Model earthwork contract (5 copies in total)

With the establishment of people's legal consciousness, we use contracts more and more, and signing contracts can effectively restrain breach of contract. Then do you know the format of the contract? The following is a sample of earthwork contract (generally 5 copies) that I have compiled. I hope it will be helpful to you.

Earthwork Contract 1 Party A:

Party B:

1. Party A needs to transport sand and gravel when building a 3.2km cement road in Xinzhailiang Village, and Party B's existing large double-bridge vehicles can be used for Party A's sand and gravel transportation. After many negotiations, Party A and Party B reached an agreement that all the 3.2 km cement road required by Party A will be transported by Party B's vehicles. The agreement is as follows.

Two. The specific negotiation details are as follows:

1. The river sand required by Party A is Wang xx, which is settled by Party A for Party B and transported by Party B to the yard used by Party A, and the settlement amount is per cubic meter 135 yuan.

2. The stone materials used by Party A shall be settled by Party B, per cubic meter 1 10 yuan.

3. Payment method: Party A will pay 50% of the materials and freight paid by Party B to Party A on the spot.

4. Party A must pay Party B more than 50% of the amount owed on the 3.2km cement road transported by Party A within _ _ _ _ _ _ _.

5. Party A invites Party B to transport sand and gravel for Xinxiang 3.2km road, and Party B shall not delay Party A's construction materials for any reason, otherwise, Party B shall bear the responsibility of shutdown.

6. When Party B starts Party A's normal construction, Party B shall undertake all the gravel transportation business of Party A, and Party A shall not arrange any other vehicles to haul materials into the site (except long-distance gravel). If Party A drives into the site with materials, Party B has no right to interfere. In addition, when Party A breaches the contract, it must settle all the materials and freight at one time.

Seven. The above contract was reached by both parties after careful consideration, and neither party may break the contract or go back on its word for any reason. If either party breaches the contract, it shall bear the penalty of 20% of the total transportation price.

8. This contract is made in triplicate and shall come into effect as of the date of signature.

Party A:

Party B:

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Earthwork Contract 2 Name of Party A:

Name of Party B:

Based on the legal principles of fairness, justice, equality and mutual benefit, according to the Contract Law of People's Republic of China (PRC), the Labor Law of People's Republic of China (PRC), the Economic Law of People's Republic of China (PRC) and other relevant laws and regulations, combined with the specific conditions of the project undertaken, in order to clarify the responsibilities of both parties, ensure the project progress and construction quality, and facilitate contract management, Party A and Party B have reached the following agreement on the joint contracting of earthwork through consultation:

I. Contents of the Contract

1. This contract stipulates that Party A and Party B shall form a joint contractor, and * * * shall sign the main earthwork contract with the participating consortium and the general contractor of Chongqing Liangjiang New Area.

2. This contract stipulates to sign a master contract with the management committee of Chongqing Liangjiang New Area and the general contractor with the qualification of Party A's company.

3. As stipulated in this contract, before Party A signs the main contract with the management committee of Chongqing Liangjiang New Area and the general contractor of the project, Party B shall make capital verification at the request of the management committee of Chongqing Liangjiang New Area and the general contractor of the project, and issue a capital verification certificate of 3% of the total project amount 10%.

4. As stipulated in this contract, after Party A signs the master contract with the management committee of Chongqing Liangjiang New Area and the general contractor of the project, Party B will pay a deposit of 3% of the total project price agreed in the master contract, and Party B will remit the deposit to the designated bank account within the time specified by the management committee of Liangjiang New Area and the general contractor of the project.

5. The payment method and time of the project payment shall be implemented as agreed in the main contract. After the management committee of Liangjiang New Area allocates the monthly project progress payment, Party A shall deduct xx yuan (in words: xx yuan) from the earthwork quantity completed by Party B as the project management fee, and the project funds after deducting the management fee shall be allocated to Party B's account, and the allocation time shall not exceed 3 working days after the allocation time of the management committee of Liangjiang New Area.

6. As stipulated in this contract, the allocated project funds shall be allocated to the special bank account of Company A in Chongqing Liangjiang New Area Management Committee, which shall be jointly managed by both parties, and neither party may occupy, misappropriate or illegally handle it, and the funds shall be used exclusively. When Party B maliciously defaults on the project payment of its subordinate engineering construction unit, Party A has the right to notify Party B's descendants to pay the overdue project payment, and deduct the paid part from the project payment.

