The main obligation of the contract is actually to complete the contracted production and operation tasks in accordance with the provisions of the enterprise contract, so do you know what the current contract looks like? I am here to share some brick contracts with you, hoping to help you.
In order to improve the economic benefits of the fish pond, Party A decided to contract out the fish pond after research. Based on the principles of equality, voluntariness and mutual benefit, Party A and Party B have reached the following terms through consultation:
Article 1 Party A will hand over 30 mu of * * fish pond located in _ _ _ _ _ to Party B for contracted breeding, and 8 self-built houses and sites along the fish pond will be handed over to Party B for operating farmhouse music (note: farmhouse music is catering service).
Article 2 The term of this contract is five years, that is, from year to year.
Article 3 Contract amount and payment method: the principle of paying the contract amount first before using it shall be implemented. The annual contract amount of the fish pond is _ _ _ _ _ _ _ _ _ _ _.
Article 4 During the contract period, the power consumption of fish ponds contracted by Party B shall be subject to the management of the power management station, so as to use electricity safely. Party B shall be fully responsible for the account opening, power equipment installation, material cost and electricity fee of the fish pond. In case of any accident, Party B shall be responsible, not Party A. ..
Article 5 Use of fish ponds
1. Party A provides the fish pond to Party B for contracted operation, and Party B must breed aquatic products according to the regulations, and shall not change the use and destroy the fish pond at will, and return it to Party A as it is (including pond foundation repair) upon expiration.
2. Party B is responsible for the expenses of raising fish, releasing fry and taking care of fish ponds (or rivers, reservoirs and lakes).
3. When fishing, Party B is forbidden to use dangerous methods such as electric fish, poisonous fish and fried fish.
Article 6 During the contract period, if Party B needs to build a building or plant crops on the pond foundation, it must be approved by Party A.. After the expiration, Party B shall dismantle, relocate or stop farming. If the new contractor is willing to accept the contract, it can keep it, but never allow the former to keep it. Otherwise, Party A has the right to hire migrant workers to demolish it forcibly, and Party B still has to pay all the required expenses.
Article 7 Party B only contracts the water surface of the fish pond, and the right to use the base surface of the fish pond remains with Party A, and Party B can only use it temporarily. During the term of the contract, when land needs to be requisitioned for national construction or villages and towns, Party A and Party B shall unconditionally obey and this contract shall be dissolved at the same time. The land acquisition unit shall make compensation according to the relevant regulations on land acquisition, and the young crop fee, land compensation fee and other compensation fees shall be returned to Party A. Party B must hand over the fish pond within 30 days after receiving the notice, and the contract payment payable by Party B shall be counted as one month less from the date of issuing the notice. If Party B fails to deliver the fish pond within 30 days after receiving the notice, Party A has the right to terminate the contract without any compensation. The buildings built by Party B shall be demolished by Party B within 10 days after the expiration of the contract, and those that have not been treated within the time limit shall be owned by Party A. If it is necessary to build the pond foundation, Party B shall repair and rectify it by itself, but it shall not be demolished after the expiration of the contract, and Party A will not make any economic compensation.
Article 8 When Party B needs to drain or pump water, Party A shall provide a water pump for Party B in time. In case of theft, poisoning and fish frying, Party A shall actively assist Party B to deal with it.
Article 9 Party B must pay the contract money within the time limit stipulated in the contract. /kloc-If it is not completed within 0/5 days, it will be returned automatically. Party A has the right to confiscate the deposit, terminate the contract, recover the fish pond and re-sign the contract.
Article 10 If Party B has any of the following circumstances during the contract period, Party A has the right to terminate the contract and recover the contracted fish pond free of charge:
1. Party B transfers, sublets, subcontracts or lends the contracted fish pond without authorization, or changes the contractor in the name of cooperation or joint venture (except under special circumstances with the consent of Party A and formalities);
2. Party B abandons farming, ploughs the land, or changes the use of contracted fish ponds without Party A's consent, and engages in destructive and predatory management, which is ineffective after being discouraged by Party A, resulting in the decline of soil fertility and productivity;
3. Party B uses the contracted fish pond to engage in illegal activities, which harms the public interests;
4. Party B's default (including partial default) days;
5. According to laws and regulations, if Party B needs to transfer the contract to others during the contract period, it must obtain the consent of Party A. If Party B terminates the contract ahead of schedule, it must complete all the contract money and obtain the consent of Party A before terminating the contract, and Party A has the right to confiscate the deposit as compensation. Other circumstances related to the termination of the contract.
