Current location - Quotes Website - Signature design - Road construction agreement
Road construction agreement
In the era of continuous progress, men, women and children may need to use agreements, and signing agreements is one of the most effective legal basis. So do you really know how to write a good agreement? The following is the 10 road construction agreement I compiled for you. I hope it will help you.

Road Agreement 1 Dear fellow villagers and people from all walks of life,

Located at the southern tip of xx County, xx Village is a veritable remote mountain village, and it is also the farthest village in the township with the worst traffic conditions. For many years, people in xx village have been trapped on the rugged, curved, bumpy and dusty mountain road, and it is difficult for people to travel and vehicles to get in and out, which brings inconvenience to the production and life of villagers in many natural villages, and there are many security risks. The backward road has seriously restricted the process of economic development in xx.

As the saying goes, "The road is long and Xiu Yuan is awkward." Smooth roads are the basic hardware for developing economy and improving people's quality of life. Now that the national policy is good, the government guides the construction of new countryside. Twenty-three administrative villages in the township have built rural roads 18, and the surrounding villages have stepped onto the pace of new rural construction and rushed to a well-off society. Changing the backward traffic situation has become the common aspiration of all the villagers in xx village, deep in the mountains. At present, the whole village has a high enthusiasm for road construction, and the Tongcun highway construction project has been supported by the superior highway authorities and is listed as the focus of this year's work. It has become the common aspiration and urgent task of the whole village to start highway construction and raise funds.

Xx village highway is planned to be from Kuzhushan to Miaoshan, with a total length of about 2.5 kilometers. It is planned to be completed and opened to traffic by the end of XX. The highway is built according to the national standard of Tongcun Highway, and the hardened pavement is designed to be 3.5 meters. According to the survey budget, the total investment of this project is about 300,000 yuan. With the national matching funds, it is not enough for xx village to invest in 350 yuan per capita. ) It is really difficult to complete the project only by village-level investment, so we must closely rely on the strength of all the people and work together with Qi Xin to build a broad road.

Here, the two committees of xx Village Branch issued an initiative: I hope that the broad masses of party member cadres and masses in the village, out-of-town sages, private entrepreneurs, and people of insight from all walks of life will lend a helping hand, make money and make a strong contribution. No matter how much they donate, we are grateful, even a little strength will be our support. We promise that all donors will be uniformly issued receipts by the village Committee and a financial supervision team will be set up for special purposes. All donations are arranged in sequence according to the amount, and the names and amounts of donors are engraved on the tablet; Where an individual donates more than 500 yuan and the enterprise donates more than 1000 yuan, the personal name and enterprise name (legal person name) shall be engraved on the stone, so that people and future generations will always remember the merits and demerits of the donor. Besides, it is widely publicized.

It is difficult to build roads for a while, but it is difficult to rot for a lifetime! I sincerely hope that we will unite as one, unite as one, the road will be updated, and the tomorrow of xx will be more brilliant!

I look forward to your support and your letter.

Article 2 of the Road Construction Agreement Party A: xxxxx Association

Party B: xxxxx Association

In order to adapt to economic development and speed up rural infrastructure construction, we should first build roads, develop rural economy, increase farmers' income, and make way for every village. X Society in Chongfo Village, Longshi Town needs to pass through X Society and X Society in Sanbei Village for rural road construction. According to the villagers' system of "one thing, one discussion" and in line with the principles of openness, fairness and justice, the following agreement is reached through consultation among Chongfo Village Committee, Sanbei Village Committee and the masses of Party A and Party B:

A, build a 6-meter-wide maoji highway from Team 3 in Sanbei Village to Team 12 in front of Huangfashu to the dam in front of xx brick house in Li Jiawan, Chongfo Village.

Second, occupy three plots of land in Twelve Monuments Society and replace the land with the replacement method of 1: 2. The land area of xxx field of No.12 Society of Beicun is * * * with xx mu, and the square field cultivated by No.1 Society of Chongfo Village has been replaced.

3. Three-piece admission fee for the 12th social club in Beicun, the first social club that worships Buddha, xx yuan.

Four, such as the construction of roads in communities other than Buddhist villages, must be approved by both parties before construction.