7. According to the provisions of this contract, Party A shall assign management personnel to be responsible for the organization, coordination, command and management of this project, the management of project construction contract, construction drawings and related materials, the management and control of construction progress, the safety management of the construction site, and the coordination and liaison of internal and external affairs of the project. Party A is responsible for the construction of temporary facilities such as engineering headquarters office, temporary canteen for management personnel and temporary housing. Responsible for the management of oil supply and scheduling.

8. As stipulated in this contract, after the signing of the main contract, Party B will organize an engineering team to carry out construction management and excavation of xx% (about xx square meters) of the total earthwork signed in the main contract, and Party A will organize an engineering team to carry out construction management and excavation of xx% (about xx square meters) of the total earthwork signed in the main contract.

9. After the management committee of Chongqing Liangjiang New Area or the general contractor of the project issues the notice of entry, Party A is responsible for sending management personnel to the site, and organizing the construction team to enter the site according to the specified time to carry out earthwork excavation belonging to Party A; Party B is responsible for organizing the construction team to enter the site according to the specified time to carry out the construction and excavation of the earthwork excavated by Party B. ..

Second, the responsibilities of both parties.

(I) Party A's responsibilities

1. Party A is responsible for providing the design and construction drawings designed by the management committee of Liangjiang New Area, the general contractor of the project and the design institute, organizing the entrusted survey and elevation control of the red line coordinates of the site, and submitting them to the construction teams of Party A and Party B for lofting and construction.

2. Party A is responsible for organizing the site management personnel to organize and coordinate in a unified way according to the contract, manage the construction work of each project department and construction team of both parties, and ensure the project progress and construction quality. Conduct safety management and inspection, organize safety study and education, and supervise all construction units and teams to implement safety facilities and safety measures. Organize engineering emergency rescue, safety investigation and accident treatment.

3. Party A is responsible for the supply and coordination of related consumables and oil products, and is responsible for entrusting the survey unit to conduct on-site survey, final accounts of the project and completion acceptance.

(II) Party B's responsibilities

1, strictly abide by safety production and civilized construction, and strictly implement the policies, regulations and instructions of Chongqing Liangjiang New Area Management Committee, general contractor and engineering headquarters. Obey and cooperate with the organization, coordination and management of Party A's site management personnel.

2. Party B is responsible for handling the relevant procedures of subordinate construction units and units, as well as the relevant certificates and qualifications required in the construction procedures. Responsible for improving subcontract and contract management with subordinate subcontractors and teams. Responsible for purchasing industrial accident insurance and other insurance for all construction personnel under his command.

3. Party B is responsible for the personal safety and civil liability of the subordinate construction personnel during the construction. Be responsible for the safety accidents in the construction process of each construction unit under its jurisdiction. Responsible for handling temporary residence permits and related matters for non-Chongqing local hukou personnel.

4. Party B is responsible for the accommodation and temporary office facilities required by its subordinate construction personnel, and for the parking and storage of its own construction machinery and equipment.

III. Project Location:

The project site shall be subject to the contract and engineering drawings signed by Party A with the general contractor and the management committee of Liangjiang New Area, and shall be designated by both parties through consultation.

Fourth, the construction safety

In the process of construction, all safety accidents are identified according to the specific circumstances of accident responsibility. Who is mainly responsible for the team? Party A is responsible for the safety of Party A's construction team personnel and Party B's construction team personnel. If a safety accident occurs in the cross operation between Party A and Party B, it shall be resolved through consultation according to the accident responsibilities of both parties.

Five, engineering and technical requirements:

The engineering teams of Party A and Party B shall carry out the construction according to the design drawings, the current construction specifications and the technical requirements of the engineering headquarters and the project department, and make safety construction disclosure and organize the construction. Road maintenance and sanitation in the process of earthwork transportation shall be settled through negotiation by the plots and districts to which Party A and Party B belong.

Six, the calculation of quantities:

The calculation of excavation quantity shall be based on the construction drawings provided by the management committee of Chongqing Liangjiang New Area and the general contractor or design unit (the comprehensive unit price of excavation includes all contents such as earthwork excavation, transportation, backfilling, soil abandonment, site leveling, dredging, table shifting, etc. According to the requirements of the general plan and construction drawings).

Seven. Other agreements:

1. For matters not covered in this contract, Party A and Party B shall sign a supplementary agreement after negotiation, and the supplementary agreement shall have the same legal effect as this contract.