Article 11 In case of water quality problems or river pollution in the future, the contractor shall not refuse to pay the contract price for various reasons. After the expiration of this contract, if Party A contracts again, under the same conditions, Party B has the priority to contract Article 9.
Article 12 Risk liability:
1. Nongjiale belongs to the service industry, and all related matters such as food safety, hygiene license, taxation, industry and commerce shall be handled by Party B, and all legal affairs involved shall be undertaken by Party B, which has nothing to do with Party A.. ..
2. During the contract period, Party B must purchase agricultural insurance. Otherwise, all accidents, disasters and man-made losses, as well as all production and operation expenses (including safety accidents, insurance premium purchase and losses caused by all accidents and disasters) during the contract period, the creditor's rights and debts shall be borne by Party B, which has nothing to do with Party A. The contract payment is still paid according to the contract provisions, but Party B cannot continue to perform the contract due to major natural disasters of force majeure, and Party B shall promptly notify Party A in writing of the force majeure accidents, which shall be settled by both parties through consultation.
Article 13 This contract is based on the principle of mortgage contracting. When signing the contract, Party B must pay the contract deposit to Party A within _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Article 14 Liability for breach of contract:
1. Without the consent of Party B, Party A shall not terminate the contract in advance.
2. If Party B returns the package midway and terminates the contract in advance, it will be regarded as a breach of contract, and Party A will confiscate all the contract deposit paid by Party B. ..
3. In case of default (including partial default) for __ 10__ days, Party A has the right to terminate the contract, confiscate the contract deposit paid by Party B, and recover the contracted fish pond for free.
Article 12 Measures to settle disputes: _ _ _ _ Procedures _ _.
Thirteenth supplementary consultation part:
Article 14 This contract shall come into effect after being signed or sealed by both parties. Neither Party A nor Party B shall arbitrarily change or terminate this contract. If there are any matters not covered in this contract, both parties shall settle them through consultation. When the contract expires, both parties shall sign a new contract if they are willing to continue to perform the contract.
This contract shall come into force as of the date of signing. If the representative of Party A changes, this contract shall not be changed.
This contract is made in duplicate, one for each party.
Party A (official seal): _ _ _ _ _ _ Party B (signature): _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
Contract number: Dongfeng HeNo. __02:
Party A (Employer) Tel: Address:
Party B (contractor) ID number: Tel: Address:
Article 2 of the Contract: The Employer (hereinafter referred to as Party A):
Contractor (hereinafter referred to as Party B):
In accordance with the Contract Law of People's Republic of China (PRC), the Construction Law of People's Republic of China (PRC) and relevant regulations, and in combination with the specific conditions of this project, this contract is hereby signed by both parties through consultation for their compliance.
Article 1 General situation of the project
1. Project name: Changbao greening project and uptown real estate development project;
2. Project location: No.666 Cuiping Community, Gaotang Street, Wushan County, Chongqing;
3. Scope and content of project contracting: The planting area is about 100㎜, including the excavation, transportation and treatment of the turf on the site, the purchase, transportation and backfilling of the planting soil, the laying of flower beds, the plastering and pasting of ceramic tiles, with the specification of100 ㎜, and the turf planting within the insurance scope.
4. Contracting method: Party B shall bear all expenses such as labor service contracting and material contracting.
Article 2 Project duration: 20__, 1 April -20 _ _, 1 May.
Article 3 Project contract cost:
The contract cost of this project is RMB 35,000 Yuan, that is, RMB 35,000 Yuan only (including tax).
Article 4 Payment and settlement of project price
1. pay RMB 30,000 (thirty thousand yuan only) within thirty days after the completion of the project; After the survival rate of tail treated seedlings and lawn maintenance reaches 100%, it will be paid in one lump sum within 30 days.
Article 5 Project Quality and Inspection and Acceptance
1. The quality requirements of this project are qualified;
2. Party B must carry out the construction in strict accordance with Party A's requirements and accept Party A's on-site supervision and inspection;
3. After the project is completed, Party B shall notify Party A to organize the completion acceptance. After acceptance, hand over the project to Party A. ..
Article 6 Matters for both parties.
1. Party A
(1) Responsible for the coordination of information about the interference and obstacles of the surrounding immigrants;
(2) Provide the construction site as required;
(3) Organize the project completion acceptance and cooperate with Party B for completion settlement.
2. Party B
(1) construction site leveling;
(2) Ensure the quality of the project and complete the delivery as scheduled according to the time stipulated in the contract;
(3) Responsible for the site management and cleaning before the completion of the project;
(4) After the project is completed, the turf and saplings shall be maintained until they are completely alive;
Article 7 Supplementary Provisions
Matters not covered in this contract shall be implemented in accordance with the Contract Law of People's Republic of China (PRC) and relevant regulations.
