuan, tax (%) Yuan). If the construction content is changed with the approval of both parties, the project payment for the changed part will be calculated separately.

2. After the contract is signed, Party A pays % of the total price, calculated in yuan. Party A pays % of the total price before the year, month and day. Calculation in days: Party A pays % of the total price before the year and month. Days: Yuan: Party A pays % of the total price before the year and month. Yuan: Final payment A The party shall pay the lump sum within days after the project is completed and accepted.

3. Construction preparation and obligations of both parties

(1) Party A’s work

1. Before starting construction, Party A should report to the property management unit or ownership unit Registration and filing: If you really need to change the structure and use of the house, you should ask a unit with corresponding qualifications to issue an identification and reinforcement plan. After approval by the real estate management department, you can obtain a residential decoration permit.

2. Party A shall make an on-site explanation to Party B the day before the start of construction. Evacuate the house, remove obstacles that affect construction, and take protective measures for furniture, furnishings, etc. left in the house that can only be partially vacated. Provide Party B with the water and electricity needed for construction, and explain the precautions for use.

3. Coordinate the temporary use of public parts during construction and behaviors that affect neighbor relations.

4. Designated as the representative of Party A, responsible for contract performance, supervision of project quality and progress, acceptance, changes, registration procedures and other matters.

(2) Party B’s work

1. Provide on-site briefings on construction drawings or process descriptions to Party A, formulate plans and progress plans, and submit them to Party A for approval.

2. Designated as Party B’s representative to be responsible for the performance of the contract. Organize construction as required, ensure quality and quantity, complete construction tasks on schedule, and resolve various matters that Party B is responsible for.

3. Without the consent of Party A and the approval of the local real estate management department, the structure and use of the house shall not be changed at will.

4. "Residential Interior Decoration Management Service Agreement" with the local property management unit.

5. Strictly implement regulations on construction site management, and must not disturb residents or pollute the environment.

IV. Supply of Materials

1. Materials provided by Party A: For details, please see Appendix 2 "List of Materials and Equipment Provided by Party A"

This project Party A is responsible for purchasing and supplying materials and equipment. They should be qualified products that meet the design requirements and must comply with national standards. They must have quality and environmental inspection certificates and product names, specifications, models, manufacturer names, factory addresses, etc. with Chinese logos. Building decoration materials and equipment that have been eliminated by the state shall not be used. And it should be supplied to the site on time, and Party B should go through the acceptance procedures. If the materials and equipment supplied by Party A have quality problems or differences in specifications or are unable to provide relevant certificates, Party B shall promptly submit a written request to Party A. If Party A still expresses its intention to use it, it can continue to use it with written approval. This may cause losses to the project. , the responsibility shall be borne by Party A.

2. Materials provided by Party B: For details, please see Appendix 3 "List of Materials Provided by Party B"

The materials provided by Party B must comply with national standards, have quality and environmental protection inspection certificates and have Product names, specifications, models, manufacturer names, factory addresses, etc. with Chinese markings shall not be made of building decoration materials and equipment that have been eliminated by the state, and shall be approved by Party A. Used for residential decoration stipulated in this contract, unless approved by Party A Party agrees and shall not use it for other purposes. If Party B violates this provision, Party A shall be compensated double the price of the misappropriated materials. If the materials provided by Party B are counterfeit goods, Party A shall be compensated at double the price of the materials provided.

If the materials and equipment provided by Party B do not meet the quality and environmental protection requirements or have different specifications, they shall be prohibited from use. If it has been used, Party B will be responsible for any losses caused to the project.

5. Production safety

The construction drawings or descriptions provided by Party A and the construction site should comply with fire prevention. Accident prevention requirements mainly include that electrical, communication lines, gas pipelines, tap water and other pipelines are smooth and qualified. Party B shall take necessary safety protection and fire-fighting measures during construction to ensure the safety of workers and adjacent residents and prevent pipes in adjacent residents' houses from being blocked. Accidents such as water leakage, power outage, damage to items, etc. occur. Various solids, flammable liquids and other wastes formed during the shipping and repair process shall be stacked and removed according to the prescribed location, method and time. If the above situation occurs and Party A is responsible, Party A will be responsible for compensation; Party B will be responsible for repairs and compensation.

Party B shall strengthen production safety and conduct civilized construction during the construction period. Party B shall be solely responsible for any work-related injuries or deaths.

6. Changes in construction content and construction period:

During the construction process, Party A must contact Party B in advance when proposing design modification opinions and adding or deleting engineering items. After signing the "Engineering Project Agreement" The construction of the project can only be carried out after a change order has been issued (see Appendix 4 for details). Any increase or decrease in costs or changes in the construction period caused by this shall be negotiated by Party A and Party B.

If Party A privately agrees with the workers to change the construction content, Party A will be responsible for all consequences. If it causes losses to Party B, Party A shall compensate.

7. Project Quality and Completion Acceptance Methods

1. The quality of this project is based on construction drawings, instructions, design changes and the "Hangzhou Industrial Standards for Construction Quality of Residential Decoration and Renovation Projects" Evaluate acceptance criteria.

2. After the decoration project is completed, the project quality and environmental protection requirements should comply with relevant national standards.

3. For project quality problems caused by Party A, the rework costs will be borne by Party A and the construction period will be postponed.

4. If a quality accident occurs due to Party B’s fault, the rework costs will be borne by Party B and the construction period will remain unchanged.

5. Party B shall promptly notify Party A to handle the inspection and acceptance procedures for concealed projects and intermediate projects (see Appendix 5 "Project Quality Acceptance Form"). If Party A cannot participate in the acceptance inspection on the scheduled date, Party B shall Organize personnel to conduct acceptance inspection, and Party A shall acknowledge it in writing.