2. If the main contract signed between Party A and Chongqing Liangjiang New Area Management Committee is invalid or Party A has not signed a contract with Chongqing Liangjiang New Area Management Committee, this contract will automatically become invalid.

3. This contract shall come into effect after being signed by both parties, and shall be terminated after both parties have fulfilled their obligations stipulated in the contract.

4. The original of this contract is in duplicate, one for each party, and four copies, which shall be submitted to the management committee of Chongqing Liangjiang New Area and the general contractor for filing and the relevant departments for review.

Party A (seal)

Party B (seal)

Time:

Earthwork Contract 3 Party A:

Party B:

In order to clarify the rights and responsibilities of Party A and Party B, according to the Contract Law of People's Republic of China (PRC), Construction Law of People's Republic of China (PRC) and other relevant laws and regulations, combined with the actual situation of this project, and following the principles of equality, voluntariness, fairness, honesty and credibility, both parties reached an agreement on the construction of this project.

I. Project name:

Second, the project site selection:

Third, the work content:

Level the site, organize labor and technical equipment, excavate earthwork by blasting, remove surface obstacles, dredge, allocate earthwork on site, transport, muck, safety protection facilities for surrounding buildings and residents, compilation of engineering data, compaction sampling test, and site safety and civilized construction measures are the same as those of surrounding government units including sanitation, urban construction, public security, transportation, construction committee, street offices, neighborhood committees and surrounding enterprises (businesses).

Four. Scope of work:

According to the construction drawings provided by Party A and the construction organization design approved by Party A, the construction will be carried out in the designated area on site, and the remaining soil will be transported to the slag yard, which will be implemented by Party B itself, and Party A will not be responsible for it.

V. Term of the contract:

Commencement date: xx year, xx month, xx day; Completion date: xx year, xx month, xx day. The total calendar days of the contract period is xx days.

Contract price of intransitive verbs:

This contract adopts a lump sum contract with unit price, that is, Party B shall be responsible for the labor costs, materials costs, machinery costs (including the import and export fees of machinery and equipment), management fees, insurance fees, profits, taxes, environmental sanitation slag fees, spoil fees and social relations coordination around the project, and its unit price is:

1, the backfill part is on site.

(1) shale (loose rock) backfill, with the lump sum price of RMB /m3.

2, more than soil outbound part

(1) No matter how far the transportation distance is, the quantity of outbound transportation shall be implemented at the lump sum price of RMB /m3.

3. Others

If Party A needs to temporarily rent machinery and equipment from Party B, the rent shall be calculated according to the market price during the lease period, and the shift of machinery and equipment shall be subject to the visa of the personnel designated by Party A. ..

Seven, project settlement:

After the project is completed and accepted, the settlement shall be made according to the field measured grid of Party A and Party B and the actual quantity of the receiver. After the settlement is completed, 85% of the settlement amount will be paid in one lump sum, and the balance will be paid within two months.

Eight, engineering quality and technical requirements:

This project is constructed and accepted in strict accordance with the current national Code for Acceptance of Construction Quality of Earthwork Blasting Engineering, Standard for Inspection and Evaluation of Construction Engineering Quality and Code for Acceptance of Construction Quality of Building Foundation and Foundation Engineering. At the same time, the contract stipulates that:

1. After the earthwork construction is completed, the error between the acceptance elevation and the design elevation is not greater than 10cm, and the vertical plane is unbiased.

2. Before Party A enters the site for construction, it must submit to Party A 7 days in advance: earthwork allocation and outbound construction plan, safe and civilized construction plan and quality progress guarantee measures.

3. The filled soil in the site must be compacted by layers, and it is best to backfill the earthwork in shale. If the earthwork in shale is left, sand and gravel shall not be backfilled.

4. Within 6m of the outer edge of the building and its foundation, the backfill earthwork must be rolled by layers, and the compactness shall not be less than 90%.

5. As-built data is a single slide.

Nine, safety construction:

Party B shall carry out the construction in strict accordance with relevant national safety construction codes and take strict and effective safety protection measures. During the construction period, Party B shall be responsible for any accidents related to this project.

X. liability for breach of contract:

1. Subcontracting is not allowed for this contract project. If Party A verifies that Party B has subcontracted, Party A has the right to terminate the contract unilaterally, and Party B must leave unconditionally within 3 days after receiving the written notice from Party A, and bear 20% of the total project workload as liquidated damages.

