Question 2: Tile floor design scheme 30 points Landlord:
Tile design should be done in plan, and all areas should be filled in with cad.
As for the quantity, I don't know what size bricks you use, 450x300 bricks, 1 square, 8 bricks,
1 square of 300x300 is 3 of10,600x600 and 2 of 800x800, and the quantity = 1 square/tile area (length x width).
Question 3: The floor plan of tile design has no spectrum, and the price of tile is also divided into models. You didn't make it clear that the price of 600*600 floor tiles ranges from 10 yuan to 100 800 * 800 yuan, and the low budget for home improvement ranges from 10 to 1000 600 yuan, so buy more than 20 yuan, 800 * 800 yuan. I don't know what brick you are going to lay.
Question 4: Does the indoor floor plan use painted floor tiles? Where there are provisions, those provisions shall prevail.
If there are no rules, it will be simple. Express clearly and use words if possible.
Question 5: Graphic design of floor tiles in the hall. The size of each tile is 10, which is divided into plan (plan) and drawn by CAD software.
The seemingly simple floor tile layout is actually very troublesome and requires very careful layout. If this work only depends on the decoration layout provided by customers (all furniture and equipment are in it), we can only make a preliminary plan first, then go to the site to measure and finalize it, and then adjust the size and regulations.
It's not easy to take a sideline. There are too many things to manage in arranging bricks, and it is very laborious to meet the situation of not meeting the standard.
Question 6: Urgent! How to lay the floor tiles of CAD plan in PS? ? 10: First, process the CAD file, and close or delete all the padding, words, marks, etc. , and keep the filling profile.
As shown in the figure below,
Then print it into PDF format with virtual printer,
Open it again with PS and create a new white background layer. If you think the lines are not clear, you can copy an extra line layer, which will be much clearer.
Then use the magic wand tool to extract the selection to be filled,
Create a pattern layer with the following effect.
The others are similar to this one.
Question 7: Have you ever done tile design? Can you teach me how to fill in the floor plan in CAD with the picture of ceramic tile, just like the picture, it will be completed in PS 20 minutes. Filled with ceramic tile material. If you want a pattern, stack the positive or soft light you designed, and choose a suitable pattern to stack. Create a clipping layer for the range.
Question 8: Solve, seek a detailed tutorial, want to make a floor plan of ceramic tile design in 20 minutes, can't you use CAD directly? If it is rendering, use 3D. Our company uses Fiona Fang, a four-dimensional starry sky design software, but it doesn't feel as real as 3DMAX. If you want to design tiles, you must use 3DMAX. Using PS for the next step will have unexpected effects. But there is a premise that there must be ceramic tile materials, and no software can do without materials. If the design company wants to have a drawing rate, it is recommended to buy more templates, import ceramic tile elements and re-render. Remember that the computer graphics card is higher than the CPU, which can speed up the drawing. ) Make a simple plan with CAD.
Question 9: How to design ceramic tile decoration drawings on the computer? Using autocad
Question 10: Can you see the size according to the tile layout in the construction drawing? Talk about some experiences and share them with you.
1, a formal architectural design should have the signature of the designer, the signature of the person in charge of the architectural drawings, the signature of the reviewer, the signature of the proofreader, and the seal and the registered practice seal.
2. In architectural design drawings, the length is generally in mm, unless otherwise specified; Pay attention to the combination of "building material description" and other drawings when reading drawings. In the "Description of Building Materials", each item is marked with "√", which is the practice adopted in the design. What is not ticked is not the design practice.
3. As shown in the architectural design: "c20 reinforced concrete jl(240400) with 4φ 16 wound φ 6 @ 200 stirrups." The foundation beam of reinforced concrete structure with strength C is 240mm wide and 400mm high. It is equipped with four main steel bars with a diameter of 16mm (16 mm), and a rectangular ring of steel bars with a diameter of 6 mm is hoop every 200 mm (the rectangular ring is about 340-350mm long and about 180 mm- 190 mm wide).
4. For example, in architectural design: "c20 concrete column (240240) with 4φ 12 hoop] 6 @ 200." Where "] 6 @ 200" is a nonstandard label and should be "φ 6 @ 200". It is interpreted as: a c20-strength small beam of reinforced concrete structure, with a section length of 240mm and a width of 240mm, is equipped with four main bars with a diameter of 12mm (12mm), and a rectangular steel mesh with a diameter of 6cm is hoop every 200mm. The height of the column depends on the height of the floor marked by the project minus the height of the ring beam and the thickness of the panel, because the ring beam and the panel are poured together.
5. For example, m5 cement mortar is used to build mu 10 shell lime-sand brick in the architectural design. "m5" indicates the strength grade of cement mortar and "mu 10" indicates the strength grade of lime-sand brick. Mu 10 represents the average compressive strength of lime-sand brick ≥ 10mpa.
6.ql stands for ring beam and ring beam, which is usually used in brick-concrete building structure (mixed structure), that is, the wall is built first, and then the ring beam and the reinforced concrete on the surface are poured.
7, the practice of frame structure, namely pouring column, beam, beam, plate, etc. Dismantle the formwork and then build the wall.
8. According to the requirements of quality supervision, the contractor may be required to provide the certificates of reinforcement (each batch), cement (each batch), mu 10 lime-sand brick (each batch) and cement concrete test certificate.
Key points of architectural drawing review:
Before the project starts, it is necessary to read and review the drawings, and then carry out the blue prints.the design work. If you have experience in reading and examining drawings, and master some key points, you will get twice the result with half the effort. Now I will talk about my experience in drawing and examining drawings for reference.
The procedures of drawing recognition and drawing review are: familiar with the functions of the proposed project, familiar with and reviewing the plane dimensions of the project, familiar with and reviewing the elevation dimensions of the project, checking whether there are errors in the error-prone parts of the construction drawing and checking whether there are improvements.
First, be familiar with the functions of the proposed project.
After you get the drawings, first understand what the function of this project is, is it a factory building or an office building? Is it a mall or a dormitory? After understanding the function, think of some basic sizes and decorations. For example, the floor of the bathroom is generally made of ceramic tiles, and the floor elevation of the bathroom and balcony buildings is generally a few centimeters lower; The scale of the workshop must meet the needs of production, especially the needs of equipment installation. Finally, read the architectural description and be familiar with the project decoration.
Second, be familiar with and review the plane dimensions of the project
The construction plan of a building project usually has three aspects. The first dimension is the detail dimension, the second dimension is the axis dimension and the third dimension is the total dimension. Check whether the sum of the first dimension is equal to the second dimension, whether the sum of the second dimension is equal to the third dimension, and pay attention to whether the edge axis is the center line of the wall. The drawing habit in Guangdong Province is that the side axis is the outer line of the external wall. Look at the size of the project plan, first understand the construction plan, then understand the construction plan of this floor, and finally understand the construction drawings of water, electricity and air conditioning installation, equipment technology and secondary decoration, and check whether they are consistent. After being familiar with the size of the apartment, check whether it meets the use requirements, such as checking whether the apartment is convenient to use and whether the lighting and ventilation are good. When reading the dimensions of the next floor plan, check whether there is any inconsistency with the upper floor plan.
Three, familiar with, audit project elevation size
Construction drawings of building projects generally include elevation, profile and stair profile, all of which have information about the elevation dimensions of the project; The elevation of this floor is generally marked on the building plan and construction plan; In the beam table, there is generally beam surface elevation; Basic details and other details are generally marked with elevation. Through these construction drawings, we can master the elevation dimensions of the project.
Front view usually ... >>