5. If Chongfo No.1 Society has heavy trucks pulling things and damaging three roads in Beicun, Chongfo X Society will handle the maintenance.

Party A: X Club, Chongfo Village, Longshi Town

Party B: X Society and X Society in Sankuai North Village, Longshi Town.

Representative of Party A (signature): Representative of Party B (signature):

Certifying party: XXXXXXXX Certifying party: XXXXXXXX

Year, month, sun, moon, sun.

Dear leaders and villagers,

Hello everyone!

As we all know, there is no road for elephants in our village, and the road surface is uneven. Villagers are often covered with dust in sunny days and mud in rainy days. In fact, the village has long wanted to harden the road, but due to lack of funds, it failed to do so. Today, the village is finally going to build roads. For our village, this is a great good thing, a great event and a great project. For the first time in history, we must do a good job. As a villager who works outside the home, I take the lead to make a gesture, and I donate RMB.

Next, I will talk about three ideas:

First, why build roads?

As the saying goes, "If you want to be rich, you should build roads first" and "roads lead to all kinds of industries". Everyone must have heard of the village in Lingchuan County, Shanxi Province, which was once a poor and backward mountain village. Village, consisting of 17 natural villages, * * * has more than 200 households with more than 800 people. Their ancestors fled into the mountains in ancient times of war and famine. There are four mountains separated here, and the uphill and downhill are cliffs. For thousands of years, they have lived a primitive life of self-reliance, reclaiming land, planting trees, grazing and cutting firewood in ditches, just like a "paradise". After liberation, people here also yearn for a new life, but the closed living environment makes them unable to get rid of the predicament: a large number of fruits rot, a large number of medicinal materials are soaked in dung and burned, and flocks of pigs and sheep can't get out of the mountains; I was sick and swallowed halfway. The girl outside the mountain doesn't marry here, except for changing relatives, she is only single. 1962, a deputy secretary of the county party Committee went to the countryside and rode his horse to the cliff head, but he couldn't find the way down the mountain, which scared the horse to death. After returning, he specially allocated 3000 yuan to build roads for the villagers. The 3,000 yuan was put in a basket, hanged from the cliff and sent to the village. Since then, the villagers have begun a difficult and long road construction process.

In the process of road construction, they invited engineers to boldly and innovatively formulate the road construction scheme of "building by the mountain, digging holes along the cliff, slagging out from the skylight and spiraling up". In order to raise money, they took out their savings to marry a daughter-in-law, gave a dowry, donated coffin money and sold their meager property. The village committee sold all the collectively owned trees, cattle, sheep and breeding houses, and even mortgaged several offices. They are determined to burn their bridges and fight to the death. Party member Commando, Youth Commando, Singles Death Team and Women Frontline Team have been set up in the village ... All men, women and children in the village are engaged in road construction. In June 199 10, the road was finally opened. When the first car came in, all the people in the village, men, women and children, lit a group of firecrackers, and firecrackers and cheers rang everywhere on the road, in the village and in the whole ravine.

596,000 yuan was invested in this road, with 2108,000 person-days, 230,000 cubic meters of earth and stone were moved, and more than 20xx meters of tunnels were drilled. 30 spring and autumn, two lives, people used the blood and bones of several generations to build a road to the outside world, a road to economic turnaround, and a road to heroes. Now, people in that place live a happy life, and it has become a tourist attraction, attracting a large number of Chinese and foreign tourists.

Why tell this story? I just want to say one fact. We should rely on our strength to build a popular road. Why build roads? That is, we can't live like this.

Second, why should we raise funds?

First of all, the funds allocated by the state to the county for road construction are limited every year, and the funds for key projects in the county are also limited every year. If we build roads with state funds, I don't know if we will wait until the day of birth. Therefore, in the case of necessity, our village came up with the idea of raising funds to build roads. I think this idea is feasible. Why? Because this road is 3.5 kilometers long. According to the cost estimation of cement and Bai Qing in the market at present, it will cost about 1 ten thousand yuan. Our village has a population of 900 yuan on average, so the economic pressure is not too great. Think about the villagers, how much they have to pay to build that wall-hung highway hanging halfway up the mountain and for the happiness of their children and grandchildren. Compared with us, the difficulty we encountered is really nothing.