XI。 This contract is made in sextuplicate, with Party A holding four copies and Party B holding two copies. It will come into effect after being signed and sealed by both parties, and will naturally become invalid after the project is accepted and the balance is settled. Other matters not covered shall be settled by both parties through consultation.

Employer:

Contractor:

Date:

Earthwork Contract 4 Party A:

Party B:

Party A and Party B, through consultation, have reached the following agreement on the earthwork transportation of xx project:

I. Scope and method of contracting:

1. Contract scope: earthwork transportation (all expenses)

2. Contracting method: transportation expenses, safety, fuel, excavator and other mechanical shifts, Party B's entry and exit expenses, workers' social security and all expenses encountered in the transportation process are included in the comprehensive unit price (that is, one party will settle at xx yuan, excluding any taxes).

Second, the contract price:

Contract unit price:

Third, the engineering survey:

1. According to the construction scope specified by Party A, the measurement shall be based on the number of people signed and confirmed by the site engineer and relevant supplementary terms.

2. The unit price stipulated in the contract is a comprehensive unit price, including the fuel cost of machinery and equipment, labor cost, social security of workers, all entry and exit expenses of Party B, all expenses encountered during transportation and living expenses.

Four. Payment method:

1, xx% of the unit price shall be paid for each completed square meter of the project, and the balance shall be settled before xx, xx, xx.

2. If Party B breaches the contract halfway or fails to meet the requirements of Party A due to its own reasons, Party A has the right to deduct the performance bond without paying it.

V. Term of the contract:

1, and the contract period is before xx month xx year.

2. According to Party A's overall construction schedule, Party B shall prepare a sufficient number of dump trucks (dump trucks) and obey Party A's arrangement at any time.

The responsibility and system of intransitive verbs;

1, Party A's responsibility

(1) Party A shall provide construction drawings and underground concealed facilities drawings (including underground pipe network facilities such as water, electricity and gas pipelines). ).

(2) Assign working faces according to the construction needs, and notify Party B of the specific construction progress plan xx days in advance.

(3) Party A designates a special person to exercise the right to conclude an agreement.

(4) Provide Party B with the production site during on-site transportation.

(5) Pay in time as agreed.

2. Party B's responsibilities

(1) Party B is responsible for contacting the spoil ground and relevant road traffic departments for coordination, and the above expenses shall be borne by Party B..

(2) Obey Party A's work arrangement for completing this project, and accept various management systems of the construction site designated by Party A. ..

3, the construction site safety system

(1) Personnel entering the construction must receive safety education and disclosure before taking up their posts, and must hold a post card. Anyone who goes to work without safety education and disclosure will be responsible for any accident or accident.

(2) The personnel entering the site shall regularly attend the safety production meeting held by Party A. ..

(3) It is forbidden to wear slippers, and people who don't wear helmets are not allowed to enter the construction site, and the hanging safety signs are not allowed to be removed at will.

(4) In case of a safety accident due to Party B, Party B shall bear all the responsibilities and expenses, and Party A shall not be jointly and severally liable.

4, civilized construction management system

(1) Construction machinery and equipment shall be parked according to Party A's arrangement, and it is not allowed to stop or put it anywhere.

(2) Ensure the civilized construction and cleanliness of the site, and clear the site after work.

(3) When Party B violates the above provisions, each person will be fined 50 yuan every time.

(4) The laborers of Party B must sign a labor contract, and hand over a copy of the contract to Party A for safekeeping. If any worker leaves midway, he/she must show his/her salary list and leave the site only after being approved by Party A's management.

(5) to deal with the wage problems of employees in this unit, such as internal labor disputes. If Party B has a labor dispute involving Party A, Party A has the right to deduct money from Party B's project payment and pay wages directly to the workers.

Seven. Entry into force and number of copies of the agreement:

1, which shall come into effect as of the date when the representatives of both parties of Party A sign it, and shall be invalid after the project is completed, settled and paid. Matters not covered in this contract shall be negotiated by both parties separately, and shall be taken as supplementary documents of this contract in the form of supplementary agreement.

