The purpose of this inspection is to show the production line and its ideal choice for planned production.
The test will be set as follows:
The buyer will prepare the specified quality materials, and the specified manufacturers and staff will be ready to conduct performance tests at any time.
The accurate test between the buyer and the seller begins with the agreement.
The whole production line runs continuously for 48 hours. During this period, each PECVD reactor completed at least 10 production runs. During the 48-hour test, the production speed of silicon deposition system, sputtering system, all laser scribing systems, ultrasonic welding system and the fourth test should match.
From now on, a batch of broken glass during processing will be removed.
All measurements and classifications of the remaining solar modules of each cardiovascular system are based on the initial rated power.
It has been tested that if 90% of 960 modules (864) have an initial power of 48.8Wp or higher.
This type of production line will improve performance for a period of time.
Dear madam/sir,
According to the supply, installation, commissioning and service agreement, the annual coal consumption rate correction capacity is mentioned. The series thin-layer silicon solar cell module is made of cowhide produced by GREENSOLAR equipment produced in 20 10. (Seller) Heping Fair Price Zhenjiang Solar Energy Technology Co., Ltd. (Buyer)
The Buyer and the Seller hereby propose that all equipment installation, debugging and start-up activities of the production line system, as well as the performance test of the preliminary module and the 60,000 kW production line factory have been completed.
Please indicate the following symbols in the signature column to confirm that the buyer has inspected and tested the module and found that the module meets the requirements of system business and factory test and final performance test preparation.