Secondly, there is a saying that unity is strength, and road construction is a major event related to the interests of the villagers in this village. It is everyone's business, not only the village cadres' business, but also the construction team's business. So rich and powerful, everyone in the village, men and women, old and young, all contribute a little bit and pay a little money. There is no mountain of fire that can't be crossed, and there are no difficulties and obstacles that can't be crossed. At the same time, everyone should make suggestions, manage and supervise this fund, make good use of steel, be careful and never waste a penny of the hard-earned money of the masses. Learn from the villagers and Daqing oil workers. You must go if you can. If there are no conditions to create conditions, you must go. Never stop until you win.

Third, raising money to build roads is a feat of hard struggle in our village. Donating money to build roads is also a good thing to express love, warm people's hearts and unite people's hearts. It is also a good thing and practical thing to implement people-oriented and build a harmonious society. Therefore, we need to understand village cadres, understand the difficulties of the country, and actively participate in fund-raising and repair activities.

Third, why should we take the lead in donating money?

As the old saying goes, one side of the soil and water will support one side. A fellow villager who has been away all the year round once told me that people who don't travel far can't feel the friendliness of their hometown. Yes, whenever I leave my hometown, I will never forget to take a look at the mountains and water in my hometown, and I will never forget to say goodbye to my hometown people. I am a wandering migrant worker, and every mountain, water, grass and tree in my hometown have raised me. Kiss or not, fellow villager. Love it or not, although people from hometown are far away from their hometown, they are always concerned about the changes in their hometown, especially the political, economic and cultural construction in their hometown and the construction of a new socialist countryside in their hometown. Building my hometown is everyone's responsibility. As a wanderer working in a foreign land, his roots are in his hometown. In a few years, he is also ready to return to his hometown and contribute to the local economic development. It is natural that he should take the lead in donating money. At the same time, as farmers in the new era, they also have the obligation to pay some money to build their hometown and express their gratitude for the upbringing of their hometown. Therefore, today I want to stand up and express my wishes to you, hoping that my actions can play a role in attracting more villagers to join the team of raising funds to build roads. I believe we will build Qi Xin Road, Xiaokang Road, Fuyu Road, Happiness Road and Fuxing Road like the village, so that the dreams of all our villagers can come true.

1960 February 1 1, which happened to be the Lunar Lantern Festival that year. Just before dawn, there was a clanging hammer and a rumbling explosion from the depths of the cold Taihang Mountain. Since then,/kloc-0.0 million ordinary people have spent ten years on the steep and hard cliffs of Taihang Mountain, and even paid the price of many lives. This river is the "Red Flag Canal" in Linxian County, Henan Province. More than forty years ago, what made such a group of ordinary people spend ten years, even at the cost of their lives, digging thousands of kilometers of artificial Tianhe on the cliff? That is the indomitable "Red Flag Canal" spirit.

Let's carry forward the indomitable spirit of the village and the indomitable spirit of "Red Flag Canal". * * * Together, we will complete this big project, consolidate infrastructure construction, let cars go out, let telephones come in, let roads access, make roads more peaceful year by year, and make our village more beautiful and brilliant.

Thank you all.

Article 4 Owner of Road Construction Agreement: County Agricultural Machinery Supervision Station

Contractor: Yang Haicang

According to the Contract Law of People's Republic of China (PRC) and other relevant laws and administrative regulations, Party A subcontracts the rural road construction project from Shangcheng Town of Saisishi Town to Mazatang Village to Party B, who is responsible for the construction. Following the principles of equality, voluntariness, fairness, honesty and credibility, both parties reached a consensus on the construction of this construction project, and defined the rights and obligations of both parties, and entered into this agreement through consultation.

I. Overview of the Project

Project Name: Rural Highway Construction Project from Shanggu Town to Mazatang Village, Saisisi Town

1, subgrade length 5 km, pavement width 3. 5 meters, with a total decoration area of 1.75 million square meters, and the bid price of 30,000 yuan.

2. The road surface is 5 kilometers long and the road surface is desertification 3. 5 meters, thickness 15 cm, total desertification area 17500 square meters, bid price120,000 yuan.

3. Laying four culverts with a depth of 3. 5 meters, the winning bid amount is 20,000 yuan.

Project content: subgrade treatment, sand surface, small bridge and culvert, shoulder cultivation.