2. This agreement is made in triplicate, two for Party A and one for Party B, with the same legal effect.

Party A:

Party B:

Date:

The fifth contract earthwork developer (Party A):

Contractor (Party B):

In accordance with the Economic Contract Law of the People's Republic of China, the Construction Law of People's Republic of China (PRC) and other relevant laws and administrative regulations, following the principles of equality, voluntariness, fairness and good faith, Party A and Party B, based on the principle of mutual benefit, have reached the following agreement on matters related to earthwork construction through consultation:

I. Overview of the Project:

Project Name: Guiyang Huaguoyuan Project Pingji Large Earthwork Excavation Project Location: Pengjiawan, Guiyang Huaguoyuan

Second, the project contracting project:

Single transportation of earthwork: Party A is responsible for loading the car, and Party B is responsible for transporting it to the designated area by car. Party B is responsible for taking the soil from Pengjiawan borrow site designated by Party A and transporting it to the designated area of Dawa Village, with a distance of 13km. (If the transportation distance exceeds 13km, 25 yuan will be charged for each vehicle from 13.2 to 14km. 15km plus 14 yuan).

III. Term of the contract:

From 20xx65438+February 30th to 20xx65438+February 30th.

Four, the specific acceptance method of the project:

1. The receipt record of the seal card shall be used as the basis for the settlement of quantities, but the acceptance sheet must be consistent with the record, and the vehicle load is insufficient to be subject to the acceptance record of the seal card. If the number of manual records does not match and the reason cannot be found out, the number with less records shall prevail.

2. All vehicles entering Party B's site must be approved by Party A's metrological personnel. After the vehicle measurement is completed, Party B shall apply to the financial settlement team for a record card. Party B shall first load the mud with the mud head stuck in the construction site. Upon completion, the management personnel above Party A will check the vehicle volume and sign the acceptance card. Party A will arrange mud unloading at the designated place. The mud unloading driver will hand over the acceptance certificate to the following management personnel of Party B for inspection and signature, and then the driver will hand over the acceptance certificate signed by the upper and lower management personnel to the management personnel of Party A for confirmation. Mud trucks without record cards signed by superior and subordinate managers will not be used as the basis for acceptance.

Verb (abbreviation of verb) Contract unit price, price and settlement method:

1. Remarks on unit price and total price of the project

The project is expected to transport 3.3 million cubic meters of earth and stone. This contract is based on the transportation of 2 million cubic meters of earthwork in the first phase of the project. If Party A and Party B perform this contract as scheduled, Party A will give priority to Party B's subsequent earthwork transportation projects.

2. Payment method:

Party A shall settle the account by cash or bank transfer every day and pay Party B the transportation fee at the unit price of 220 yuan per train. (This unit price is after-tax price, and Party B is not responsible for providing official invoice to Party A), and the payment shall not exceed the morning of the third day of settlement time at the latest.

3. Party A is responsible for paying Party B's transportation expenses within the specified time. If Party A fails to pay on time, Party B has the right to stop work and pay 500 yuan/day/car as labor living expenses. If it lasts for more than 3 days or accumulated for more than 7 days, Party B has the right to terminate the contract and ask Party A to pay compensation of 5,000 yuan per vehicle. In case of natural disasters and bad weather, it is not suitable for engineering transportation except that the project cannot be started in time.

The responsibility of intransitive verb Party A:

1. Party A is responsible for handling all transportation vehicle passes for Party B (the value deposit of each certificate is 3,000 yuan, and Party A will deduct 100 yuan per vehicle every day and deduct it within 30 working days). Upon resignation, Party A shall return and pay in full in one lump sum. Party B shall be responsible for keeping the documents properly and shall not lend them at its own risk.

2. Party A is responsible for allocating filling resources and digging and loading equipment, and ensuring that there are enough loading and unloading equipment to ensure that Party B can transport vehicles as planned. If Party A can't guarantee the normal transportation project of Party B for more than 3 days, Party A will give subsidies according to the 500 yuan of each vehicle per day. If Party A's equipment fails to meet Party B's vehicle transportation schedule during vehicle transportation, Party B has the right to require Party A to complete equipment deployment within two days to ensure the normal operation of Party B's vehicles. If Party A fails to meet the above requirements, Party B has the right to ask Party A to subsidize vehicles according to 500 yuan.

3. Before Party B's vehicle arrives at the site, Party A is responsible for the vehicle dispatching fee of 7,500 yuan/vehicle, which will be deducted by Party A according to 100 yuan/vehicle/day, starting from 3 working days after the project starts, until the dispatching fee is deducted).