This contract shall come into effect after being signed and sealed by both parties. After the completion of the contract project, the survival rate of turf and saplings reaches 65,438+000%, and the final payment of the project is settled, which will naturally become invalid after the maintenance period expires.
This contract is made in duplicate, each party holds 1 copy.
The Employer (Seal) and the Contractor (Seal) _ _ _ _ _ _ _
Legal representative (signature): _ _ _ _ _ Legal representative (signature): _ _ _ _ _ _ _ _ _
Authorized representative (signature): _ _ _ _ _ _ Authorized representative (signature): _ _ _ _ _ _ _ _ _
Date of signing: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Regarding Article 3 of the Bricklaying Contract, Party A:
Party B:
At present, under the principle of fairness and justice, there are projects to be constructed at Party A's site; On the basis of equality and mutual benefit, Party A and Party B, through consultation, hereby conclude the following terms and conditions, which are expected to be observed by both parties.
First, the way of contracting:
Party A will contract this project to Party B in the form of contracting and materials, and the settlement will be RMB per square meter of construction area.
Second, Party B is responsible for the reconsideration of the main project and ancillary projects from the foundation platform to the factory building.
Third, the settlement method
Party A shall pay according to the progress of the project and complete the positive and negative projects according to the amount of each completed floor. 95% of the main acceptance project is completed, and the balance will be settled within one month after acceptance.
Fourth, the quality requirements:
Party B shall carry out the construction in strict accordance with the construction drawings and relevant construction specifications, and obey the management and deployment of the builder. In the process of construction, all expenses arising from material consumption or non-compliance with quality requirements shall be borne by Party B..
Five, civilized construction:
Party B shall carry out the construction in strict accordance with civilized construction standards, so as to ensure that people leave the site clearly. Playing cards, fighting, fighting and drinking are strictly prohibited on the construction site, otherwise the construction party has the right to fine.
Six, safety construction:
Party B shall carry out the construction in strict accordance with the relevant building construction safety standards, and all safety accidents that occur during the construction of Party B shall be classified into accident causes. If Party B fails to carry out the construction according to the safety standards, Party B shall bear the great responsibility of ensuring that the safety accidents are minimized.
Seven. This contract is made in triplicate, one for each party, and has the same legal effect after signing.
Party A (signature): Party B (signature)
date month year
Regarding Article 4 of the Bricklaying Contract, both parties to the contract:
_ _ _ _ _ _ _ _ _ County _ _ _ _ _ _ _ _ Commune (township) Enterprise Management Committee (or brigade), hereinafter referred to as Party A; _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
In order to vigorously develop township enterprises, promote small-scale industrial production in rural areas, improve product quality and economic benefits, revitalize the rural economy, and increase collective and individual income, after careful discussion by the commune management Committee (or brigade) and full consultation between Party A and Party B, this contract is hereby concluded for both parties to abide by.
I. Contents of the Contract
____________________________________________________________________
___________________________________________________________.
Second, the contract period
The term of the contract is _ _ _ _ _ _ _ _ _ years.
Three, the contracted output value, profit index, the amount of payment and the method of excess commission.
1. In the first year of the contract period, Party B shall complete the output value of _ _ _ _ _ _ _ _ _ and Party B shall pay Party A the rent of _ _ _ _ _ _ _ _ _.
2._ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Four. Rights and obligations of Party A
1. On the effective date of the contract, Party A shall hand over the following production materials to Party B for management:
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
(Generally delivered to Party B in the form of list)
2. During the contract period, Party A shall provide Party B with _ _ _ _ _ _ _ tons of coal for production, _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
3. Before the signing of this contract, Party A shall be responsible for the creditor's rights and debts of the enterprise.
4. Party A has the right to supervise and inspect Party B's finance and urge Party B to perform this contract.
Verb (abbreviation of verb) Rights and obligations of Party B.
1. Party B must improve the leadership of the factory, improve the systems of production, operation, financial management, administration, wages, labor insurance and welfare, and report the production and operation to Party A on a regular basis.
2. Party B has the responsibility to strengthen the political and ideological education of employees, promote the construction of spiritual civilization, strengthen the education and measures of production safety, and prevent and reduce industrial accidents. Party B's production and operation activities are not bound by policies and national laws. If Party B has an industrial accident during the contract period, it shall be handled according to the relevant national regulations.