Second, the scope of project contracting

Scope of contract: all contents of construction design.

Three. Project price and payment method: total agreed price (in words): RMB one hundred and sixty thousand Yuan only (RMB): 65,438+600,000 Yuan.

The project price shall be paid in installments according to the progress of the project, and the final accounts shall be made after the project is accepted. Party A shall deduct 5% of the total project price as quality deposit, and pay it to Party B after the project is completed without quality defects.

Four. Rights and obligations of both parties:

1. Party A shall provide the drawings, and Party B shall carry out the construction according to the drawings and technical specifications of the highway reconstruction project, and ensure the quality is qualified.

2. Party B must start work within 3 days from the date of signing the agreement.

3. Party A has the right to supervise and manage Party B's construction, and Party A shall inspect and accept Party B's construction according to the construction progress, and the construction of the next working procedure can be carried out only after it is qualified.

4. Without the consent of Party A, Party B shall not change the project manager, otherwise, Party A has the right to terminate the agreement.

5. Party B shall not subcontract the project without the consent of Party A. Otherwise, once verified, Party A has the right to terminate the agreement and will not bear any legal responsibilities arising therefrom.

6. During the construction period, Party B shall ensure the construction safety. In case of work-related injuries and other safety accidents, Party B shall be responsible. If Party B's construction causes damage to the property or personal of the state, collective and individual, Party B shall be responsible for compensation.

7. Party A is responsible for coordinating and handling disputes in the construction process.

8. All taxes and fees required for the construction shall be borne by Party B. ..

Verb (abbreviation of verb) liability for breach of contract:

1. Party B must complete the project on time, otherwise, Party B shall pay a penalty of 1000 yuan/day for each day overdue.

2. If Party B terminates the agreement halfway, Party A will not compensate for the investment in the previous construction, and the project price allocated by Party A will be returned by Party B. ..

3. If Party A's acceptance of the project quality is unqualified and needs to be reworked and repaired, Party B will unconditionally rework and repair it until it reaches the required standard, and the losses shall be borne by Party B..

4. If Party A terminates this Agreement without reason and causes losses to Party B, Party A shall be responsible for compensating Party B for the losses. If the quality of the project does not meet the standard and needs to be reworked and repaired, and Party B refuses to rework and repair, Party A has the right to terminate the agreement and terminate the contract relationship, and the investment loss shall be borne by Party B, and the project price allocated by Party A shall be returned by Party B. ..

VI. Term of the Agreement:

Commencement date: September 25th, XX.

Completion date: XX year165438+1October 25th.

The total calendar days of the agreed construction period is 60 days.

Seven, quality standards

Engineering quality standard: qualified.

Eight, the contractor promises to the employer to carry out the construction and completion in accordance with the contract, and undertake the project quality warranty responsibility within the quality warranty period.

IX. The Employer promises that the Contractor will pay the agreed price and other payments in the time limit and manner agreed in the agreement.

X. Entry into force of the Agreement

Date of signing the agreement: April, XX 18.

Signing place of the agreement: Saisisi Town, Tianzhu County

This agreement shall come into force after being signed and sealed by both parties.

Employer: (official seal)

Contractor: (official seal)

Article 5 of the Road Construction Agreement Party A: xxx Association

Party b: xxx club

In order to adapt to economic development and speed up rural infrastructure construction, we should first build roads, develop rural economy, increase farmers' income, and make way for every village. X Society in Chongfo Village, Longshi Town needs to pass through X Society and X Society in Sanbei Village for rural road construction. According to the villagers' system of "one thing, one discussion" and in line with the principles of openness, fairness and justice, the following agreement is reached through consultation among Chongfo Village Committee, Sanbei Village Committee and the masses of Party A and Party B:

A, a 6-meter-wide maoji highway will be built from Sanbei Village No.3 Team to No.12 Team, Huangfashu No.12 Team to Li Jiawan xx Front Brick House Dam and Chongfo Village No.1 Club.

Second, occupy three plots of land in Twelve Monuments Society and replace the land with the replacement method of 1: 2. The land area of xxx field of No.12 Society of Beicun is * * * with xx mu, and the square field cultivated by No.1 Society of Chongfo Village has been replaced.