4. Party A is responsible for providing oil supply guarantee for the construction vehicles, ensuring the quantity and quality of the oil products being transported and ensuring the normal transportation of Party B. The oil fee is paid at the market price of the same period. If the oil price exceeds that of 0.5 yuan, Party A shall subsidize the excess.

5. Party A is responsible for the smooth flow of roads and unloading areas during the construction period. Responsible for handling the relationship between traffic police, road administration, urban management, environmental protection and surrounding villagers and relevant departments of the local government.

6. Party A is responsible for arranging and coordinating the management personnel of Party B and other teams in this project, and for the maintenance of transportation roads and pavements to ensure smooth transportation.

7. Party A is responsible for coordinating the relationship between Party B and the construction site, and for Party B's expenses, such as parking fees, management fees, admission fees and dispatch fees.

8. Party A shall provide Party B's motorcade and management personnel with dormitories (the old building will be demolished), Party B shall pay the utilities according to the schedule, and Party B shall solve the daily necessities such as bedding, and make arrangements 1 day before Party B enters the site to ensure the smooth development of all the work.

Seven. Party B's responsibilities:

1. Party B is responsible for organizing 20 double-bridge dump trucks with "internal space" not less than 23 cubic meters. After signing the contract, Party B will arrange 20 vehicles to enter the site for the first time. In the future, Party A and Party B may negotiate to gradually increase the number of vehicles according to the project situation, and Party A shall notify at least 7 days in advance each time. After Party B's vehicle arrives, Party A shall arrange transportation within 24 hours. If there is more than one shift, Party A shall compensate Party B 500 yuan for each shift and make arrangements within three days.

2. Party B shall guarantee that the vehicles will work no less than 20 hours a day and 25 days a month for transportation. At other times, Party B can be responsible for vehicle maintenance.

3. The vehicle certificate provided by Party B is complete, legal and valid. And be responsible for the daily management of drivers and the traffic safety responsibility of vehicles. Party A shall purchase all compulsory personal accident insurance for all personnel entering the site within 5 days from the effective date of this contract, and the expenses shall be paid by Party B according to the insurance invoice provided by Party A. ..

4. Party B must obey the unified organization and management of Party A and the motor vehicle scheduling of Party A's site.

5. Party B's personnel must abide by the law and discipline, and shall not practise fraud. Party A is responsible for handling relevant transportation vehicle passes for Party B, and Party B promises to obey the on-site transportation of the project designated by Party A, and will not transport for other construction teams. If Party A finds that Party B is helping other construction teams to transport, Party A has the right to take back Party B's pass, then Party B will be punished by 10000 yuan (ten thousand yuan only) per vehicle, and if Party B leaves without reason, it will be punished by 10000 yuan (ten thousand yuan only) per vehicle.

6. Party B shall be responsible for the safety of vehicles and motorcade personnel arriving at the site. Party B shall be responsible for any safety accidents and shall not cause any adverse effects to Party A. ..

7. Party B's motorcade shall not leave without reason. If you need to leave, you must inform Party A in writing 15 days in advance, otherwise Party A will not refund Party B the vehicle pass deposit of 3,000 yuan per vehicle.

8. After entering the site, Party B must obey the work arrangement of Party A's construction personnel, and shall not cut in line at will, and can only drive after the car is closed.

Eight. Contract disputes and settlement:

Disputes arising from the performance of this contract shall be settled through friendly negotiation by both parties or through mediation by the government and relevant departments. If negotiation and mediation fail, you can bring a lawsuit to the court.

Nine. comment

1. This contract is approved by both parties, and Party B will arrange construction vehicles to arrive at the site within the agreed time before February 30, 65438+20xx. Within the agreed time, Party A will arrange the construction vehicles to start construction (calculate the transportation cost) before 20xx 65438+ 10/day.

2. Before Party B leaves his post, Party A and Party B set up dual-control accounts in the bank. Party A and Party B shall each deposit RMB 50,000.00 Yuan into the dual-control account. If the vehicle arrives, Party A cannot guarantee the normal transportation of the vehicle. Wait for Party A to default. Party B has the right to terminate the contract, and all the funds in the dual-control account shall be owned by Party B. If the vehicle arrives, Party B leaves without reason or transports for other construction teams, etc., Party B will breach the contract. Party A has the right to terminate the contract, and all the funds in the dual-control account belong to Party A. ..

Party A:

Party B:

Date of signing:

;