GB 5020 1-200 1
GD 230 1098 0 1
Unit (sub-unit) Project Name Division (sub-division) Project Name
Acceptance parts of the project leader of the general contracting construction unit
Name and drawing number of project leader of professional contracting construction unit.
Check the supervision (construction) unit of the Self-inspection Record of the Construction Unit.
Comments on the acceptance opinions "
1. Application and inspection of materials
2. Division and inspection of inspection lot
3. Embedded parts (or rear embedded parts)
connected node
5. Quality of waterproof layer
"Professional.
contract
build
unit
cheque
evaluate
Supervision result "signature of professional foreman (builder) and signature of construction team leader"
(architecture)
unit
Inspection before acceptance
Conclusion "
Chief Supervision Engineer (signature):
Project professional quality engineer (signature): professional supervision engineer (signature):
Person in charge of the project (signature): MM DD YY (signature of the professional and technical person in charge of the project of the construction unit): MM DD YY.