3. Three-piece admission fee for the 12th social club in Beicun, the first social club that worships Buddha, xx yuan.

Four, such as the construction of roads in communities other than Buddhist villages, must be approved by both parties before construction.

5. If Chongfo No.1 Society has heavy trucks pulling things and damaging three roads in Beicun, Chongfo X Society will handle the maintenance.

Party A: X Club, Chongfo Village, Longshi Town

Party B: X Society and X Society in Sankuai North Village, Longshi Town.

Representative of Party A (signature): Representative of Party B (signature):

Certified by: xxx Certified by: xxx

20xx x month x day 20xx year x month x day

Agreement on Road Construction Article 6 In order to facilitate people's travel, the xxx village committee discussed that, with the consent of the people, it is necessary to occupy 2 mu of villagers' responsibility farmland in order to win external funds to build roads in the village. Through consultation between the two village committees, xxx agreed that xxx village committee should compensate 600 Jin of grain per mu every year, and reached an agreement (the grain should be paid in one lump sum according to the market price). After the agreement is signed, xxx will dismantle the attachments on the ground within one month, and xxx village can be constructed.

Party a: xxx village Committee xxx

Party b: xxx village Committee xxx

Party C: xxx

Xxx year165438+1October 2.

Dear villagers, brothers and sisters, friends from all walks of life in Goupitan,

Hello!

First of all, let me sincerely greet you and wish you good health, all the best and a happy family!

In the past 20xx years, your work will be smooth sailing, your career will flourish, your life will be satisfactory and your career will be full of vitality. Learning must be improved every day, and the position must be steadily promoted.

From Taiping Tea Farm to Moziwan, there is a section of the road for the elderly to pick healthy water, which is still uneven. It is very difficult to walk at present, and it is extremely unsafe for the elderly to walk this road. Therefore, it is our common wish to build a healthy road from Taiping Tea Farm to Moziwan. To this end, the Party branch of the Private Association and the Goupitan Branch of the yuqing county Chamber of Commerce actively raised funds for the construction of this healthy road, calling on all members of party member and the Chamber of Commerce to save money and donate 3,000 yuan. The action was strongly supported by the town party Committee and government, and 20 tons of cement were solved. However, due to the project budget of more than 30,000 yuan, the funding gap is large. It is difficult to implement the construction only by relying on the party branches and chambers of commerce of individual private associations. We must rely on everyone's strength and cohesion to build a healthy road. Here, the Party branch of the Private Association and the Goupitan Branch of the yuqing county Chamber of Commerce issued an initiative: fellow villagers, brothers and sisters and friends from all walks of life take active actions, give generously and donate enthusiastically. Dear fellow villagers, brothers and sisters, friends from all walks of life: we are deeply honored by your support and response, and the fellow villagers are very grateful! Let's wish the old people a long and healthy life on this healthy road. We look forward to your support and await your good news.

Party A: X Club, Chongfo Village, Longshi Town.

Party B: X Community, Sankuai North Village, Longshi Town

In order to adapt to economic development and speed up rural infrastructure construction, we should first build roads, develop rural economy, increase farmers' income, and make way for every village. X Society in Chongfo Village, Longshi Town needs to pass through X Society and X Society in Sanbei Village for rural road construction. According to the villagers' system of "one thing, one discussion" and in line with the principles of openness, fairness and justice, the following agreement is reached through consultation among Chongfo Village Committee, Sanbei Village Committee and the masses of Party A and Party B:

A, a 6-meter-wide maoji highway will be built from Sanbei Village No.3 Team to No.12 Team, Huangfashu No.12 Team to Li Jiawan xx Front Brick House Dam and Chongfo Village No.1 Club.

Second, occupy three plots of land in Twelve Monuments Society and replace the land with the replacement method of 1:2. The land area of xxx field of No.12 Community in Beicun is * * * with xx mu, and the square field cultivated by No.1 Community in Chongfo Village has been replaced.

3. Three-piece admission fee for the 12th social club in Beicun, the first social club that worships Buddha, xx yuan.

Four, such as the construction of roads in communities other than Buddhist villages, must be approved by both parties before construction.