6. After the construction period is completed, Party B shall promptly notify Party A for acceptance, and Party A shall conduct acceptance within seven days after receiving the acceptance notice.

8. Liability for breach of contract

1. After this contract is signed and becomes effective, Party A and Party A shall fulfill all the terms stipulated in the contract (including contract attachments, budgets and drawings confirmed by both parties, etc. ), shall not be changed or terminated without authorization, otherwise the breaching party will pay the other party a liquidated damages of 10% of the total project budget and bear other economic losses caused thereby.

2. If the start of construction is delayed or stopped midway due to Party A’s reasons, Party A shall compensate Party B for the losses caused by the stoppage or delay in work. Party A shall pay Party B RMB yuan for each day of work suspension or delay; if Party A fails to pay as stipulated in the contract, Party A shall pay liquidated damages at the rate of % of overdue payment for each overdue day.

3. If the construction is overdue due to Party B’s reasons, Party B shall pay Party A Yuan for each day overdue.

4. Party A has not completed any formalities and requires Party B to change the structure and use of the house. Party A will be responsible for and bear the losses caused by the resulting losses or accidents (including fines).

5. Without the consent of Party A, Party B changes the structure and use of the house without authorization. Party B will be responsible for and bear the losses resulting from any losses or accidents (including fines).

9. Project Warranty:

1. For "double-guaranteed" projects that include labor and materials, the warranty period is two years, calculated from the date of completion acceptance. Kitchens, bathrooms and exterior walls that require waterproofing are required to be leak-proof for five years. The warranty period is calculated from the date of completion and acceptance of the residential interior decoration project.

2. If quality problems are caused by Party B, Party B will repair them unconditionally.

3. Damage caused by improper use by Party A, or failure to use normally, is not covered by the warranty.

4. This warranty is valid after being signed and sealed by Party A and Party B.

10. Dispute Resolution

If a dispute occurs during the Zhuoyin decoration project, it can be resolved through negotiation or mediation. If the parties are unwilling to negotiate or mediate, or if negotiation or mediation fails, the parties may handle the matter in the following ways:

(1) Submit to the Hangzhou Arbitration Commission for arbitration;

(2) File a lawsuit with the people in accordance with the law Proceed in court;

11. Other agreed matters

1.

2.

12. This contract is in duplicate, with have the same legal effect. The contract attachments are an integral part of this contract.

Party A: Party B:

Name (signature): Organization name (seal):

Address: Legal representative:

Address: Authorized agent:

Postal code: Postal code:

Telephone: Tel:

Industrial and commercial business license number:

Residential decoration Enterprise qualification certificate number:

Account opening bank:

Account number:

Tax ID number:

Year, month and day

Visa comments:

Visa officer:

Visa authority (seal)

Year, month and day

Attachment 1: Construction content table< /p>

Attachment 2: List of materials and equipment provided by Party A

Attachment 3: List of materials provided by Party B

Attachment 4: Change order for the project

Attachment 5: Project Quality Acceptance Form

Attachment 6: Project Warranty Form

Attachment 7: Construction Business Notice

Attachment 1: Construction Content Table

Name of sub-projects

Project requirements (decoration content, materials used, construction requirements, contracting method)

Floor

Wall Body

Ceiling

Doors and Windows

Furniture

Bathroom

Kitchen

Water and electricity , Engineering construction

Renovation

Others

Representative of Party A: Representative of Party B:

Year, month and day

Appendix 2: List of materials and equipment provided by Party A

Serial number

Name of material or equipment

Brand

Specifications and models

Quality level

Unit

Quality certificate

Environmental protection certificate

Quantity

Unit price

Supply time

Delivery location

Party B’s acceptance comments

Party A’s representative: Party B’s representative:

Year, month and day

Attachment 3: List of materials provided by Party B

Serial number

Decoration content

Material specifications and models

< p> Brand

Grade

Quality certificate

Environmental certificate

Quantity

Unit

Unit price

Combined price

Party A’s acceptance opinions

Party A’s representative: Party B’s representative:

Year, month, day< /p>

Attachment 4: Project Change Order

Change content

Original price

New price

Reduction amount (, -)

Detailed description:

Original project amount

Amount paid by Party A

Yuan

< p> Yuan

Increase project amount

Decrease project amount

(increase-decrease) amount

Settlement amount payable

Yuan

Yuan

Yuan

Yuan

Representative of Party A: Representative of Party B:

Year, Month, Day

Attachment 5: Project Quality Acceptance Form

Date

Inspection item name

Inspection results (passed, unqualified| Supplementary inspection)

Signature of Party A

Completion acceptance assessment of the overall project

Representative of Party A: Representative of Party B:

Note: Sub-item Inspection scores: Mark "√" if qualified, "×" if unqualified, and "√" if qualified for re-inspection.

Year, Month, Day

Attachment 6: Project Warranty Form

Company Name

Warranty Phone Number

Customer Name

Contract number

Address of the renovated house

Contact number

Person in charge of the construction unit

Person in charge of construction< /p>

On-site construction date

Year month day to year month day

Completion acceptance date

Warranty period

Years Month day to year month day

Warranty record

Other agreements

Representative of Party A: Representative of Party B:

Year month day

p>

Attachment 7: Construction Business Notice

Customer Name

Construction Location

Contact Number

Construction Person in Charge< /p>

Construction date

Contact number

Serial number

Business name

Specific arrangement requirements

Description:

Party A’s signature (seal):

Year, month and day

Party B’s signature (seal):

Year Month day