Current location - Quotes Website - Signature design - How to write the hidden inspection content of decorative bricks in decoration engineering?
How to write the hidden inspection content of decorative bricks in decoration engineering?
Decoration board (brick) concealed engineering quality acceptance record

GB 5020 1-200 1

GD 230 1098 0 1

Unit (sub-unit) Project Name Division (sub-division) Project Name

Acceptance parts of the project leader of the general contracting construction unit

Name and drawing number of project leader of professional contracting construction unit.

Check the supervision (construction) unit of the Self-inspection Record of the Construction Unit.

Comments on the acceptance opinions "

1. Application and inspection of materials

2. Division and inspection of inspection lot

3. Embedded parts (or rear embedded parts)

connected node

5. Quality of waterproof layer

"Professional.

contract

build

unit

cheque

evaluate

Supervision result "signature of professional foreman (builder) and signature of construction team leader"

(architecture)

unit

Inspection before acceptance

Conclusion "

Chief Supervision Engineer (signature):

Project professional quality engineer (signature): professional supervision engineer (signature):

Person in charge of the project (signature): MM DD YY (signature of the professional and technical person in charge of the project of the construction unit): MM DD YY.