3. Party B shall pay taxes to the state on time. Creditor's rights and debts formed during the contract period shall be borne by Party B.. Party B shall conduct democratic financial management, make public financial accounts and accept the supervision and inspection of employees and Party A. 。
4. Party B has the right to manage production, supply and sales independently, recruit technicians and employees by itself, decide employees' salary, adjust their work and dismiss employees according to their production skills, work efficiency, physical condition, labor attitude and execution discipline, and decide the appointment and dismissal of workshop and team cadres by itself.
Intransitive Verb Party A's Liability for Breach of Contract
1. If Party A fails to provide Party B with production and living rooms, machinery and equipment, production sites and tools on time and in quantity, it shall pay _ _ _ _% of the overdue goods price to Party B for each day of delay, and Party B may not pay the amount due to Party A during this period. If Party B can't produce due to Party A's delay in providing goods, it shall be required by Party B..
2. If Party A fails to provide Party B with coal, electricity, diesel oil, gasoline, etc. Pay Party B _ _ _ _ _% of the owed material price on time and in quantity. If losses are caused to Party B, Party A shall also compensate Party B for the losses.
Seven. Party B's liability for breach of contract
1. If Party B fails to complete the payment to Party A on time and in quantity, Party B shall pay liquidated damages to Party A according to the bank's regulations on deferred payment. If the payment is overdue for _ _ _ _ _ months, Party A has the right to terminate the contract in addition to applying to the relevant departments for handling.
2. At the expiration of the contract, Party B shall hand over the factory buildings, living rooms, production sites, machinery and equipment and tools provided by Party A to Party A according to the original list for Party B's operation and management. In addition to natural loss, if there is any damage or loss, Party B shall be responsible for repair or compensation.
Eight. force majeure
During the execution of the contract, if production is interrupted or other economic losses are caused by force majeure natural disasters, after investigation, Party A shall reduce the amount paid by Party B as appropriate according to the actual situation of the losses.
IX. Others
___________________________________________________________________
______________________________________________________________________。
This contract shall come into effect as of the effective date of the contract (or on a certain day of a certain year), and it shall naturally expire at the expiration of the contract. The creditor-debtor relationship formed by Party A and Party B during the contract period will not disappear due to the expiration of the contract. During the execution of this contract, if the representatives of Party A and Party B change, they shall not change or terminate this contract at will. If there are any matters not covered in this contract, both parties shall make supplementary provisions through consultation. Supplementary provisions are the same as these provisions.
The original of this contract is in duplicate, one for each party; A copy of this contract appears in the form of _ _ _ _ _ _ _ _ _ _.
Party A: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Representative: _ _ _ _ _ _ _ (seal)
Bank of deposit: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Account number: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Party B: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ (official seal)
Representative: _ _ _ _ _ _ _ (seal)
Bank of deposit: _ _ _ _ _ _ _ _ _ _ _ _
Account number: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Completed on _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.
Article 5 of Party A's bricklaying contract:
Party B: Yang
In order to develop the aquaculture industry and facilitate the source of piglets for the people in the town, I have reached the following agreement through consultation according to the idle greenhouses in our village to raise pigs, increase people's income and make full use of the existing pigsty:
I. Contents of the Contract
(1) Party A will contract 10 livestock sheds and sites on the farm to Party B;
(2) Party A will contract 50 mu of farmland to Party B;
(3) The infrastructure of Daxiang pig farm project reported by Dagele Township is also within the scope of this contract;
(4) The above general contracting fee is RMB twenty thousand Yuan only (20000.00);
Second, the contract period
The term of the contract is from 5 years to 10 years, starting from 20__ year 65438+ 10/0.
Three. Obligations of Party A
(1) Party A shall not interfere with any project production and operation activities of Party B;
(2) Party A does not participate in controlling the implementation and distribution of the Daxiang pig farm project plan reported by Dagele Township. After that, the funds obtained by Party B shall be operated by Party B itself, and Party A has no right to participate.
Four. Obligations of Party B
During the contract period, Party B must pay the contract fee to Party A at the end of the year.
Verb (abbreviation for verb) is force majeure.
During the execution of this contract, if the agricultural and sideline products produced and operated by Party B are caused by force majeure natural disasters, after investigation and confirmation, Party A shall reduce or exempt the obligations undertaken by Party B according to the actual situation.
Intransitive verb others
After the expiration of the contract, this contract will automatically become invalid. After the expiration of the contract, if both parties are willing to continue to perform the contract, they should sign a new contract. If there are any matters not covered in this contract, Party A and Party B shall settle them through consultation.
7. This contract is made in triplicate, one for Party A and Party B, and one for the township government, which shall come into effect after being signed by both parties.
Attachment: certificate of consent of members of aquaculture association.
Signature of Party A: Signature of Party B:
20__ _ _ _ _ _ _ _