5. If Chongfo No.1 Society has heavy trucks pulling things and damaging three roads in Beicun, Chongfo X Society will handle the maintenance.

Party A: Club X of Chongfo Village in Longshi Town Party B: Club X of Sanbei Village in Longshi Town (signature): Representative of Party B (signature):

Prover: Longshi Town Worship Buddha Village Committee Prover: Longshi Town Sankuai Monument Village Committee.

Year, month, sun, moon, sun.

Article 9 of the Road Construction Agreement Party A: Youmacun Formation of Matouqiao

Party B: Shaoyang Jinma Mining Development Co., Ltd.

In accordance with the Contract Law of People's Republic of China (PRC) and other relevant laws and administrative regulations, and following the principles of equality, voluntariness, fairness and good faith, Party A and Party B have reached the following agreement on Shaoyang Jinma Mining Development Co., Ltd. (hereinafter referred to as Party B) using the land of Youmacun Formation in Matouqiao Town to build an 8-meter-wide traffic road:

I. Coverage: Youmacun Formation.

Two, land occupation compensation and payment methods:

Building roads is a good thing for the benefit of local people and should be supported by the majority of villagers. Now the company makes appropriate compensation for land occupation, and the compensation amount is 1 period (see the attached table after calculating the compensation amount).

Three. Relevant rights and obligations: After signing this contract, Party A guarantees that:

1. Fully cooperate with Party B to measure the forestland area and ensure the normal road construction of Party B;

2, responsible for cleaning the ground attachments, trees, etc.

3. Party A shall cooperate unconditionally to deal with problems such as obstruction of villagers in the construction process.

4. After the road construction is completed, Party B's enterprise shall enjoy the right to use the road free of charge, and Party A shall not obstruct the passage or charge any fees for any reason such as dust and noise.

5. After the road is completed, Party B will often carry out irregular maintenance work, and Party A shall actively cooperate and shall not obstruct it.

6. Party B guarantees that the road section will be hardened in the spring of 20xx, starting from the date when the construction is completed and it passes smoothly. If Party B fails to harden the pavement within the specified time limit,

Party B has the right to control this passage until Party B hardens the pavement, and Party A has no other reason to block the road.

Four. Liability for breach of contract: If Party A breaches the contract, it shall return the land occupation compensation paid by Party B and bear all the economic losses caused to Party B; If Party B breaches the contract, Party A will not refund the land occupation fee and enjoy the right to dispose of the land again.

5. This agreement is made in triplicate, one for each party and one for the local government. This agreement shall come into force as of the date of signing.

Six, during the performance of the contract, in case of matters not covered, both parties shall settle them through consultation. If negotiation fails, a lawsuit can be brought to the court.

Signature (Seal) of Party A

Party B (seal)

legal representative

Witness signature.

Road repair agreement 10 party a:

Party B:

According to the Land Administration Law of the People's Republic of China and other laws and regulations, Party A and Party B have reached the following compensation agreement on the requisition of Party B's cultivated land mu through friendly negotiation:

1. The area of expropriated land is mu.

Two, the use of land requisition, the land is used for:

Three, land acquisition compensation standards and payment methods:

1. The compensation standard for land requisition is calculated according to the compensation standard of RMB \ mu, with RMB for land acquisition compensation and RMB for trees.

2. Payment method: Party A shall pay land acquisition compensation RMB 1 ten thousand Yuan to Party B in one lump sum within days from the date of signing this Agreement.

3. After the signing of this agreement, the ownership will be owned by it, and it will not change due to the change of the national land policy or the change of the term.

4. In the future, the compensation for land acquisition will be increased due to the overall planning of new rural construction, and no additional compensation will be made. This agreement shall prevail.

Four. After signing the contract, Party B shall fully cooperate with Party A to use the land. If it is found that Party A uses the land for other purposes or fails to start construction within one year after the signing of the agreement, it can be unconditionally recovered. Within one year after the signing of this agreement, Party B shall not use the land for other purposes.

Verb (abbreviation of verb) This agreement is made in quintuplicate.

This agreement shall come into effect as of the date of signature. If there is any dispute, both parties shall supplement it after consultation.

Party A:

Party B:

Date of signing this Agreement: (Seal) (Seal) Year Month Day.